• 제목/요약/키워드: Tidal Prediction

검색결과 137건 처리시간 0.022초

조석예보시스템의 구축 및 응용 (The Formulation of the Tidal Prediction System It's Application)

  • 정연철;채양범
    • 해양환경안전학회지
    • /
    • 제4권1호
    • /
    • pp.31-40
    • /
    • 1998
  • Through the combination of existing tidal prediction model and numerical tidal model, the efficient tidal prediction system was formulated and applied to the neighboring area of Pusan port. Because all tidal constituents for tidal prediction (69 tidal constituents are normally used) couldn't be considered due to the physical limits on computing process, some errors between the observed and predicted values were inevitably occurred. But it was confirmed that the computed values with maximum 10% of relative errors can be obtained if four major tidal constituents(M2, S2, K1, O1) are used. Thus, if other constituents than four major tidal constituents are additionally used, more accurate values will be obtained. Furthermore, if the database for harmonic constants in coastal waters is made in advance, using the numerical tidal model, prompt tidal prediction can be achieved at any time when it is required.

  • PDF

FORMULATION OF THE TIDAL PREDICTION SYSTEM AND IT'S APPLICATION

  • Chul, Jung-Yun
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 1997년도 Proceedings of KIN-CIN Joint Symposium 97 on Safety of Shipping and History of Maritime Communication between Korea and China around 9th Century
    • /
    • pp.111-124
    • /
    • 1997
  • With the combination of existing tidal predictio model and numerical tidal model, the efficient tidal prediction system was formulated and applied to the neighboring area of Pusan port. Because all tidal constituents for prediction (normally 69 constituents are used) can't be considered due to difficulties on computing efforts, some errors between the observed and predicted values were inevitably occurred. But it was confirmed that the practical results with about 10% of relative errors were obtained if four major tidal constituents(M$_2$, S$_2$. $K_1$, $O_1$) are used at least. Thus, if other constituents than four major tidal constituents are additornaly used, more accurate results will be obtained . Furthermore, if the databases of harmonic constants in coastal waters is made in advance using the numberical tidal model, prompt tidal prediction could be achieved whenever required.

  • PDF

Matlab T-tide를 이용한 조위예측기반의 조력발전량 산정에 관한 연구 (The study on Estimate of Tidal Power Using Matlab T-tide Based on Tide Prediction)

  • 이성훈;곽희진;김종득;이은춘;김지찬;전경식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1048-1049
    • /
    • 2015
  • The sihwa tidal power plant is the first tidal power plant in korea and the biggest of the world. The tidal power turbine is operated by tidal energy. The tidal energy is generated by the relative motion of the earth and celestial masses specially the sun and the moon, which interact via gravitational forces. The tidal power is estimated by the predicted the tidal amplitude and phase. This paper gives a process of estimate of tidal power using Matlab T-tide based on tide prediction. The proposed method is tested using actual recorded data comparing to predicted date.

  • PDF

금강하구둑에 의한 조석변화의 초기추정 (Preliminary Prediction of Tidal Changes due to a Barrier in the Keum River)

  • 최병호;오윤근
    • 물과 미래
    • /
    • 제20권2호
    • /
    • pp.161-168
    • /
    • 1987
  • 금강하구둑의 건설에 따른 조석체계의 변화에 대한 추정을 1차원 수치모델을 이용하여 수행하였다. 결과로서 금강하구 망월리 방조제는 주태음반일주조의 진폭을 증가시킬것으로 추정되었다. 이 초기추정의 유효성은 교류회로이론의 동수력학적인 유추법을 이용하여 검토되었다. 초기결과가 제시되었으며 토의되었다.

  • PDF

인천항 조석의 신속 예보 (Rapid Tidal Predictions for the Inchon Bay)

  • 최병호
    • 한국해안해양공학회지
    • /
    • 제7권4호
    • /
    • pp.355-367
    • /
    • 1995
  • 정점에서의 조석(조위, 조류)은 전통적으로 조화분석 및 예보에 의해 추정되며 다른 방법은 조석수치모형에 의한 예보이다. 본 연구에서는 수치모형의 직접적인 출력으로서 조석을 추정하는 방법과 장기간(1개월)의 모형출력을 조화분석한 조위와 조류의 조화상수의 Data Table을 근거로 한 인천항 전역의 임의위치에서의 실시간적으로 조석을 신속하게 추정하는 방법을 제시하였다.

  • PDF

Tidal Front in the Main Tidal Channel of Kyunggi Bay, Eastern Yellow Sea

  • Lee, Heung-Jae;Lee, Seok;Cho, Cheol-Ho;Kim, Cheol-Ho
    • Journal of the korean society of oceanography
    • /
    • 제37권1호
    • /
    • pp.10-19
    • /
    • 2002
  • The detailed structure of a tidal front and its ebb-to flood variation in the main tidal channel of the Kyunggi Bay in the mid-west coast of Korea were investigated by analyzing CTD data and drifter trajectories collected in late July 1999. A typical tidal front was formed in water about 60 m deep at the mouth of the channel. Isotherms and isohalines in the upper layer above the seasonal pycnocline in the offshore stratified zone inclined upward to the sea surface to form a surface front, while those in the lower layer declined to the bottom front. The location of the front is consistent with $100 S^3/cm^2$ of the mixing index H/U defined by Simpson and Hunter (1974), where H is the water depth and U is the amplitude of tidal current. The potential energy anomaly in the frontal zone varied at an ebb-to flood tidal cycle, showing a minimum at slack water after ebb but a maximum at slack water after flood. This ebb-to flood variation in potential energy anomaly is not accounted for by the mixing index. We conclude that on- and offshore displacement of the water column by tidal advection is responsible for the ebb-to-flood variation in the frontal zone.

조위 및 조류 예측 정확도의 개선 방법 (A Method for Improvement of Tide and Tidal Current Prediction Accuracy)

  • 정태성
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제13권4호
    • /
    • pp.234-240
    • /
    • 2010
  • 연안개발로 인해 발생하는 해양환경 변화를 정확히 예측하여 해양환경을 효율적으로 관리하기 위해서는 정확한 조위 및 조류 분포에 관한 자료의 확보가 필수적이다. 그러나 현재 대부분의 환경영향평가에서는 조석 수치모의에서 제한된 조석분조 만을 사용하여 조위와 조류분포를 예측하여 많은 분조의 합성에 의해 발생되는 실제 조석현상을 정확하게 계산하지 못하고 있으며, 이로 인해 환경영향평가에 오류가 발생하고 있다. 본 연구에서는 제한된 분조의외해 개방경계에서 조화상수를 가지고도 연안에서 관측된 조위자료를 활용하여 실시간으로 정확하게 조위 및 조류 분포를 예측할 수 있는 방법을 제안하였다. 4개 분조에 의한 조위와 38개 분조에 의한 조차의 비 그리고 모의조차와 관측조차의 비를 가지고 보정한 조위 예측결과는 관측조위와 잘 일치하였다.

사면구조 격자를 이용한 조석흐름 수치모의 (Numerical analysis of a tidal flow using quadtree grid)

  • 김종호;김형준;남궁돈;조용식
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.163-167
    • /
    • 2007
  • For numerical analysis of a tidal flow, a two-dimensional hydrodynamic model is developed by solving the nonlinear shallow-water equations. The governing equations are discretized explicitly with a finite difference leap-frog scheme and a first-order upwind scheme on adaptive hierarchical quadtree grids. The developed model is verified by applying to prediction of tidal behaviors. The calculated tidal levels are compared to available field measurements. A very reasonable agreement is observed.

  • PDF

가로림만 조력발전소 가동에 따른 조석체계 변화 예측 (Prediction of Tidal Regime According To Garolim Tidal Power Plant operation)

  • 강석구;이광수;박진순;염기대
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.639-643
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF

가로림만 조력발전소 가동에 따른 조석체계 변화 예측 (Prediction of Tidal Regime According To Garolim Tidal Power Plant operation)

  • 강석구;이광수;박진순;염기대;정경태;장찬주
    • 신재생에너지
    • /
    • 제3권2호
    • /
    • pp.3-10
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF