• Title/Summary/Keyword: Time Delays

Search Result 899, Processing Time 0.029 seconds

A Study on Simulation-based Method for Implementation of Ground Delay Program for Jeju International Airport (시뮬레이션 기반의 지상지연 프로그램 적용방안에 관한 연구 - 제주국제공항을 사례로 -)

  • Lee, Young-Jong;Cho, Ji-Eun;Baik, Ho-Jong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.1
    • /
    • pp.41-48
    • /
    • 2015
  • Being a cost-efficient solution for alleviating the traffic congestion in airspace, Air Traffic Flow Management (ATFM) has drawn more attentions from not only air traffic controllers but also researchers in the field of Air Traffic Management (ATM). Among other ATFM initiatives, it is believed that Ground Delay Program (GDP) could be effectively applied to reduce the congestion particularly in the relatively small airspace with dense traffic demand. This paper introduces a novel way that suggests flights to be delayed on the departing airports together with amount of the delays (in time) for those flights to be delayed. Adopting a fast-time simulation for predicting airspace delay of each flight for a given flight plan, the method is designed to iteratively and incrementally adjust the departure times in the plan towards reducing total airspace delays. Applying the method to Jeju airport with a hypothetically high demand, the paper demonstrates the airspace delay could be significantly reduced by applying GDP at Gimpo airport where more than 60% of Juju-bound flights departure. Although the simulation model needs to be calibrated and validated for the real-world application, the results clearly shows that the approach can possibly implemented as a tool for preparing the daily plan at the pre-tactical stage defined in the ICAO ATFM manual.

Sound Source Localization using HRTF database

  • Hwang, Sung-Mok;Park, Young-Jin;Park, Youn-Sik
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.751-755
    • /
    • 2005
  • We propose a sound source localization method using the Head-Related-Transfer-Function (HRTF) to be implemented in a robot platform. In conventional localization methods, the location of a sound source is estimated from the time delays of wave fronts arriving in each microphone standing in an array formation in free-field. In case of a human head this corresponds to Interaural-Time-Delay (ITD) which is simply the time delay of incoming sound waves between the two ears. Although ITD is an excellent sound cue in stimulating a lateral perception on the horizontal plane, confusion is often raised when tracking the sound location from ITD alone because each sound source and its mirror image about the interaural axis share the same ITD. On the other hand, HRTFs associated with a dummy head microphone system or a robot platform with several microphones contain not only the information regarding proper time delays but also phase and magnitude distortions due to diffraction and scattering by the shading object such as the head and body of the platform. As a result, a set of HRTFs for any given platform provides a substantial amount of information as to the whereabouts of the source once proper analysis can be performed. In this study, we introduce new phase and magnitude criteria to be satisfied by a set of output signals from the microphones in order to find the sound source location in accordance with the HRTF database empirically obtained in an anechoic chamber with the given platform. The suggested method is verified through an experiment in a household environment and compared against the conventional method in performance.

  • PDF

Cooperation of Time-delay for Internet-based Mobile Robot Using Fuzzy Logic

  • Yoo, Bong-Soo;Lee, Sang-Min;Joh, Joong-Seon
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.2 no.3
    • /
    • pp.179-184
    • /
    • 2002
  • Recently, internet-based applications can be found easily in various felds. Internet-based telerobot system becomes one of important applications of internet. Among many important technological issues on the internet-based telerobot, time-delay is inherently critical problem to be solved. Time-delay is classified as micro time-delay and macro time-delay in this paper. Algorithms for compensation of path-error and time-error are proposed for the both types of time-delays using fuzzy logic since fuzzy logic is one of the best tools to represent expert's knowledge. Simulation results show the validity of the proposed algorithms.

Time Discretization of Nonlinear Systems with Variable Time-Delayed Inputs using a Taylor Series Expansion

  • Choi Hyung-Jo;Chong Kil-To
    • Journal of Mechanical Science and Technology
    • /
    • v.20 no.6
    • /
    • pp.759-769
    • /
    • 2006
  • This paper proposes a new method of discretization for nonlinear systems using a Taylor series expansion and the zero-order hold assumption. The method is applied to sampled-data representations of nonlinear systems with input time delays. The delayed input varies in time and its amplitude is bounded. The maximum time-delayed input is assumed to be two sampling periods. The mathematical expressions of the discretization method are presented and the ability of the algorithm is tested using several examples. A computer simulation is used to demonstrate that the proposed algorithm accurately discretizes nonlinear systems with variable time-delayed inputs.

A TIME DETERMINATION MODEL INCORPORATING RISK MANAGEMENT BASED ON MALAYSIAN CASE STUDIES

  • Sim Nee Ting;Chung Thing Chong
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.642-648
    • /
    • 2009
  • Determining the total duration for a construction project is an integral part of project management in the construction industry. This is to ensure the project and all its associated activities can be carried out and completed within the time frame stipulated. There are several commonly used scheduling methods and techniques in project management, some of which involves manual calculation while others involve computer software. This paper looks into the various time determination methods, extracting out their differences and similarities. It also seeks to draw out the problems when determining time for projects, especially those encountered of case studies. Based on the results from the case studies, there were delays on certain projects even though time determination had been carried out rigorously prior to the commencement of the projects. This paper seeks to develop a time determination model, which incorporates risk management techniques into the calculations in order to improve the method for time estimation to minimize the chances of project delay.

  • PDF

Exploiting Static Non-Uniform Cache Architectures for Hard Real-Time Computing

  • Ding, Yiqiang;Zhang, Wei
    • Journal of Computing Science and Engineering
    • /
    • v.9 no.4
    • /
    • pp.177-189
    • /
    • 2015
  • High-performance processors using Non-Uniform Cache Architecture (NUCA) are increasingly used to deal with the growing wire delays in multicore/manycore processors. Due to the convergence of high-performance computing with embedded computing, NUCA caches are expected to benefit high-end embedded systems as well. However, for real-time systems that use multicore processors with NUCA caches, it is crucial to bound worst-case execution time (WCET) accurately and safely. In this paper, we developed a WCET analysis approach by considering the effect of static NUCA caches on WCET. We compared the WCET in real-time applications with different topologies of static NUCA caches. Our experimental results demonstrated that the static NUCA cache could improve the worst-case performance of realtime applications using multicore processor compared to the cache with uniform access time.

Multimicrocomputer Network Design for Real-Time Parallel Processing (실시간 병렬처리를 위한 다중마이크로컴퓨터망의 설계)

  • 김진호;고광식;김항준;최흥문
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.26 no.10
    • /
    • pp.1518-1527
    • /
    • 1989
  • We proposed a technique to design a multimicrocomputer system for real-time parallel processing with an interconnection network which has good network latency time. In order to simplify the performance evaluation and the design procedure under the hard real-time constraints we defined network latency time which takes into account the queueing delays of the networks. We designed a dynamic interconnection network following the proposed technique, and the simulation results show that we can easily estimate the multimicrocomputer system's approximate performance using the defined network latency time before the actual design, so this definition can help the efficient design of the real-time parallel processing systems.

  • PDF

Discrete Event System with Bounded Random Time Variation (제한된 시간변동을 갖는 시간제약 이산사건시스템의 스케줄링 분석)

  • Kim Ja Hui;Lee Tae Eok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.923-929
    • /
    • 2002
  • We discuss scheduling analysis for a discrete event system with time windows of which firing or holding time delays are subject to random variation within some finite range. To do this, we propose a modified p-lime Petri net, named p+-time Petri net. We develop a condition for which a synchronized transition does not have a dead token, that is, the firing epochs do not violate the time window constraints. We propose a method of computing the feasible range of the token sojourn time at each place based on a time difference graph. We also discuss an application for analyzing wafer residency times within the process chambers for a dual-armed cluster tool for chemical vapor deposition.

  • PDF

High Mortality Rate of Stomach Cancer Caused Not by High Incidence but Delays in Diagnosis in Aomori Prefecture, Japan

  • Matsuzaka, Masashi;Tanaka, Rina;Sasaki, Yoshihiro
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.10
    • /
    • pp.4723-4727
    • /
    • 2016
  • Background: There are substantial differences in the mortality rates of stomach cancer among the 47 prefectures in Japan, and Aomori prefecture is one of the most severely impacted. The aims of this study were to determine the incidence and mortality rates of stomach cancer in Aomori prefecture in comparison with Japan as a whole and cast light on reasons underlying variation. Methods: Data on stomach cancer cases were extracted from the Aomori Cancer Registry Database. Incidence rates for specific stages at the time of diagnosis were cited from Monitoring of Cancer Incidence in Japan, and mortality rates for stomach cancer in Aomori prefecture and the whole of Japan were obtained from Vital Statistics. Age-standardised incidence and mortality rates were calculated using the direct method. Results: The age-standardised incidence rate of stomach cancer in Aomori prefecture was higher than in the whole of Japan for males but lower for females. However, the age-standardised mortality rates were higher in Aomori prefecture in both sexes. The proportion of localised cancers was lower in Aomori prefecture than in the whole of Japan for most age groups. Conclusions: The lower rate for localised cancer suggests that higher age-standardised mortality rates are due to delays in diagnosis, despite an attendance rate for stomach cancer screening was higher in Aomori prefecture than in the whole of Japan. One plausible explanation for the failure of successful early detection might be poor quality control during screening implementation that impedes early detection.

A Traffic Assignment With Intersection Delay for Large Scale Urban Network (대규모 도시부 교통망에서의 이동류별 회전 지체를 고려한 통행배정연구)

  • Kang, Jin Dong;Woo, Wang Hee;Kim, Tae Gyun;Hong, Young Suk;Cho, Joong Rae
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.4
    • /
    • pp.3-17
    • /
    • 2013
  • The purpose of this study is to develop a traffic assignment model where the variable of signal intersection delay is taken into account in assigning traffic in large-scale network settings. Indeed, despite the fact that the majority of the increase in travel time or cost involving congested urban network or interrupted flow are accounted for by stop delays or congested delays at signal intersections, the existing traffic assignment models did not reflect this. The traffic assignment model considering intersection delays presented in this study was built based on the existing traffic assignment models, which were added to by the analysis technique for the computation of intersection delay provided in Korea Highway Capacity Manual. We can conclude that a multiple variety of simulation tests prove that this model can be applied to real network settings. Accordingly, this model shows the possibility of utilizing a model considering intersection delay for traffic policy decisions through analysis of effects of changes in traffic facilities on large urban areas.