• Title/Summary/Keyword: Tool management

Search Result 4,240, Processing Time 0.029 seconds

A study on the operation of effective internal audit for business continuity management system (지속가능경영체제를 지원하는 내부감사의 효과적 운영에 관한 연구)

  • Syn, Dong-Sig;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.373-385
    • /
    • 2009
  • In business aspects, the corporate usually confronted with various risks. such as the management problems of the quality, the environment, the safety & health, the ethics, and the social responsibility. Overall monitoring of these aspects is required to the top manager ceaselessly. In the past ways, for these problems, the government has been controlled the corporate to keep them. But nowadays, the needs of self management of these topics is rising up for the business continuity especially to the multi-national corporate. To prove their soundness they issued the management status report periodically. Internal audit will works not only the self confirming tool but also the best supporting tool for the policy managements in such circumstances. So, an effective internal audit will lead the business continuity management to the future.

  • PDF

Development of job performance assessment tool for dental hygienists (치과위생사의 직무수행능력 평가도구 개발)

  • Kim, Ji-Hee;Hwang, Tae-Yoon
    • Journal of Korean society of Dental Hygiene
    • /
    • v.13 no.5
    • /
    • pp.713-726
    • /
    • 2013
  • Objectives : The purpose of this study is to develop a job performance assessment tool for dental hygienists. Methods : The development consisted of three steps. The first step was to construct the contents of the assessment tool and a pretest questionnaire. In the second step, validity and reliability tests were done and modified for the pretest questionnaires and an assessment tool was made. The third step was verification of the assessment tool. A total of 678 data from the dental hygienists were analyzed to verify the validity and reliability. The assessment tool consisted of two areas such as job performance and competency/attitude: the job performance area covered four sub-areas including oral health education, preventive dental care, assistance for dental treatment, and administrative management. Results : The number of questions and reliability test result for each sub-area were as follows. Reliability coefficient for oral health education (10 questions) was 0.899, preventive dental care (8 questions) was 0.861, assistance for dental treatment (18 questions) was 0.915, administrative management (8 questions) was 0.919, competency of dental hygienists (11 questions) was 0.947, and attitude of dental hygienists (15 questions) was 0.955. Cronbach ${\alpha}$ coefficient for reliability of total 70 questions of the assessment tool was 0.980. Conclusions : The validity of the assessment tool was verified by three steps and the reliability proved to be significant. Consequently the assessment tool was found to be useful as an objective and valid job performance assessment tool for the dental hygienists.

Design and Implementation of SMART (Software Management Assistant and Reference Tool) (SMART (Software Management Assist ant and Reference Tool) 시스템의 설계 및 구현)

  • Jin, Ki-Sung;Won, Jong-Ho;Kim, June;Kim, Myung-Joon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.04b
    • /
    • pp.367-369
    • /
    • 2002
  • 소프트웨어 프로젝트의 경쟁력 프로젝트의 생명 주기 전반에 걸친 체계적인 관리를 통하여 유지될 수 있으며, 이러한 체계적인 관리는 경쟁력 있는 프로젝트의 개발 및 유지를 위한 하나의 전략적 기술(strategic technology)이다 본 논문에서는 프로젝트 생명 주기 전반에 걸쳐 프로젝트를 체계적이고 효율적으로 관리하여 고품질의 결과물을 생성하고, 이를 통한 결과물의 기술 및 시장 경쟁력을 높이기 위하여 당 연구부에서 개발하여 사용하고 있는 프로젝트 관리 및 지원도구인 SMART (Software Management Assistant and Reference Tool) 시스템을 소개한다.

  • PDF

A Job Loading Procedure as a Kernel Part of FMS Integrated Operating System and Its Evaluation

  • Katayama, Hiroshi
    • Management Science and Financial Engineering
    • /
    • v.2 no.1
    • /
    • pp.1-18
    • /
    • 1996
  • FMS operating system consists of several subsystems in general. i.e. tool grouping subsystem. tool/job assignment subsystem. job dispatching subsystem, and papers dealing with each subsystem were published by many researchers [1], [4], [6], [8], [9], [10], [11], [12], [13], [14], [15], [16]. This paper mainly discusses about tool/job assignment subsystem as a job loading procedure. that occupies the kernel position of overall FMS operating system. Its performance is evaluated through simulation experiments of an integrated operating system under a typical FMS hardware configuration implemented in many machining factories, which is composed of the proposed procedure as well as a job dispatching procedure including several heuristic dispatching rules in terms of rule-base.

  • PDF

A Development of an UML-Based Business Process Modeling Tool Generating Standard-Compliant Workflow Definition Data (표준 워크플로우 정의 데이터를 산출하는 UML 기반 프로세스 모델링 도구 개발)

  • Han Gwan Il;Hwang Tae Il
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.1085-1092
    • /
    • 2003
  • Proposed in this paper is a standard-compliant business process modeling tool which is based on the UML(Unified Modeling Language) activity diagram and produces an XPDL(XML Process Definition Language) file as an output. The XPDL is a standard process definition exchange format by WfMC(Workflow Management Coalition). To develop an UML/XPDL-based modeling tool, the mapping of modeling elements between activity diagram and XPDL format is conducted after the detailed analysis of each modeling specification. As a result of this mapping, it is revealed that modeling elements of each activity diagram and XPDL must be expanded. So new modeling elements are identified and added to each specification. Based on this mapping, the prototype system is developed, and the usefulness of the developed system is shown through the case study.

  • PDF

Project Management Methodology using Managing Data Dictionary (데이터 사전 관리를 통한 프로젝트 관리 기법)

  • Lee, Byoung-Yup;Park, Yong-Hoon;Yoo, Jae-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.3
    • /
    • pp.72-80
    • /
    • 2009
  • With the development of IT technologies, IT environment is making great change over life whole and is displacing business and business achievement systems of industry at the fast speed. Software development using project management tool is more important because of constructing the consistent and reliable system. So, design and implementation of the project management tool which support data standardization of project is proposed in this paper.

Development and Validation of the Hospital's CSR Measurement Tool (의료기관 사회적 책임활동 측정 도구개발 및 타당화)

  • Cho, Kyoung Won;Sagong, Mi;Cho, Minje
    • The Korean Journal of Health Service Management
    • /
    • v.12 no.2
    • /
    • pp.149-162
    • /
    • 2018
  • Objectives : This study aimed to develop tools to measure the social responsibility activities of hospitals using ISO 26000 and to verify the validity and reliability of the developed tools. We verified the content and structural validity, as well as the internal consistency of the proposed measurement tool for hospitals' social responsibility. Methods : We conducted an online survey on hospitals/employees from Feb 26 to Mar 12, 2018, and analyzed selected 197 respondents from the survey by removing incomplete responses. Results : The developed hospitals' CSR (HSR) measurement tool consists of 36 items with 5 factors: "consumer issues", "labor practices", "community involvement & development", "fair operating practice", and "environment". Analysis revealed high reliability with Cronbach' alpha of 0.981. Conclusions : It was verified that the developed HSR tool fully reflected hospital characteristics. This tool can be used to diagnose hospitals' social responsibility and to support strategic decision on social responsibility.

Research on Development of Housing Welfare Program Satisfaction Evaluation Tool -Focusing on housing welfare programs for residents of long-term public rental housing in Seoul-

  • Yoon Hye JUNG;Jung Seok OH
    • The Journal of Economics, Marketing and Management
    • /
    • v.12 no.1
    • /
    • pp.53-64
    • /
    • 2024
  • Purpose: The purpose of this study is to develop a satisfaction evaluation survey tool that reflects the characteristics of the program for housing welfare supported in long-term public rental housing in Seoul. Research design, data and methodology: The main research methods of the study were review of previous studies, literature review, and expert consultation. Results: First, the characteristics of each housing welfare program being promoted by Seoul City were summarized, and the characteristics were reflected in the evaluation survey tool. Second, the SERVOUAL model, a service quality model, was used to measure satisfaction with the housing welfare program and modified to suit the characteristics of the program. Third, an evaluation survey tool was constructed by dividing the evaluation tool into common questions and individual questions, and for the operation and sustainability of the housing welfare program, rather than just evaluating satisfaction, program loyalty was used as a survey item. Fourth, through expert advice, more than 10 evaluation questions for each housing welfare program were revised. Conclusions: The results of future research are expected to be used to prepare practical operation plans through annual monitoring of housing welfare programs and comparative analysis between programs.

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF