• Title/Summary/Keyword: Tool management

Search Result 4,240, Processing Time 0.027 seconds

Machine monitoring for implementing a virtual machine (가상기계 구현을 위한 공작기계 모니터링)

  • 배완준;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.311-315
    • /
    • 2000
  • In thls paper, a remote machine monitoring system for a vimal machine is proposed. The monltonng system is one of the core functmns of a vimd machne that provides a modeling and simulation environment for machining processes and management of the machine life cycle. The proposed system contains the modules for investigating tool wear using neural network and web-based real time process monitoring. An example implementation for tool wear and machining status monitoring is illustrated

  • PDF

선삭공정용 데이터베이스 운용기술의 개발

  • 이형국;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1991.04a
    • /
    • pp.334-340
    • /
    • 1991
  • The information with regard to the working rance of lathe, cutting tool, cutting condition is managed as detabase system for turning operation. Date with regard to the working range of lathe, cutting tool, cutting condition are stroed by the DBMS(Data Base Management System) and can be added, modified, deleted and retrieved. Data stored in database system are searched to select the most proper cutting tool and cutting condition with the input data fed from the design stage. The system developed in this work is operated by the pull down menu on the IBM PC/AT personal computer, or compatible series.

A Study on Modular System Efficiency using 5D BIM Tool (5D BIM Tool을 활용한 모듈러시스템의 효율성 연구)

  • Kim, Min-Woong;Hwang, In-Ho;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.208-209
    • /
    • 2013
  • Recently, there is a growing interest in BIM and modular method because of changing in users attitudes about quality of building and construction environment. however, In domestic, study on Modular method still have addressed primarily basic contents. This study check efficiency about this process through comparative analysis of Modular method and RC method used 5D BIM tool for real project and suggest a fitting schedule management method for modular method.

  • PDF

Development of Web based Watershed and Sewer Management System using Computational Model and GIS (전산모형과 지리정보시스템을 결합한 Web 기반의 유역 및 하수도 관리시스템의 개발)

  • Kim, Joon Hyun;Park, Hyung Choon;Han, Yung Han
    • Journal of Industrial Technology
    • /
    • v.20 no.A
    • /
    • pp.63-71
    • /
    • 2000
  • A web based watershed and sewer management system was developed for the analysis of stormwater runoff and sewer flow, and for optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue and Visual Basic in order to construct user-friendly management system. The developed system was applied to Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of developed system, and the modeling of runoff and sewer flow was implemented using RUNOFF and TRANSPORT blocks in SWMM. This system was connected to the management system of surface and subsurface environment management system in order to develop an integrated environmental management system. Futhermore, this system will be a critical part of overall control system of sewer works including sewer line and wastewater treatment plant. As this system can provide comprehensive prediction of flow and pollution profiles and analytical tool equipped with Web-GIS, it could serve widely as a tool not only for optimal management, but also for decision support system to examine the efficiency of planning and implementation of sewer projects.

  • PDF

Information Systems and Knowledge Management in Construction Management - Focusing on Soft Systems Methodology (SSM) (건설경영에서의 정보시스템 및 지식경영 - 연성정보시스템 방법론을 중심으로 -)

  • Kim Ju-Hyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.91-96
    • /
    • 2002
  • Research and case study on implementing Knowledge Management (KM) in various fields have been published. However, KM could be misunderstood as developed Information Technology (IT) rather than a managerial tool to support knowledge creation in an organization unless the theoretical background on the evolution of KM is rigorously considered. This paper aims to review philosophy of science and managerial trends that can explain the reasons for introducing KM into the industry. Based on this theoretical background, Soft Systems Method (SSM), one of method to facilitate knowledge flows, are explained. SSM has been developed to cope with the characteristics of knowledge distinguished from data and information. Further research topics relevant to SSM in construction management as a practical application and educational tool are presented.

  • PDF

Requirements for Workflow Management Systems Supporting CITIS (CITIS 지원 워크플로우 관리 시스템 개발 요구사항)

  • Bae, Joon-Soo;Kim, Dong-Soo;Jeong, Seok-Chan;Bae, Hye-Rim;Seo, Yeong-Ho;Hur, Won-Chang;Kim, Yeong-Ho;Kang, Suk-Ho
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.63-73
    • /
    • 1997
  • This paper presents requirements for workflow management systems supporting CITIS. We propose an architecture of global workflow management system which aims at supporting external workflow among different organizations rather than internal one. The architecture consists of five key elements, that is process definition language, process graphic design tool, control engine, status monitoring tool, and interface models. For each of these elements, implementation requirements are presented and its major functions are described. A key concept to the CITIS standard is the integration of disparate systems in distributed environment. This leads us to place a special emphasis on the interface models that can enhance the interoperability between externally participating workflow systems. Two interface models for the global workflow management system are explained. CORBA, the most widely accepted standard for distributed object management, can be adopted to facilitate the integration. World Wide Web can be used for the underlying platform on which information is exchanged and the status of processes instances is monitored. The workflow management system can provide a ready and easy access to and management of the data for CALS environments.

  • PDF

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • Cha Hee Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

A Study on the Power Process and Sustainable Competitive Advantage (파워 프로세스와 지속가능 경쟁우위에 관한 연구)

  • Lee, Kyung-Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.3
    • /
    • pp.76-97
    • /
    • 2009
  • The strategic management process includes the establishment of competitive strategy, its implementation and the measurement of its performance. The sucess of strategic management largely depends on the integration of strategic management process into a managerial tool. This study is on the integration of strategic management process into a managerial tool based on the power process, so that it contributes to strategic success or sustainable competitive advantage of a £inn In order to do this, I discussed the principles of the power process, its characteristics, and then suggest their applications to the integration of the strategic management process. According to the results, the power process offers a theoretical and managerial tool which integrates the establishment of competitive strategy with managerial concepts, so that it increases the likelihood of strategic success. Furthermore I discussed the position of the power process approach to competitive advantage in a manner that displays similarities and differences with existing approaches such as industry organizational, resource-based and game theory approach.

A Study of Relationships Among Conflict, Job Satisfaction, and Organizational Commitment on General Hospitals (종합병원 간호사의 갈등과 직무만족${\cdot}$조직몰입과의 관계)

  • Kim, Jong-Kyung
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.13 no.4
    • /
    • pp.421-430
    • /
    • 2007
  • Purpose: The objective of this research is to explore the degree of conflict of nurses, and the relationships among conflict, job satisfaction, and organizational commitment for providing effective management of nurses. Methods: The research was conducted from July 1 to 31, 2006, with a survey of 280 nurses at seven general hospitals in Seoul. The survey tools were used Rizzo et al(1970)' tool for role conflict and role ambiguity Park(1988)'s tool for vertical conflict, and horizontal conflict, Park-Yoon's tool for job satisfaction(1992) and Mowday et al(1979) for organizational commitment. The acquired data were analyzed with SPSS using descriptive methods, t-test, ANOVA, LSD, Pearson correlation coefficient. Results: Overall conflict of nurses showed 3.00 .Job satisfaction of nurses revealed 3.12, and organizational commitment showed 3.34. The relationships between conflict and job satisfaction showed -65.6%. The relationships between conflict and organizational commitment revealed -56.2%. Conclusion: Conflict management is important factor of management for increasing job satisfaction and organizational commitment. It is needed that orientation and education program of detailed job description for nurses.

  • PDF