• 제목/요약/키워드: Top-Down Construction

Search Result 146, Processing Time 0.038 seconds

Development of Connection between CFT Column and Pier Foundation for Top-Down Construction (Top-Down 공사용 원형충전강관기둥과 피어기초의 개발)

  • Jeong, Mee-Ra;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Kang, Seung-Ryong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.29-32
    • /
    • 2009
  • Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.

  • PDF

Non-destructive Inspection of Top-Down Construction Joints of Column in SRC Structure using Ultrasonic Method (초음파법을 이용한 콘크리트 역타시공 이음부 공극의 화상검출특성)

  • Park, Seok-Kyun;Baek, Un-Chan;Lee, Han-Bum;Kim, Myoung-Mo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.20 no.4
    • /
    • pp.290-295
    • /
    • 2000
  • The joint treatment of concrete is one of the technical problems in top down construction method. Joints created with the top down construction result in serious weakness from the aspects of both structural and water-barrier function. Ultrasonic method was used for the inspection of top down construction joints of a various column in SRC structure in this study. The advantages and limitations of this method for non-destructive inspection in top down construction joints are investigated. As a result, it has been verified that the semi-direct measurement method is more effective than the other methods for detecting the voids of construction joints using ultrasonic method.

  • PDF

Specificity of Prefounded Column for Top-Down Construction (Top-Down 공사용 선기초기둥의 특성)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Park, Dae Young;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

A Case Study on the Application and History of Improved Method Top-Down Support by the Building Structure (건축 구조체를 이용한 개량 역타공법의 변천 과정과 적용 사례연구)

  • Lee, Jung-Jae;Jung, Kyoung-Sik;Roh, Bae-Young;Hong, Won-Pyo;Kim, Jong-Ho
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.45-53
    • /
    • 2006
  • Top-Down Construction Method has been considered as the steadiest and the most reasonable method of construction since 1984 when it was applied to LG Da-Dong building and its usage in the field construction has since grown rapidly. With increased cases, engineers not only pursue their studies of R & D continuously but also develop various technical methods based on Top-Down Construction in an era of rapid technological change to adopt them to the field construction. Top-Down Construction meets the needs of these challenging points, such as reduction and eliminates of temporary equipment for supporting permanent structures on the ground, improved method of construction, shortening construction periods, cost reduction, and allows for minimal environmental impact.

  • PDF

Non-Supporting Form System for Top-Down Construction (지하 역타 공법용 상·하 분리형 무지주 지지체 개발)

  • Jeong, Mee-Ra;Rhim, Hong-Chul;Yom, Kyong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.27-30
    • /
    • 2008
  • For the purpose of developing economical and time-efficient formwork for Top-down construction, a Non-Supporting Form System has been proposed. The system is consisted of two parts: a hanging part to support a steel frame and a section of concrete slab, and the other hanging part to lower the steel frame. In this paper, the proposed system is compared to two existing systems of Non Supporting Top-down Method and Bracket Supported R/C Downward Method. It is expected that this system can be used in Top-down construction with further development.

  • PDF

Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method (역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석)

  • Park, Yong-Hyeon;Ju, Young-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

Use of Concrete Filled Tube as a Pre-founded Column for Top Down Construction (Top Down 공사에서의 CFT 선기초기둥 활용방안)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra;Lee, Hai-Chool
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.31-34
    • /
    • 2008
  • Construction of buildings downtown is increasing as much as ever with a strong demand. A Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. In general, the Pre-founded Column, one of the most important aspects of the Top-Down Method, has been made with an H-Shape Steel Column. However, due to its structural and economical benefits, the usage of CFT(Concrete Filled Tube) columns in the place of Pre-founded Columns is increasing. To promote their applications, we analyze the merits of CFT columns by comparing them with I-Shape columns and propose further research.

  • PDF

A Study on Void Examination in Top-Down Column Joint (역타설기둥 타설이음 부분의 공극성상에 관한 연구)

  • 이영도;임형일;김성식;정병훈;정상진;진영헌
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.34-39
    • /
    • 2001
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down, through V-metering for top down column and concrete experiment.

  • PDF

Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project (Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF

A Case Study on the Top-Down Methods Performed in the Excavation Works of Domestic Downtown (국내 도심지 굴착공사에 적용된 Top-Down 공법의 시공사례 연구)

  • Chung, Jeeseung;Park, Sukk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.2
    • /
    • pp.5-19
    • /
    • 2017
  • Underground excavation for building construction in Korea is changing from conventional support method (Strut, Ground anchor) to inside permanent support method by stability, economic, circumstances around excavation and etc. This study was selected the sites of Top-down, New Top-down, S.P.S, S.T.D and B.R.D in general use. This study was compared and analyzed a construction cost and period between aforementioned methods and conventional support method. Also, this study was confirmed the stability of temporary retaining wall by analysis for measurement data under construction. As a result, this study can grasp that most improved permanent support method is excellent in economic and constructability than conventional support method in case of deep excavation and rapid appearance of bedrock.