• Title/Summary/Keyword: Time Shortening

Search Result 665, Processing Time 0.024 seconds

Prediction of Differential Column Shortening for Reinforced Concrete Tall Buildings (시공단계를 고려한 철근콘크리트 고층건물 기둥의 부등축소량 해석)

  • Lee, Tae-Gyu;Kim, Jin-Keun;Song, Jin-Gyu
    • Magazine of the Korea Concrete Institute
    • /
    • v.11 no.1
    • /
    • pp.99-107
    • /
    • 1999
  • In this paper, the prediction method of the differential column shortening for cracked reinforced concrete tall buildings due to the construction sequence is presented. The cracked sectional properties from the strain and curvature of the sectional centroid is directly used. And the stiffness matrix of concrete elements considering the axial strain-curvature interaction effect is adopted. The creep and shrinkage properties used in the predictions were calculated in accordance with ACI 209, CEB-FIP 1990, and B3 model code. In order to demonstrate the validity of this algorithm, the prediction by the proposed method are compared with both the results of the in-situ test and the results by other simplified method. The proposed method is in good agreement with experimental results, and better than the simplified method.

A study of the preconsonantal vowel shortening in Chinese

  • Yun, Ilsung
    • Phonetics and Speech Sciences
    • /
    • v.10 no.4
    • /
    • pp.39-44
    • /
    • 2018
  • This study aimed to examine whether preconsonantal vowel shortening, which occurs in many languages, exists in Chinese. To this end, we compared 15 pairs of Chinese bi-syllabic words with intervocalic unaspirated/aspirated stops. The results revealed that (1) the effect of the feature aspiration of the following stop on the preceding vowel (V1) was neither significant nor consistent though V1 tends to be a little longer before an unaspirated stop; (2) the following unaspirated stop closure (C) was similar to or longer than its aspirated cognate; (3) the durational sum of V1 and C was longer when the stop is unaspirated, and V1 and C had no compensatory relationship; (4) Voice Onset Time (VOT) was significantly longer when the stop is aspirated than unaspirated; (5) the vowel (V2) following VOT was significantly longer when the stop is unaspirated, so the differentials in VOT were partially compensated; (6) despite the partial compensation, the sum of VOT and V2 was longer when the stop is aspirated; (7) words with an intervocalic aspirated stop were longer than those with its unaspirated cognate. It is concluded that while VOT is the most important factor for deciding the timing structure of Chinese words with intervocalic stops, closure duration is crucial for Korean and many other languages.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

A Study on the Effect of Waiting Time factor of Hospitals on Customer Satisfaction and Service Values (의료서비스의 대기시간 요인이 고객만족과 서비스 가치에 미치는 영향)

  • Kim, Il-Kwon;Kwon, Chang-Ik;Yang, Jong-Hyun;Chang, Dong-Min
    • Korea Journal of Hospital Management
    • /
    • v.15 no.3
    • /
    • pp.47-68
    • /
    • 2010
  • One of the important complaint factors by the patients using medical institutions is various kinds of waiting time. This research is about the causal relationships among waiting time(application of waiting time, perceived of waiting time, fairness of waiting, explanation of the delay, acceptance possibility), service values, and customer satisfaction. The subjects for this study were 256 out-patients currently using seven general hospitals in the Busan area. The findings of the empirical analysis are as follows: First, the good application of waiting time or fair waiting time procedure didn't actually affect perceived waiting time. Second, though the application of waiting time didn't affect acceptance possibility, the fair procedure of waiting time had an affirmative effect on acceptance possibility. Third, even when there was enough explanation about the need to wait, it could shorten perceived waiting time but failed to get sufficient sympathy or agreement from the patients. Fourth, the possibility of acceptance following the sufficient sympathy of patients had an effect on shortening perceived waiting time. Fifth, perceived waiting time lowered customer satisfaction, but had no negative effect on service values. Finally, the ranges of acceptance possibility by the patients were found to increase customer satisfaction and maximize service values. In conclusion, every medical institution needs to focus on, first of all, shortening waiting time for more customer satisfaction and improved service values.

  • PDF

A Study on Bleeding after Shortening the Bed Rest Time of Pediatric Hemato-oncologic Patients after Bone Marrow Examination (소아 혈액종양 환자의 골수검사 후 침상안정 시간 단축에 따른 출혈에 관한 연구)

  • Park, Mi Jeong;Lee, Hye Youn;Kim, Nam Yi;Lee, Ok Hee;Hwang, Yu Min
    • Journal of Korean Clinical Nursing Research
    • /
    • v.27 no.2
    • /
    • pp.179-186
    • /
    • 2021
  • Purpose: The purpose of our study was to identify the bleeding risk factors and to validate the safety of shortening the bed rest time after bone marrow examination in pediatric hemato-oncologic patients. Methods: From July 2019 to September 2020, 145 patients were enrolled from a single center. Medical records were reviewed retrospectively. Descriptive statistics were presented, and the data were analyzed using 𝑥2-test, Fisher's exact test, and a logistic regression. Results: After two hours of bed rest, most of the patients (91.7%) did not have bleeding complications, and only 8.3% of the patients had a minor bleeding. The rate of major bleeding complications, including hematoma, retroperitoneal hemorrhage rate was zero. The bleeding complications was frequently found on bilateral procedures than unilateral procedures and the difference were statistically significant (p<.05). Conclusion: Two hours of bed rest time after bone marrow examination could be safe and adequate in pediatric hemato-oncologic patients.

The Utility of a Three-Dimensional Approach with T-Shaped Osteotomy in Osseous Genioplasty

  • Jegal, Jung Jae;Kang, Seok Joo;Kim, Jin Woo;Sun, Hook
    • Archives of Plastic Surgery
    • /
    • v.40 no.4
    • /
    • pp.433-439
    • /
    • 2013
  • Background Facial beauty depends on the form, proportion, and position of various units of the face. In terms of the frontal view and facial profile, the chin is the most prominent aesthetic element of the lower third of the face. Many methods have been implemented to obtain good proportions of the lower face. In this study, we applied the T-shaped genioplasty method to correcting chin deformities. Methods All of the procedures in 9 cases were performed under general anesthesia. For genioplasty, a horizontal cutting line and 1 or 2 vertical cutting lines were drawn 5 mm below the mental foramen. Osteotomed bone segments of the chin were used for horizontal widening using bone grafts or for horizontal shortening. Likewise, they were used as bone grafts for vertical lengthening or vertical shortening. The bone segments were approximated in the midline and held in place using miniplates. Results The postoperative appearance of the 9 cases showed that the lower third of the face had been naturally changed. At the same time, vertical lengthening or shortening, and horizontal widening or shortening could be implemented during the operation. Satisfactory results were obtained based on reviews of the patients' preoperative and postoperative photographs. The patients were also satisfied with the outcomes. Conclusions Using T-shaped genioplasty, we efficiently adjusted the shape and position of the chin to obtain good proportions of the lower face and change its contour to obtain an aesthetically appealing oval face in accordance with East Asians' aesthetic preferences.

Relationship of Maximal Take-off Speed to Power and Shortening llelocitv of Hindlimb Muscle in Anuran Amphibians (무미양서류의 도약속도와 다리근육의 동력 및 수축속도와의 관계)

  • 최인호
    • The Korean Journal of Zoology
    • /
    • v.39 no.2
    • /
    • pp.132-138
    • /
    • 1996
  • To learn how maximal locomotory speed of animals is defined in terms of hindlimb structure and muscle contractile function, take-off speed, hindlimb length, thigh muscle mass, shortening velocity and power of the sastrocnemius muscle were measured with one fast species, Rono nigromaculota and one relatively slowresponding species, Bombina orientalis. Take-off speed (m.sec-1) was greater in R. nigromoculata $(2.4\pm0.2SD, $ n: 14) than in the Bombino $(1.6\pm0.1SD, $ n=8). Stvle of the take-off response was a long-iump type in the Rano and a short-ranged hopping in the Bombing. Faster take-off capacity of the ranid frogs was supported by the longer hindlimb length (relative to body length) and the more massive thigh muscles (relative to body mass), compared to the Bombina. Further, the ranids exhibited faster maximal shortening velocity and Breater maximal power generateion than the Bombina [Vmax $(ML.sec-1)=11.79\pm1.69SD$ for the Runa and $9.74\pm1.27SD$ for the Bombina; Pmax $nW.kg-1)=222.42\pm42.42SD$ for the Rono and $169.03\pm34.52SD$ for the Bombinal. With more massive thigh muscles and greater mechanical power, the ranids would generate greater total power and thus higher energy release per unit time to muscle tissues for the burst take-off. As a consequence, biomechanical properties seen in the ranids seem to be more effective for frost take-off than in the Bombina.

  • PDF

A Study on Ways to Improve Benefits of Travel-time in Analyzing the Economic Efficiency (경제성분석시 통행시간절감편익 개선방안에 관한 연구)

  • Lee, Sooil;Lee, Seungjae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.263-270
    • /
    • 2010
  • This research has reviewed the ways to improve the benefits of shortening of transit hours among the benefit items in analysis of economic efficiency. The existing way of calculating the benefits of shortening the transit hours in analysis of economic efficiency has been using O/D in peak to multiply by 365. This method has a problem of not considering the change of traffic according to the month and the day of the week. To improve such problem, the volume of traffics at 361 regular research branches of the chronological statistics of traffic volume was used to analyze the pattern change of traffic volume per day of the week and per month by t-test and cluster analysis. The results show a difference in traffic volume according to the day of the week and the month. In the research example, a supposed O/D and network were used to apply weight per day of the week and per month to see a slight difference with the existing method of calculating benefits of shortening the transit hours. This signifies the necessity to study about the weight to consider the change pattern of traffic volume.

A Study on Outsourcing Application of M.E.P. System for Manufacturing Process Improvement of the Modular Construction Method (모듈러건축 공법의 공장제작과정 개선을 위한 M.E.P.시스템 외주제작 적용에 관한 연구)

  • Choi, Jun-Sok;Lee, Jae-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.277-283
    • /
    • 2018
  • This study is conducted to improve the manufacturing process of the modular construction method, which is a pre-fabricated construction method recognized for its advantage on the shortening of construction time. This study first identified the factors that result in shortening of pre-fabrication processes in the current module-processing factory. In addition, those identified factors were further considered for installing the M.E.P. system that is being outsourced on the main module in the production line. A manufacturing process of the construction modules, which considers installation of a M.E.P. system most suitable for shortening the time on the outsourcing of modular construction, is introduced throughout the research. Furthermore, this study suggests the factors in need of improvement during design phase of modular construction and improvement measures to consider the quality of unit modules by focusing on the module parts that are most exposed to defects.

Performance Evaluation of Channel Shortening Time Domain Equalizer in Wireless LAN Environment (무선랜 환경에서 채널 단축 시간영역 등화기의 성능평가)

  • Yoon Seok-Hyun;Yu Hee-Jung;Lee Il-Gu;Jeon Tae-Hyun;Lee Sok-Kyu
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.3A
    • /
    • pp.240-248
    • /
    • 2006
  • In this paper, we consider an OFDM receiver algorithm design for IEEE 802.11a/p system, which targeting large coverage area while keeping the transmission format unchanged. Particularly, taking into account the inter-symbol interference(ISI) and inter-carrier interference(ICI) that can be induced with large RMS delay spread, we employ channel shortening time-domain equalizer(TEQ) and evaluate the receiver performance in terms of SINR and packet error rate(PER). The preamble defined in IEEE802.11a/p is used to estimated the initial equalizer tap coefficients. Primary purpose of the paper is to give an answer to the question, though partially, whether or not 16-QAM constellation can be used in none line of sight environment at the boundary of a large coverage area. To this end, we first analyze the required TEQ parameters for the target channel environment and then perform simulation for PER performance evaluation in a generic frequency selective fading channel with exponential power-delay profile.