• 제목/요약/키워드: Top-Down

Search Result 1,107, Processing Time 0.024 seconds

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

Dental implant cost by top-down approach (하향식(Top-down)방식을 적용한 치과 임플란트 원가산정)

  • Shin, Hosung;Kim, Min-Young
    • The Journal of the Korean dental association
    • /
    • v.52 no.7
    • /
    • pp.416-424
    • /
    • 2014
  • The purpose of this study is to analyze the cost of dental implant by top-down method and, on that basis, to provide salient information for the suitable standard of dental insurance fee. A survey data and accounting documents from 36 samples of dental clinics secured with the organisation authority are used and analysed for extracting the representative sample of dental clinic. A researcher visited the dental clinics in person and conducted additional interviews in the omitted case of accounting documents. A dental implant cost by top-down method was estimated to 1,430,000 won. Labor cost accounted for 43% of the total cost structure, ranking it 1st and, management cost, material cost and interest cost on investment cost in order are investigated. Labor cost counts of the total cost that shows the similar aspect to the existing result. Cost in cost accounting of medical care would be used for the judge that cost pursed value for dental service, not price or fee.

Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method (탑다운 기초 현장타설말뚝의 지지력 평가)

  • Cho, Chun-Whan;Kim, Hong-Mook;Kim, Woong-Kyu;Kwon, Se-Oh;Sung, Byung-Wan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF

Design of Automobile Exhaust System using a Top-Down Approach Design Methodology (상하향식 설계법을 이용한 자동차 배기시스템의 설계)

  • 고병갑;박경진
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.6
    • /
    • pp.13-27
    • /
    • 1997
  • In the modern design technology, a component should be designed to fit into the overall system performance. A design methodology is developed to expedite the mechan- ical design of complex mechanical systems, The relation between the system design and component design is defined by a top-down approach and the results from the system design are utilized in the component design process. As a design example, an automobile exhaust system is selected for the system design and a bellows is chosen for a component design. Design methodology based on the top-down approach consists of five steps; (1) Analysis of service load, (2) Development of a lumped parameter, (3) Completion of the system design, (4) Selection of the component topology, (5) Completion of the component design, A method using a equivalent matrix is developed in order to determine unknown external forces in linear structural analyses. The bellows is also analyzed by the finite element method using a conical frustum shell element. Various experiments are performed to verify the developed theories. The top-down desi- gn approach is demonstrated by a design case using structural and shape optimization technology. Since the method is relatively simple and easy compared to other methods, it can be applied to the general design where system and component designs are involves simultaneously.

  • PDF

DEVELOPMENT AND APPLICATION OF SUBSTRUCTURE NON SUPPORTING FORMWORK FOR TOP-DOWN CONSTRUCTION

  • Mee-Ra Jeong;Hong-Chul Rhim;Doo-Hyun Kang;Kwang-Jun Yoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.788-793
    • /
    • 2009
  • Constructing substructures by using Top-Down or Downward method needs an efficient formwork system because of difficulties in supporting concrete slabs from the bottom while excavation is in process. Existing underground formwork systems can be classified by three types: graded ground supported type (Slab On Grade, Beam On Grade), suspension type (Non Supporting Top Down Method), and bracket supported type (Bracket Supported R/C Downward). Each method has its own advantages and limits. Application of a specific formwork system for a given construction site is determined by various conditions and affect construction time and cost. This paper presents a newly developed underground non-supporting formwork system, which combines the advantages of a suspension type and a bracket supported type while it overcomes limits of two types. The developed system has a moving formwork which is supported by suspension cables hanging from the bracket placed at the top of pre-installed substructure columns. Then, the moving formwork is repeatedly lowered down for the next floor below to support concrete slab during curing. The details of this bracket and cable supported system have been investigated for the improvement of easiness in construction.

  • PDF

A Study of Elapsed Time Change on Concrete for Top-Down Method (역타공법 적용을 위한 콘크리트 경시변화 특성 연구)

  • 정근호;이종균;박선길;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.487-492
    • /
    • 1999
  • The purpose of this study to find the mixture of concrete for Top-Down method. Throughout test of elapsed time change and L-type flow, it was proposed basic performance and level of top-down method concrete. When change as to elapsed time is considered, so series of F10 added 10% S.P satisfied slump and demanded flow (60$\pm$5cm), and L-type slump, L-type flow satisfied liquidity, it can be considered basic mixture of designed actual frame later.

  • PDF

A Study on Void Check as Placing Method with Use of V-meter Method (초음파탐사를 통한 타설방법이 공극에 미치는 영향에 관한 연구)

  • 임형일;최창기;정근호;김우재;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.1107-1112
    • /
    • 2000
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down, through V-metering for top down column and concrete experiment.

A Study on Strength and Packing Characteristics of Top-Down Joint in Field Experiment (현장실험을 통한 역타설 이음부의 강도 및 충전특성에 관한 연구)

  • 강동현;김종구;김병천;박병근;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.1101-1106
    • /
    • 2000
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is to find a solution of removing void and air, way to exhaust air in top down column. through specimen concrete placing experiment.