• Title/Summary/Keyword: Total removal

Search Result 1,869, Processing Time 0.027 seconds

Treatment of Pollutants in Free Water Surface Constructed Wetlands with Lotus (Nelumbo nucifera) Cultivation Pond (연 재배지를 활용한 자유수면형 인공습지의 수질정화효율)

  • Han, Myung-Ja;Seo, Dong-Cheol;Kang, Se-Won;Lee, Yong-Chol;Bang, Seok-Bae;Chae, Jung-Heon;Kim, Kap-Soon;Park, Jong-Hwan;Chang, Nam-Ik;Heo, Jong-Soo;Cho, Ju-Sik
    • Journal of Applied Biological Chemistry
    • /
    • v.53 no.4
    • /
    • pp.232-238
    • /
    • 2010
  • In order to investigate the treatment efficiency of pollutants in free water surface constructed wetlands (FWS CWs) with lotus (Nelumbo nucifera) cultivation pond, the experiment was consisted of two sites (site I and II) in Lake Juam, Korea. The sites were configured a lotus cultivation pond (with fertilizer application) - a dropwort bed - a reed bed for site I, and a lotus cultivation pond (without fertilizer application) - a dropwort bed - a reed bed for site II. Removal rate of COD in site I and II were 13.3% and 26.0%, respectively. Removal rate of total nitrogen (TN) was 29.7% for site I, and 36.3% for site II. Removal rate of total phosphorus (TP) in site I and II were 36.0% and 36.5%, respectively. COD, TN and TP in effluent from site I (with fertilizer) was higher than that in site II (without fertilizer), showing that COD, TN and TP in effluent were strongly influenced by fertilizer addition. Therefore, in order to satisfy established water-quality standards, the amount of fertilizer used in lotus cultivation showed be evaluated.

Effects of dolomite addition on phosphorus removal by chemical coagulation of secondary treated effluent (백운석 첨가가 응집에 의한 하수 처리수의 인 제거에 미치는 영향)

  • Lee, Byung-Ha;Park, Joon-Hong;Cha, Ho-Young;Maeng, Sung-Kyu;Song, Kyung-Guen
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.3
    • /
    • pp.443-451
    • /
    • 2012
  • Wastewater treatment plants need to reduce phosphorus in order to meet increasingly stringent regulations on phosphorus. This study evaluated the feasibility of dolomite as a coagulation aid to enhance phosphorus removal from secondary treated wastewater by chemical coagulation. Standard jar tests were conducted to evaluate the effect of dolomite addition on a coagulation process for phosphorus removal and to determine the optimum doses of coagulants and dolomite. Coagulants used with dolomite yielded a significant improvement in phosphorus removal and reduced total phosphorus concentrations below 0.02 mg/L in wastewater effluent. Dolomite has played an important role in enhancing phosphate adsorption and increasing pH, as a coagulation aid. The maximum removal efficiency of phosphorus in this study was yielded at 25 mg/l of dolomite and 20 mg Al/L of PAC dose. However, considering economic aspects, the optimum doses of dolomite and PAC were 10 mg/L and 15mg Al/L, respectively. Consequently, dolomite, a coagulation aid, can be used in coagulation processes to enhance the removal of phosphorus.

Effect of Protein Concentration on Foam Separation in a Seawater Aquarium (해수활어수조의 포말분리시 단백질 농도의 영향)

  • SUH Kuen-Hack;SHIN Jeong-Sik;LEE Chang-Kuen;LEE Seok-Hee;CHEON Jae-Kee;JO Jae-Yoon
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.37 no.1
    • /
    • pp.18-23
    • /
    • 2004
  • Effect of initial protein concentration on the protein removal rate was assessed for seawater aquarium using a foam separator. Protein removal rate was increased and removal efficiency was decreased with the increase of initial protein concentration. Enrichment ratio was decreased and foam generation rate was increased with the increase of initial protein concentration. Total suspended solids (TSS) removal rate was increased with the increase of initial protein concentration, and TSS removal efficiency was decreased with the increase of initial protein concentration. Turbidity removal rate and removal efficiency were increased with the increase of initial protein concentration.

Evaluation of Electrokinetic Removal of Heavy Metals from Tailing Soils

  • Kim, Soon-Oh;Kim, Kyoung-Woong;Yun, Seong-Taek
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.09a
    • /
    • pp.40-43
    • /
    • 2002
  • Electrokinetic remediation was studied for the removal of toxic heavy metals from tailing soils. This study emphasized the dependency of removal efficiency upon heavy metal speciation, as demonstrated by different extraction methods (sequential extraction, total digestion, and 0.1 N HC1 extraction). The tailing soils examined showed different physicochemical characteristics, in view of initial pH, particle size distribution, and major mineral constituents, and contained high concentrations of target metal contaminants in various forms. The electrokinetic removal efficiency of heavy metals was significantly influenced by their partitioning prior to treatment, and by the pHs of the tailing soils. The mobile and weakly bound fractions of heavy metals, such as exchangeable fraction, were easily removed by electrokinetic treatment (more than 90% in removal efficiency), whereas immobile and strongly bound fractions, such as organically bound and residual fractions, were not effectively removed (less than 20% in removal efficiency).

  • PDF

A Risk Assessment of Asbestos Fiber Leaks to Environment during Asbestos Removal Activity in Buildings (건물 내 석면제거 작업과 공기 중 석면의 외부누출 위험성 평가)

  • Paik, Namwon;Lee, Soungcheoul;Byeon, Jaecheol;Lee, Donghee
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.30 no.4
    • /
    • pp.405-411
    • /
    • 2020
  • Objectives: The objectives of this study were to investigate whether airborne fibers were released to the outside air from the asbestos removal area in buildings, and to confirm the existence of asbestos fibers in samples using transmission electron microscopy(TEM). Methods: A total of 1,295 samples was collected from inside and outside 155 asbestos removal areas. To investigate the release of asbestos fibers from the removal area, samples were collected at three locations, such as an entrance to change room, an exit of negative pressure unit(NPU) and perimeter areas. Samples were also collected in the removal area prior to and after removal activity. All samples were analyzed by phase contrast microscopy(PCM) and one-tenth of the samples was analyzed using TEM to discriminate asbestos fibers. Results: During the asbestos removal activity, 27(4.1%) of 662 samples collected outside the removal area showed airborne fiber concentrations equal to or in excess of 0.01 f/cc, the permissible emission standard of the Korean Ministry of Environment. Further, 111 samples were analyzed using TEM. The distribution of asbestos fiber concentrations was log-normal. It was found that 51 of 111 samples(46%) contained asbestos fibers. Conclusions: There is a potential risk of asbestos exposure among neighbors and the public outside the asbestos removal areas. It is recommended that the asbestos removal work be conducted strictly following the specifications required by government and/or professional organizations.

The effects of different pilot-drilling methods on the mechanical stability of a mini-implant system at placement and removal: a preliminary study (인조골에서 식립 방법이 교정용 미니 임플란트의 기계적 안정성에 미치는 영향에 대한 예비연구)

  • Cho, Il-Sik;Choo, Hye-Ran;Kim, Seong-Kyun;Shin, Yun-Seob;Kim, Duck-Su;Kim, Seong-Hun;Chung, Kyu-Rhim;Huang, John C.
    • The korean journal of orthodontics
    • /
    • v.41 no.5
    • /
    • pp.354-360
    • /
    • 2011
  • Objective: To investigate the effects of different pilot-drilling methods on the biomechanical stability of self-tapping mini-implant systems at the time of placement in and removal from artificial bone blocks. Methods: Two types of artificial bone blocks (2-mm and 4-mm, 102-pounds per cubic foot [102-PCF] polyurethane foam layered over 100-mm, 40-PCF polyurethane foam) were custom-fabricated. Eight mini-implants were placed using the conventional motor-driven pilot-drilling method and another 8 mini-implants were placed using a novel manual pilot-drilling method (using a manual drill) within each of the 2-mm and 4-mm layered blocks. The maximum torque values at insertion and removal of the mini-implants were measured, and the total energy was calculated. The data were statistically analyzed using linear regression analysis. Results: The maximum insertion torque was similar regardless of block thickness or pilot-drilling method. Regardless of the pilot-drilling method, the maximum removal torque for the 4-mm block was statistically higher than that for the 2-mm block. For a given block, the total energy at both insertion and removal of the mini-implant for the manual pilot-drilling method were statistically higher than those for the motor-driven pilot-drilling method. Further, the total energies at removal for the 2-mm block was higher than that for the 4-mm block, but the energies at insertion were not influenced by the type of bone blocks. Conclusions: During the insertion and removal of mini-implants in artificial bone blocks, the effect of the manual pilot-drilling method on energy usage was similar to that of the conventional, motor-driven pilot-drilling method.

Contralateral Submandibular Retropharyngeal Approach for Recurred High Cervical Chordoma

  • Kim, Seok-Won;Shin, Ho
    • Journal of Korean Neurosurgical Society
    • /
    • v.39 no.3
    • /
    • pp.231-233
    • /
    • 2006
  • The C2 level is the transition zone between the cranial and cervical spine. Because of its high position and anatomic relationship to vital structures, exposing C2 is challenging and the surgical approach is controversial. We report a of a recurred chordoma in C2 portion, occupying the osseous intraspinal portion. The patient underwent total corpectomy of C3 and gross total removal of tumor by right submandibular approach 3 years previously. We performed a lateral extrapharyngeal approach from contralateral left side with resection C2 central portion followed by gross total removal of mass and placement of graft bone. Although there was transient hypoglossal nerve palsy postoperatively, the patient had full recovery.

Industrial-scale biological treatment of Chinese nutgall processing wastewater by combined expanded granular sludge bed and bio-contact oxidation

  • Wu, Yundong;Zhou, Kanggen;Dong, Shuyu;Yu, Wei;Liang, Chunsheng
    • Environmental Engineering Research
    • /
    • v.20 no.4
    • /
    • pp.336-341
    • /
    • 2015
  • The industrial-scale biological treatment of Chinese nutgall processing wastewater was conducted with a $200m^3$ expanded granular sludge bed reactor and a $900m^3$ bio-contact oxidation reactor. The temperature of the two reactors was controlled under mesophilic conditions ($32-40^{\circ}C$), through changing the proportion of the dilution water, which was composed of steam condensation water and residual circulating water. The effluent COD, gallic acid, chroma, total nitrogen, total phosphorus levels and pH of both the expanded granular sludge bed and bio-contact oxidation reactors were monitored. In addition, the redox potential in the expanded granular sludge bed was recorded. The total COD removal efficiency was 87.257% when the influent COD concentration was $14\;251{\pm}3\;148mg/L$, and the ratio of wastewater: dilution water was 1:5. The removal efficiencies of gallic acid, chroma, total nitrogen, and total phosphorus were 72.221%, 43.940%, 64.151% and 39.316%, respectively. The effluent pH increased in either the expanded granular sludge bed reactor or the bio-contact oxidation reactor during the operation. The redox potential in the expanded granular sludge bed varied between -367 mV and -435 mV. The results indicate that the combined process was suitable for treating Chinese nutgall processing wastewater.

An efficient algorithm for scheduling parallel machines with multiple servers (다중 서버를 사용하는 병렬 머신 스케줄링을 위한 효율적인 알고리즘)

  • Chong, Kyun-Rak
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.6
    • /
    • pp.101-108
    • /
    • 2014
  • The parallel machine scheduling is to schedule each job to exactly one parallel machine so that the total completion time is minimized. It is used in various manufacturing system areas such as steel industries, semiconductor manufacturing and plastic industries. Each job has a setup phase and a processing phase. A removal phase is needed in some application areas. A processing phase is performed by a parallel machine alone while a setup phase and a removal phase are performed by both a server and a parallel machine simultaneously. Most of previous researches used a single server and considered only a setup phase and a processing phase. If a single server is used for scheduling, the bottleneck in the server increases the total completion time. Even though the number of parallel machines is increased, the total completion time is not reduced significantly. In this paper, we have proposed an efficient algorithm for the parallel machine scheduling using multiple servers and considering setup, processing and removal phases. We also have investigated experimentally how the number of servers and the number of parallel machines affect the total completion time.

Clinical Significance of Decompressive Craniectomy Surface Area and Side

  • Jo, KwangWook;Joo, Won Il;Yoo, Do Sung;Park, Hae-Kwan
    • Journal of Korean Neurosurgical Society
    • /
    • v.64 no.2
    • /
    • pp.261-270
    • /
    • 2021
  • Objective : Decompressive craniectomy (DC) can partially remove the unyielding skull vault and make affordable space for the expansion of swelling brain contents. The objective of this study was to compare clinical outcome according to DC surface area (DC area) and side. Methods : A total of 324 patients underwent different surgical methods (unilateral DC, 212 cases and bilateral DC, 112 cases) were included in this retrospective analysis. Their mean age was 53.4±16.6 years (median, 54 years). Neurological outcome (Glasgow outcome scale), ventricular intracranial pressure (ICP), and midline shift change (preoperative minus postoperative) were compared according to surgical methods and total DC area, DC surface removal rate (DC%) and side. Results : DC surgery was effective for ICP decrease (32.3±16.7 mmHg vs. 19.2±13.4 mmHg, p<0.001) and midline shift change (12.5±7.6 mm vs. 7.8±6.9 mm, p<0.001). The bilateral DC group showed larger total DC area (125.1±27.8 ㎠ for unilateral vs. 198.2±43.0 ㎠ for bilateral, p<0.001). Clinical outcomes were nonsignificant according to surgical side (favorable outcome, p=0.173 and mortality, p=0.470), significantly better when total DC area was over 160 ㎠ and DC% was 46% (p=0.020 and p=0.037, respectively). Conclusion : DC surgery is effective in decrease the elevated ICP, decrease the midline shift and improve the clinical outcome in massive brain swelling patient. Total DC area and removal rate was larger in bilateral DC than unilateral DC but clinical outcome was not influenced by DC side. DC area more than 160 ㎠ and DC surface removal rate more than 46% were more important than DC side.