ANALYSIS OF THE FLOOR PLAN DATASET WITH YOLO V5

  • MYUNGHYUN JUNG;MINJUNG GIM;SEUNGHWAN YANG
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • v.27 no.4
    • /
    • pp.311-323
    • /
    • 2023
  • This paper introduces the industrial problem, the solution, and the results of the research conducted with Define Inc. The client company wanted to improve the performance of an object detection model on the floor plan dataset. To solve the problem, we analyzed the operational principles, advantages, and disadvantages of the existing object detection model, identified the characteristics of the floor plan dataset, and proposed to use of YOLO v5 as an appropriate object detection model for training the dataset. We compared the performance of the existing model and the proposed model using mAP@60, and verified the object detection results with real test data, and found that the performance increase of mAP@60 was 0.08 higher with a 25% shorter inference time. We also found that the training time of the proposed YOLO v5 was 71% shorter than the existing model because it has a simpler structure. In this paper, we have shown that the object detection model for the floor plan dataset can achieve better performance while reducing the training time. We expect that it will be useful for solving other industrial problems related to object detection in the future. We also believe that this result can be extended to study object recognition in 3D floor plan dataset.

The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

A study on the Highspeed Railway Route Selection -Focusing on 4 design tools- (수도권 고속철도 노선선정 연구 -설계4공구를 중심으로-)

  • Kim, Jong-Seok;Kim, Woo-Je
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.200-207
    • /
    • 2011
  • The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.

  • PDF

The Application of 3D Bolus with Neck in the Treatment of Hypopharynx Cancer in VMAT (Hypopharynx Cancer의 VMAT 치료 시 Neck 3D Bolus 적용에 대한 유용성 평가)

  • An, Ye Chan;Kim, Jin Man;Kim, Chan Yang;Kim, Jong Sik;Park, Yong Chul
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.32
    • /
    • pp.41-52
    • /
    • 2020
  • Purpose: To find out the dosimetric usefulness, setup reproducibility and efficiency of applying 3D Bolus by comparing two treatment plans in which Commercial Bolus and 3D Bolus produced by 3D Printing Technology were applied to the neck during VMAT treatment of Hypopahrynx Cancer to evaluate the clinical applicability. Materials and Methods: Based on the CT image of the RANDO phantom to which CB was applied, 3D Bolus were fabricated in the same form. 3D Bolus was printed with a polyurethane acrylate resin with a density of 1.2g/㎤ through the SLA technique using OMG SLA 660 Printer and MaterializeMagics software. Based on two CT images using CB and 3D Bolus, a treatment plan was established assuming VMAT treatment of Hypopharynx Cancer. CBCT images were obtained for each of the two established treatment plans 18 times, and the treatment efficiency was evaluated by measuring the setup time each time. Based on the obtained CBCT image, the adaptive plan was performed through Pinnacle, a computerized treatment planning system, to evaluate target, normal organ dose evaluation, and changes in bolus volume. Results: The setup time for each treatment plan was reduced by an average of 28 sec in the 3D Bolus treatment plan compared to the CB treatment plan. The Bolus Volume change during the pretreatment period was 86.1±2.70㎤ in 83.9㎤ of CB Initial Plan and 99.8±0.46㎤ in 92.2㎤ of 3D Bolus Initial Plan. The change in CTV Min Value was 167.4±19.38cGy in CB Initial Plan 191.6cGy and 149.5±18.27cGy in 3D Bolus Initial Plan 167.3cGy. The change in CTV Mean Value was 228.3±0.38cGy in CB Initial Plan 227.1cGy and 227.7±0.30cGy in 3D Bolus Initial Plan 225.9cGy. The change in PTV Min Value was 74.9±19.47cGy in CB Initial Plan 128.5cGy and 83.2±12.92cGy in 3D Bolus Initial Plan 139.9cGy. The change in PTV Mean Value was 226.2±0.83cGy in CB Initial Plan 225.4cGy and 225.8±0.33cGy in 3D Bolus Initial Plan 224.1cGy. The maximum value for the normal organ spinal cord was the same as 135.6cGy on average each time. Conclusion: From the experimental results of this paper, it was found that the application of 3D Bolus to the irregular body surface is more dosimetrically useful than the application of Commercial Bolus, and the setup reproducibility and efficiency are excellent. If further case studies along with research on the diversity of 3D printing materials are conducted in the future, the application of 3D Bolus in the field of radiation therapy is expected to proceed more actively.

Development of 4-D Trajectory Modeling using BADA (BADA를 활용한 4-D 경로 모델링법 개발)

  • Oh, Eun-Mi;Eun, Yeon-Ju;Jeon, Dae-Keun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.2
    • /
    • pp.1-6
    • /
    • 2012
  • Four dimensional(4-D) trajectory modeling is conducted based on flight plan. The flight plan is divided into several segments which represent certain operating flight modes. Thrust, drag and fuel consumption rate of an aircraft are calculated using BADA provided by Eurocontrol. The trajectory is modeled with the rate of climb/descent calculated with Total-Energy Equation. The simulation results with a typical aircraft and its flight plan indicate that the trajectory modeled corresponds well with the suggested flight plan. The performance profiles including total endurance time and time history for speed, thrust, drag and fuel consumption were also appropriately generated.

Knowledge-based Decision Support System for Process Planning in the Electric Motor Manufacturing (전동기 제조업의 지식기반 공정계획 지원시스템에 관한 연구)

  • Song, Jung-Su;Kim, Jae-Gyun;Lee, Jae-Man
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.159-176
    • /
    • 1998
  • In the motor manufacturing system with the properties of short delivery and order based production, the process plan is performed individually for each order by the expert of process plan after the completion of the detail design process to satisfy the specification to be required by customer. Also it is hard to establish the standard process plan in reality because part routings and operation times are varied for each order. Hence, the production planner has the problem that is hard to establish the production schedule releasing the job to the factory because there occurs the big difference between the real time to be completed the process plan and the time to be required by the production planner. In this paper, we study the decision supporting system for the process plan based on knowledge base concept. First, we represent the knowledge of process planner as a database model through the modified POI-Feature graph. Then we design and implement the decision supporting system imbedded in the heuristic algorithm in the client/server environment using the ORACLE relational database management system.

  • PDF

Design of a Life Test Sampling Plan Based on the Cost Model

  • Kwon, Young-Il
    • International Journal of Reliability and Applications
    • /
    • v.6 no.1
    • /
    • pp.31-39
    • /
    • 2005
  • An economic life test sampling plan for products with exponential lifetime distribution is developed. To reduce test time, a test plan with curtailed Type II censoring is considered. A cost model is constructed which involves three cost components; test cost, accept cost, and reject cost. Determination of optimal plan minimizing the expected average cost per lot is discussed with a constraint related to consumer's risk. Some numerical examples are provided.

  • PDF

Performance Evaluation of QoS-based Web Services Selection Models (QoS 기반 웹 서비스 선택 모형의 성능 평가)

  • Seo, Sang-Koo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.4
    • /
    • pp.43-52
    • /
    • 2007
  • As the number of public Web Services increases, there will be many services with the same functionality. These services. however, will vary in their QoS properties, such as price, response time and availability, and it is very important to choose a best service while satisfying given QoS constraints. This paper brings parallel branching and response time constraint of business processes into focus and investigates several service selection plans based on multidimensional multiple choice Knapsack model. Specifically. proposed in the paper are a plan with response time constraints for each execution flow, a plan with a single constraint over the whole service types and a plan with a constraint on a particular execution path of a composite Web Services. Experiments are conducted to observe the performance of each plan with varying the number of services, the number of branches and the values of response time constraint. Experimental results show that reducing the number of candidate services using Pareto Dominance is very effective and the plan with a constraint over the whole service types is efficient in time and solution quality for small to medium size problems.

  • PDF

Earth Building Characteristic Analysis to Utilize in Architecture Plan (건축 계획적 활용을 위한 흙건축 특성분석)

  • Lee, jang-hyuk;Hwang, hey-zoo;Kim, Jeong-Gyu
    • KIEAE Journal
    • /
    • v.7 no.4
    • /
    • pp.3-8
    • /
    • 2007
  • This study is aimed to apply basic data to planning earth building through analyzing characteristics of earth building. For doing it, we investigated a research paper in advanced countries(New zealand, Australia, etc.) that has been used for earth building standards for a long time, and then we corrected inadequate standards that would apply our earth building environment. As a result, we can devide earth characteristics into three parts that are materials, plan, and maintenance and repair. First, as material selection is very important factor, a general plan is possible to change in accordance with what material is selected. These methods that made mud brick, pressed earth block, rammed earth, cob have been well used during the current 30 years in earth building. Second, the plan is composed of site select and architecture plan. In architecture plan, we should consider from foundation to eaves protection, and in site selection, consider sides of the environment and the social. Third, we should always check a periodical inspection through watchful observation because earth buildings need more time and efforts in maintaining and repairing than others.

A Study on the Improvement of Planning procedure and estimation of Capacity Addition in Long Term Electricity Plan (전력수급기본계획 수립에서 의향서 평가절차의 개천 방안)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.745-747
    • /
    • 2005
  • After restructuring electricity industry, national long term electricity plans moved to "Basic plan of electricity supply and demand" from "Long term power development plan". The main point is a change of path from plan of power development at national level to plan of electricity supply and demand at company level. A proposal by generation company is surveyed and reflected to the basic plan of electricity supply and demand. The second plan shows over 40% reserves in result of the proposals. It is the time to evaluating the proposal which covers market function in the basic plan of electricity supply and demand at the stage of market change. This research presents the need of evaluation of proposals and the methods of evaluation. Also it presents the alternative planning procedure to reflecting the evaluation methods.