• Title/Summary/Keyword: Track

Search Result 6,086, Processing Time 0.04 seconds

Systematic Track Maintenance Methods (체계적인 궤도 유지관리방법)

  • Kang, Bo-Soon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1136-1142
    • /
    • 2011
  • The approaches to systematic track maintenance methods set out in this study are only a small part of the many work activities on railway track. The application of modern maintenance technology enhances the value of modern railway operation and enables the track system to be kept in top condition.

  • PDF

A Study of New Analytical Models for Railway Track System (철도궤도 시스템의 신해석 모델연구)

  • 김성득;김미룡
    • Journal of Korean Society of Transportation
    • /
    • v.9 no.2
    • /
    • pp.75-86
    • /
    • 1991
  • A conventional track structure system of rails ties ballast subballast and subgrade. An adequate engineering analysis require consideration of all major components of track system. This paper briefly reviews existing methods of track analysis and presents a new model based of the examination of the Tallbot Model. The new model has been validated by comparision with settlements from other model.

  • PDF

Research on PSNF-m algorithm applying track management technique (트랙관리 기법을 적용한 PSNF-m 표적추적 필터의 성능 분석 연구)

  • Yoo, In-Je
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.6
    • /
    • pp.681-691
    • /
    • 2017
  • In the clutter environment, it is necessary to update the target tracking filter by detecting the target signal among many measured value data obtained via the radar system, the track does not diverge, and tracking performance is maintained. The method of associating the measurement most relevant to the target track among numerous measurement values is referred to as data association. PSNF and PSNF-m are data association methods of SN-series. In this paper, we provide an IPSNF-m(Integrated Probabilistic Strongest Neighbor Filter-m) algorithm with a track management method based on the track existence probability in PSNF-m algorithm. This algorithm considers not only the presence of the target but also the case where the target is present but not detected. Calculating the probability of each caseenables efficient management. In order to verify the performance of the proposed IPSNF-m, the track existence probability of the IPSNF algorithm applying the track management technique to PSNF, which is known to have similar performance to PSNF-m, is derived. Through simulation in the same environment, we compare and analyze the proposed algorithm with RMSE, Confirmed True Track, and Track Existence Probability that show better performance in terms of track retention and estimation than the existing PSNF-m and IPSNF algorithms.

Analysis of Life Cycle Costs of Railway Track : A Case Study for Ballasted and Concrete Track for High-Speed Railway (철도 궤도의 수명주기비용 분석 : 고속철도 자갈궤도와 콘크리트궤도 사례 연구)

  • Jang, Seung Yup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.2
    • /
    • pp.110-121
    • /
    • 2016
  • In the decision-making, such as selection of structure, construction method, or time and scheme of maintenance, the evaluation of life-cycle cost(LCC) is of great importance. The maintenance cost occupy a large portion of the LCC of the railway track as well as the initial construction cost. Futhermore, the proportion of the maintenance cost is much higher in the ballasted track. Thus, the importance of the LCC evaluation is higher than in any other engineering structures. In this study, a LCC model that can consider various design parameters such as the type of track structure, annual traffic volume, axle load, train speed, and proportion of curve sections and engineering structures has been developed. Fundamental data for calculating costs also have been presented. Based on the model and data proposed, the trends in the variation of LCC according to the design parameters were examined and the most important design parameters in the LCC analysis of railway track were investigated. The results show that the proportion of renewal and operational costs is much higher in the ballasted track than in the concrete track, and the annual traffic volume and ballast taming period are most significant factors on the LCC of the ballasted track. On the contrary, it is revealed that the proportion of the initial construction costs in the concrete track is much higher, and the LCC of the concrete track is less sensitive to the traffic volume, train speed, and axle load.

Sensitivity of the ballast resistance and track irregularity on the track stability (궤도 안정성에 대한 도상저항력과 궤도틀림의 민감도)

  • Lim, Nam Hyoung;Choi, Sang Hyun;Lee, Chin Ok;Sung, Ik Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.5 s.78
    • /
    • pp.519-526
    • /
    • 2005
  • During summer, very high compressive force occurs on the continuous welded rail (CWR) track because of the increase of rail temperature (max. $60^{\circ}C$). This extreme temperature stress can cause the CWR track to buckle. Among many CWR parameters affecting the track buckling, the influence of the lateral and longitudinal ballast resistance was investigated on the stability of the CWR track in this study. Also, the sensitivity of the track irregularity such as the alignment defect and the gauge irregularity was investigated.

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

An Experimental Study of Diminution of Ballast Track Bridges Vibration due to the Variation of Ballast Depth (도상두께 변화에 따른 유도상교량 궤도 진동저감의 실험적 연구)

  • Kwon, Soon-Jung;Lee, Sang-Bae;Hong, Cheng-Hi
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1222-1229
    • /
    • 2011
  • Railway bridges are divided into ballastless and ballast track bridges. The ballast abrasion occurs on the ballast track upon bridges more than soil roadbed because the track vibration occurs a lot in the ballast track upon bridges due to girder vibration when a train's weight is loaded onto track even though the identical ballast is used. The phenomena of mud pumping especially, which occurs when drainage is not properly secured for heavy rain, leads to the increase of maintenance work load and the decline of ride comfort. There are countermeasures such as ballast change, installation of cross-drainage for poor drainage, gutter establishment, ballast lifting methods, ballast mats and resilient sleepers laying for the mud pumping. The ballast thickness range in domestic railroad construction rule is uniformly set up according to the design speed of railroad and passing tonnage of train without considering field conditions which is considered in foreign railroad companies. The purpose of this study is to verify the effect of vibration decrease by measuring the acceleration, displacement and ride comfort of ballast track with the change of ballast thickness on the ballast track bridges and to suggest the optimal height of ballast on the Yocheon Bridge built for the test in Honam Line.

  • PDF

Development of models for measuring track irregularities using accelerometers (가속도계를 이용한 궤도틀림 측정용 모델의 개발)

  • Lee, Jun-Seok;Choi, Sung-Hoon;Kim, Sang-Soo;Kim, Seog-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.303-310
    • /
    • 2011
  • This paper is focused on development of models for measuring lateral and vertical track irregularities from corresponding accelerometers of an in-service high-speed train. Generally, the track irregularity was measured by a special railway inspection vehicle or system with contact or non-contact sensors. However, the sensors are very expensive and vulnerable to a harsh environment. Displacement estimation from an inertial measurement unit and its wave-band filtering was already developed in the previous study, and it was found that their results included not only the track irregularities but also other information such as phase delay of the applied filters, and suspension and conicity of the wheel. To identify the track irregularities from those results, a compensation filtering method was proposed. Each directional compensation filter was derived by using a system identification method with the estimated directional displacement as input and the corresponding track irregularities as output. In this paper, they are integrated into a model for each direction and applied to the measured lateral and vertical acceleration data from the axle-box and bogie of an in-service high-speed train. Their results are compared with the data from the track geometry measurement system. From the comparison, the proposed models are a useful tool for the measurement of the track irregularities using accelerometers of in-service high-speed trains.

  • PDF

Track Improvement Study Guide for Speed-up Conventional Railway (간선철도 속도향상을 위한 궤도개량 연구방향)

  • Kim, Hwan-Yung;Lee, Dong-Ho;Kim, Si-Chul;Gong, Byung-Gun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2456-2463
    • /
    • 2011
  • Conventional railways are less competitive than other land transportation means in term of speed, and thus users preference and transportation share for rail system are relatively lower than others. For example, most of the conventional lines except the Seoul~Busan corridor run at an average speed of 70 km/h or less, which imposes certain constraints on roles and functions as the trunk lines. In this regard, the speed of the conventional lines should be improved up to 200 km/h to gain competitiveness, promote balanced regional development and lead the era of low carbon green growth. As track system is one of the most important elements for the speed-up, it is critical to come up with optimum technical solutions. Improvement of ballast track structure with efficient track installation can provide structural stability for higher speed and ensure operational safety with lower maintenance efforts. Thus, this study focuses on consequences followed by the speed-up including increase of load imposed on the track and impacts on track components, and provide solutions for track maintenance by analyzing impact on the track structure by speed. Also, it compares ballast and concrete tracks under designing and construction and considers how to meet needs for passengers comfort and environmental requirements as a strategic approach.

  • PDF