• Title/Summary/Keyword: Track

Search Result 6,109, Processing Time 0.035 seconds

Study on vibration energy characteristics of vehicle-track-viaduct coupling system considering partial contact loss beneath track slab

  • Liu, Linya;Zuo, Zhiyuan;Zhou, Qinyue;Qin, Jialiang;Liu, Quanmin
    • Structural Engineering and Mechanics
    • /
    • v.75 no.4
    • /
    • pp.497-506
    • /
    • 2020
  • CA mortar layer disengagement will give rise to the overall structural changes of the track and variation in the vibration form of the ballastless track. By establishing a vehicle-track-viaduct coupling analysis and calculation model, it is possible to analyze the CRTS-I type track structure vibration response while the track slab is disengaging with the power flow evaluation method, to compare the two disengaging types, namely partial contact loss at one edge beneath track slab and partial contact loss at midpoint beneath track slab. It can also study how the length of disengaging influences the track structures vibration power. It is showed that when the partial contact loss beneath track slab, and the relative vibration energy level between the rail and the track slab increases significantly within [10, 200]Hz with the same disengaging length, the partial contact loss at one edge beneath track slab has more prominent influence on the vibration power than the partial contact loss at midpoint beneath track slab. With the increase of disengaging length, the relative vibration energy level of the track slab grows sharply, but it will change significantly when it reaches 1.56 m. Little effect will be caused by the relative vibration energy level of the viaduct. The partial contact loss beneath the track slab will cause more power distribution and transmission between the trail and track slab, and will then affect the service life of the rail and track slab.

A Study on Relationship between Track Impact Factor and Track Support Stiffness of Turnout System on Urban Transit (도시철도 분기기 궤도구조의 궤도지지강성과 궤도충격계수의 상관관계에 관한 연구)

  • Choi, Jung-Youl;Park, Jong-Yoon;Lee, Kyu-Yong;Chung, Jee Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.461-466
    • /
    • 2020
  • In this study, the relationship between the track support stiffness and the track impact factor for a sleeper floating track and a turnout system with wood ties currently employed in Korean urban transit was assessed by performing field tests using actual vehicles running along the service lines. Field tests were performed on four track systems (i.e., sleeper floating track, and point, lead and crossing sections of turnout system). The theoretically designed track impact factor and track support stiffness were compared with the corresponding track impact factor and track support stiffness measured through field tests for the target tracks on the service line. The track impact factor for the service line appeared to increase with the deviation of track support stiffness according to vehicle driving direction; therefore, it was inferred that the deviation of track support stiffness between each track section directly affected the track impact factor.

Research directions for maintenance criteria in Slab Track (콘크리트궤도 유지보수기준 정립을 위한 연구방향)

  • Eom, Jong-Woo;Lee, Myung-Suk;Kwon, Jin-Soo;Kim, Soo-Jung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.979-987
    • /
    • 2011
  • The Ballast Track has been widely applied in traditionally due to low initial cost and abundant elastic property. But the disadvantages of Ballast track are; labor-intensive and costly maintenance, weak in high-speed and heavy axial load, in additionally need wide cross section of tunnel and massive substructure in viaduct. Therefore, recent applications tend to more and more towards slab track such as Gyeungbu high speed rail and existing line. The slab track increased the stability, resistance and durability of track, and save maintenance cost compare to the Ballast Track. But the slab track have weakness of track elongation by sub-ballast differential settlement and that threat safety of train operation. Therefor the slab track need to prevent cracks in concrete ballast for insure the durability of slab track. In this paper, review main items and its expected effects of the slab track maintenance standards that control sub-ballast settlement and concrete ballast cracks.

  • PDF

Vibration Characteristics of High-speed Railway Lines on the Type of Track (고속철도 궤도 타입에 따른 진동 특성)

  • Lee, Chan-Woo;Ham, Ham-Young;Kim, Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.332-336
    • /
    • 2011
  • IN THIS STUDY, BASED ON THE TYPE OF HIGH SPEED RAILWAY TRACK VIBRATION CHARACTERISTICS WERE MEASURED AT KTX VEHICLE. KTX ROUTE BALLASTED TRACK HAS BEEN INSTALLED TOGETHER WITH THE CONCRETE TRACK. CONCRETE MUST BE TRACK IRREGULARITY THAN BALLASTED TRACK, VEHICLES VIBRATION VALUES THAT ARE SMALLER. ALSO, IN TERMS OF MAINTENANCE, CONCRETE TRACK IS KNOWN TO BE MORE FAVORABLE THAN THE BALLASTED TRACK. PHASE 2 IS THE KTX, DAEGU - BUSAN IS A SECTION OF CONCRETE TRACK. IN THIS STUDY, "KUUNG-BU HIGH-SPEED RAILWAY LINES" INSTALLED ON THE CONCRETE TRACK AND BALLASTED TRACK KTX FROM THE VEHICLE WHEN INSTALLED BETWEEN RAILS, SLEEPER AND BALLAST ON THE TRACK WAS MEASURED VIBRATIONS.

  • PDF

Optimal Design of Cement Mortar Pouring type Paved Track (시멘트모르터 충진형 포장제도의 최적 설계)

  • Lee, Il-Wha
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.222-229
    • /
    • 2006
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. Because construction environment is very limited, cost is expensive and it has very complicated behavior. On this paper, structural characteristics of the paved track are investigated using the 3D finite element analysis to verify the optimized structure of the CMP track.

Development direction for Korea track management system with analyzing overseas instances (해외사례 고찰을 통한 한국형 궤도관리 시스템 개발 방향)

  • Woo, Byoung-Koo;Lee, Choon-Kil;Park, Hyun-Woo;Yang, Ki-Hoon;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.358-368
    • /
    • 2007
  • At this current, KORAIL track maintenance system has been worked with the method of corrective maintenance which is repaired some location exceeded the track management criteria as a result of track measurement. It brings about a lot of additional expenses that the corrective maintenance might be a way of missing an appropriate maintenance time, after occurring some trouble on the track due to track maintenance characteristic. We sincerely need a track maintenance system including the concept of preventive maintenance that track is corrected with predicting the trend of track irregularity. I would like to present a development direction for Korea track maintenance system having a good application in our track with analyzing TRAMS21 and RAMSYS as overseas railway company has operated a track maintenance system.

  • PDF

Performance Evaluation of Track-to-track Association and fusion in Distributed Multiple Radar Tracking (다중레이다 분산형 추적의 항적연관 및 융합 성능정가)

  • Choi, Won-Yong;Hong, Sun-Mog;Lee, Dong-Gwan;Jung, Jae-Kyung;Cho, Kil-Seok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.6
    • /
    • pp.38-46
    • /
    • 2008
  • A distributed system for tracking multiple targets with a pair of multifunction radars is proposed and implemented. The system performs track-to-track association and track-to-track fusion at the fusion center to form fused tracks. The association and fusion are performed using target state information linked via communication nodes from a radar at a remote location. Many factors can affect the track-to-track association and fusion performances. They include delays in data transmission buffer of the remote radar, the error in estimating time-stamp of the remote radar, and the gating in track-to-track association. The effects on association and fusion performances due to these factors are investigated through extensive numerical simulations.

Evaluation of the Dynamic Stability of Subway Bridge in the Applying B2S Track (B2S궤도 적용에 따른 철도교량의 동적안정성 검토)

  • Kong, Sun-Yong;Kim, Sang-Jin;Baik, Chan-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.20-27
    • /
    • 2009
  • This paper presents an analytic study for replacement of the ballast track in existing subway bridge by the Precast slab panel(B2S) track. To evaluate the dynamic responses on application of B2S track, the time history analysis with the 3D modeling. A total of two models, which were one ballast track bridge and B2S track bridge, were used in the FE analysis. The results of this study show that the dynamic displacement and acceleration of the B2S track bridge were significantly reduced for a higher train speed, compared to the ballast track bridge. Also, the replacement of the ballast track bridge in existing subway bridge by the B2S track increased the structural safety of bridge and ensured sufficient dynamic stability and serviceability. As a result, the servicing subway bridge with B2S track system has need of the reasonable measures which could be reducing the static and dynamic response and improving the performance.

  • PDF

A Study on the Distance Between the Track Circuits Using Identical Frequency in Railway Track Circuit System (철도궤도회로시스템에서 동일한 주파수를 사용하는 궤도회로 사이의 이격거리에 대한 연구)

  • Kim, Min-Seok;Lee, Jong-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2168-2174
    • /
    • 2009
  • Electrical railway system consists of rolling stock, track, signal and streetcar line system. Track circuit system is a vital system due to checking the location of trains. Track circuits are divided by using frequency and isolated electrically. Currently, there is not a regulation for the distance between track circuits using identical frequency. In case of installing additional track circuits in large stations or marshalling yard, the problem which is that the signal is not exactly transmitted to the track circuit occurs due to the mutual interference. In other words, the track circuit properly is not operated on account of wrong induction current by the mutual inductance between track circuits. In this paper, we suggest the electrical model between track circuits and numerically calculate demanded parameters in electrical model. The distance between track circuits satisfying the mutual inductance which does not happen to the mutual interference phenomenon is presented about the distance of track circuit. It is proved by using Matlab and PSpice program as the amplitude of mutual induced current.

Design Technique for Track Shoe Body of Military Vehicles (군용 궤도류 궤도몸체 설계 방법론 연구)

  • Shin, Cheolho;Oh, Yeong Min;Park, Ji Soo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.17 no.2
    • /
    • pp.77-82
    • /
    • 2018
  • Track shoes improve the off-road driving ability of tanks. The strength of the track shoe body directly affects the driving ability of tanks, self-propelled artillery, and armored vehicles. In this study, the design technique for track shoe body was investigated. To select the optimal design of track shoe body, three track shoe body models were suggested and compared. Tensile strength was calculated using computer-aided engineering (CAE) analysis. Compressive tests were conducted using the original tank sprocket because sprocket compression is critical to the lifespan of the track shoe body. As a result, one track shoe body design was selected and the process of track shoe body design was described.