• Title/Summary/Keyword: Time management tool

Search Result 799, Processing Time 0.036 seconds

A Preventive Maintenance Scheduling Model of the Cluster Tool (클러스터 툴의 예방유지보수 스케줄링 모형)

  • Lee, Hyun;Park, You-Jin;Hur, Sun
    • IE interfaces
    • /
    • v.25 no.1
    • /
    • pp.127-133
    • /
    • 2012
  • This paper considers the preventive maintenance scheduling problem of the cluster tool which is one of the most important manufacturing equipments in the next-generation semiconductor production environment. We define a random process that expresses the successive amount of chemicals accumulating inside the tool. Based on the renewal theory, we find the expected value and probability distribution of the time that the amount of accumulated chemicals exceeds a predetermined level. For a given probability that the accumulated chemicals exceeds the predetermined level we present a method to obtain the number of chamber operations to perform the preventive maintenance of that chamber. In addition, a method to get the preventive maintenance schedule for the whole cluster tool is presented. A numerical example is provided to illustrate our method.

Saving Tool Cost in Flexible Manufacturing Systems: Optimal Processing Times and Routing Mix (유연생산시스템에서 절삭공구 비용절감을 위한 가공시간과 경로배합 최적화)

  • Kim, Jeong-Seop
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.475-478
    • /
    • 2004
  • Tool costs can comprise a significant part of the total operating costs of Flexible Manufacturing Systems. We address the problem of determining the optimal processing times of individual operations and routing mix in FMSs with multiple routes for each part type in order to minimize tool cost, subject to meeting a throughput constraint for each part type. The problem is formulated as a nonlinear program superimposed on a closed queueing network of the FMSs under consideration. Numerical examples reveal the potential of our approach for significant saving in tool costs.

  • PDF

Tool placement problem for a given part sequence on a flexible machine

  • Shinn Seong-Whan;Song Chang-Yong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.05a
    • /
    • pp.195-198
    • /
    • 2001
  • This paper addresses the problem of placing tools in a tool magazine with random-select capability on a flexible machine. The tool placement problem could be a significant portion of the total processing time. It is assumed that the total number of tools required to process a set of parts exceeds the available magazine capacity, and so tool switches may occur between two adjacent parts in a given part sequence. Two heuristics are presented so as to minimize the total travel distance of the tool magazine before the completion of all parts.

  • PDF

A Study on the Integrated Conceptual Model of Software Development Project Management System (소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구)

  • Mun, Yong-Eun;Lee, Jae-Beom
    • Asia pacific journal of information systems
    • /
    • v.6 no.1
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

Development of Edutainment platform for Developmental Disability Children (발달장애 아동을 위한 에듀테인먼트 플랫폼 개발)

  • Kim, Jung-Eun;Choi, Ei-Kyu;Shin, Byeong-Seok
    • Journal of Korea Game Society
    • /
    • v.8 no.4
    • /
    • pp.65-73
    • /
    • 2008
  • In this paper, we designed and implemented edutainment platform that can be effectively applied to developmental disabilities for their education and treatment of sensibility and intelligence training. We developed embedded hardware and contents authoring tool to make multimedia contents operated on the hardware, a management tool to provide result of training, and a real-time monitoring tool for observing the state of study. The hardware is designed by considering the characteristics of developmental disabilities and provides visual, auditory and tactile sense to assist sensibility training for their attention. User-friendly and easy-to-use authoring tool enable teachers and non-specialist to make educational contents. Also the real-time monitoring tool make us to observe user's status even in the outside of classroom. The management tool stores result of training and make us to review the result for further steps. Using this edutainment platform, efficient repetitive training is possible without restriction of time and location. Also when it applied to practical education, we can recognize that our system is effective on improving the ability of attention and studying.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF

Determination of the Starting Value and the Resetting Time for a Production Process with Linear Shift in the Process Mean (공정평균이 변하는 생산공정의 공정평균의 초기값 및 재설정 시간 결정)

  • 안동근;장중순
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.4
    • /
    • pp.51-64
    • /
    • 1998
  • Mean shifts may be found in tool wear in machining, drawing, stamping and moulding operations, which make the process quality level deteriorate over time. In such situations, it is necessary to reset or readjust the manufacturing process at regular time basis or by inspection to prevent defective items produced. Although the deterioration rate may be assumed to be linear in a production cycle, there are many cases where the rate varies after resetting due to the variation of tool characteristics or by using the resharpened tools. In such cases, the deterioration rate should not be assumed to be a deterministic constant but a random variable. This paper is to find an optimal resetting period and quality level for such production processes.

  • PDF

Design of component layout and tool path for machining multiple components

  • 이창근;임석철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.610-614
    • /
    • 1996
  • In machining muliple components fixed on the same pallet of a NC machine, it is very important to minimize the total time required to finish the machining by carefully determining the component layout on the pallet, and the tool path of NC machine, and the sequence of tools to be used. In this paper, a linear integer programming model is presented to obtain an efficient layout; and a two-phased heuristic algorithm is proposed to minimize the total time for machining multiple components. Numerical examples are given for the case of identical components and nonidentical components, respectively. The result of either case shows significant reduction of 7.2~15.0% in the total time required to finish the machining.

  • PDF

How to develop corporate real estate? A decision support tool for CREM

  • Dorr, Anne;Pfnur, Andreas
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.19-33
    • /
    • 2017
  • Various forms of procurement are open to companies when constructing new owner-occupied properties. The selection of a form of procurement is an important decision-making problem for companies and their Corporate Real Estate Management (CREM) departments. With this in mind, a decision support tool has been developed to optimise the outcome and success of company's proposed real estate development projects and is presented in this paper. This model can also be used for current real estate portfolios to optimise returns in the long term. In pursuit of this objective and in order to provide an academic basis for this study, decision-relevant goals and parameters were initially identified from the referenced literature used in our research. These were subsequently evaluated in a case study of a corporate development project and identified as specific decision criteria from the perspective of the CREM. The investigation identified 15 criteria that are relevant to the corporate decision-making process in procuring and/or developing property. A model for supporting and resolving decision-making problems of this type was derived from decision theory. In this paper, a decision-making tool is presented that takes into account all the decision criteria from the CREM point of view for the first time. This model should therefore serve as an aid in implementing the decision-making process for the development of real estate projects in a more structured and transparent manner.

A Study on Web Services for Sequence Similarity search in the Workflow Environment (워크플로우 환경에서의 대규모 서열 유사성 검색 웹 서비스에 관한 연구)

  • Jun, Jin-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.6
    • /
    • pp.41-49
    • /
    • 2008
  • In recent years, a life phenomenon using a workflow management tool in bioinformatics has been actively researched. Workflow management tool is the base which enables researchers to collaborate through the re-use and sharing of service, and a variety of workflow management tools including MyGrid project's Taverna, Kepler and BioWMS have been developed and used as the open source. This workflow management tool can model and automate different services in spatially-distant area in one working space based on the web service technology. Many tools and databases used in the bioinformatics are provided in the web services form and are used in the workflow management tool. In such the situation, the web services development and stable service offering for a sequence similarity search which is basically used in the bioinformatics can be essential in the bioinformatics field. In this paper, the similarity retrieval speed of biology sequence data was improved based on a Linux cluster, and the sequence similarity retrieval could be done for a short time by linking with the workflow management tool through developing it in the web services.

  • PDF