• 제목/요약/키워드: Top-Down Construction

검색결과 147건 처리시간 0.02초

Top-Down 공사용 원형충전강관기둥과 피어기초의 개발 (Development of Connection between CFT Column and Pier Foundation for Top-Down Construction)

  • 정미라;임홍철;김승원;김동건;강승룡
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.29-32
    • /
    • 2009
  • Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.

  • PDF

초음파법을 이용한 콘크리트 역타시공 이음부 공극의 화상검출특성 (Non-destructive Inspection of Top-Down Construction Joints of Column in SRC Structure using Ultrasonic Method)

  • 박석균;백운찬;이한범;김명모
    • 비파괴검사학회지
    • /
    • 제20권4호
    • /
    • pp.290-295
    • /
    • 2000
  • 최근 역타시공법 등에 의한 콘크리트 구조물의 시공이 증가 추세에 있다. 이 경우, 자주 발생되는 신 구타설 콘크리트 시공이음부의 공극은 향후 구조물의 구조적인 특성과 내구성 등에 큰 영향을 미치게 된다. 그러나 현재 제안되고 있는 비파괴 검사법으로는 효과적으로 이음부 공극을 평가하기에 많은 한계가 있다. 본 연구에서는 시공이음부의 콘크리트 충전상태를 평가하기 위해 철골철근 콘크리트와 무근 콘크리트 시험체내에 공극을 모의제작한 후, 초음파속도 측정을 실시하고, 화상처리기법을 이용하여 비교적 용이하게 해석 가능한 방법에 대해 검토하였다.

  • PDF

Top-Down 공사용 선기초기둥의 특성 (Specificity of Prefounded Column for Top-Down Construction)

  • 강승룡;임홍철;김승원;박대영;김동건;송지윤;정미라
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

건축 구조체를 이용한 개량 역타공법의 변천 과정과 적용 사례연구 (A Case Study on the Application and History of Improved Method Top-Down Support by the Building Structure)

  • 이중재;정경식;노배영;홍원표;김종호
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.45-53
    • /
    • 2006
  • Top-Down Construction Method has been considered as the steadiest and the most reasonable method of construction since 1984 when it was applied to LG Da-Dong building and its usage in the field construction has since grown rapidly. With increased cases, engineers not only pursue their studies of R & D continuously but also develop various technical methods based on Top-Down Construction in an era of rapid technological change to adopt them to the field construction. Top-Down Construction meets the needs of these challenging points, such as reduction and eliminates of temporary equipment for supporting permanent structures on the ground, improved method of construction, shortening construction periods, cost reduction, and allows for minimal environmental impact.

  • PDF

지하 역타 공법용 상·하 분리형 무지주 지지체 개발 (Non-Supporting Form System for Top-Down Construction)

  • 정미라;임홍철;염경수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.27-30
    • /
    • 2008
  • For the purpose of developing economical and time-efficient formwork for Top-down construction, a Non-Supporting Form System has been proposed. The system is consisted of two parts: a hanging part to support a steel frame and a section of concrete slab, and the other hanging part to lower the steel frame. In this paper, the proposed system is compared to two existing systems of Non Supporting Top-down Method and Bracket Supported R/C Downward Method. It is expected that this system can be used in Top-down construction with further development.

  • PDF

역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

Top Down 공사에서의 CFT 선기초기둥 활용방안 (Use of Concrete Filled Tube as a Pre-founded Column for Top Down Construction)

  • 강승룡;임홍철;김승원;김동건;송지윤;정미라;이해출
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.31-34
    • /
    • 2008
  • Construction of buildings downtown is increasing as much as ever with a strong demand. A Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. In general, the Pre-founded Column, one of the most important aspects of the Top-Down Method, has been made with an H-Shape Steel Column. However, due to its structural and economical benefits, the usage of CFT(Concrete Filled Tube) columns in the place of Pre-founded Columns is increasing. To promote their applications, we analyze the merits of CFT columns by comparing them with I-Shape columns and propose further research.

  • PDF

역타설기둥 타설이음 부분의 공극성상에 관한 연구 (A Study on Void Examination in Top-Down Column Joint)

  • 이영도;임형일;김성식;정병훈;정상진;진영헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.34-39
    • /
    • 2001
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down, through V-metering for top down column and concrete experiment.

  • PDF

Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구 (Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project)

  • 심학보;석원균;박순전
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF

국내 도심지 굴착공사에 적용된 Top-Down 공법의 시공사례 연구 (A Case Study on the Top-Down Methods Performed in the Excavation Works of Domestic Downtown)

  • 정지승;박석기
    • 한국지반환경공학회 논문집
    • /
    • 제18권2호
    • /
    • pp.5-19
    • /
    • 2017
  • 국내 건축물 시공을 위한 지하 굴착은 안정성, 경제성 및 굴착 주변 여건 등을 고려하여 재래식 버팀대 공법(Strut, Ground Anchor)에서 점차 Top-Down 공법을 개량한 내부 영구 지지체 공법으로 변화하고 있다. 본 연구에서는 국내에서 범용적으로 사용되고 Top-Down 공법, New Top-Down 공법, S.P.S 공법, S.T.D 공법 및 B.R.D 공법 등 내부 영구 지지체 공법 현장을 선정하여 재래식 버팀대 공법과 공사비 및 공기를 비교 분석하였다. 또한 공사 중 흙막이 벽체의 계측 자료를 분석하여 흙막이 벽체의 안정성을 확인하였다. 그 결과 깊은 굴착 및 기반암층이 지표면으로부터 가까운 경우 영구 지지체 공법이 재래식 버팀대 공법보다 경제성과 시공성이 우수함을 알 수 있었다