• Title/Summary/Keyword: Three gorges project

Search Result 10, Processing Time 0.031 seconds

Project Summary of Three Gorges' 840MVA Hydro-generator with Close-Loop-Self-Circulating Evaporative Cooling System

  • Yuan, Jiayi;Meng, Dawei;Gu, Guobiao;Song, Fuchuan;Zhang, Tianpeng
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.1
    • /
    • pp.48-53
    • /
    • 2014
  • In December 2011 and July 2012, two sets of 840MVA hydro-generator of Three Gorges on Yangtze River with Close-loop-self-circulating evaporative cooling (CLSCEC) system were put into commercial operation. In this paper, we make engineering summary of these two generators with CLSCEC system. We also make a comparison between the internal water cooling (IWC) hydro-generator and the CLSCEC hydro-generator used in Three Gorges power plant in fields of their operating characteristics, working performances, technical features, working safety and reliability. In addition, engineering structures, type tests' results and systematic emulating calculation of CLSCEC schemes are analyzed.

Stability Analysis by FEM on New Large Shiplock Slopes in Yangtze River (유한요소법에 의한 양쯔강 신설 대수로사면 안정검토)

  • Chen, Jian;Choi, Yong-Ki;Park, Jong-Ho;Woo, Sang-Baik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.20-27
    • /
    • 2006
  • 중국 Three Gorges Project의 대수로사면 안정성은 설계와 시공측면에 있어 주요 관심사가 되었다. 사면 굴착으로 인한 제하과정에서 암반은 역학적으로 불안정한 상태에 놓인다. 본 논문은 FEM(2D-3D)를 이용하여 단층 암반 굴착으로 인한 암반사면의 안정성을 평가하였다. 해석결과 굴착 후 수로사면의 양측 수직벽과 분리울타리의 중간 상부에서 인장응력과 전단손상영역이 주로 발생하였다. 해석결과를 토대로 대규모 사면활동에 대한 안정성을 확인하였으나 시공단계에서 국부적 사면활동을 방지하기 위한 록볼트와 록앵커 등의 보강이 필요한 것으로 검토되었다.

  • PDF

INVESTIGATION ON WELDING OF VIRGO 104 LOW CARBON MARTENSITIC STAINLESS STEEL

  • Du, Bing;Jia, Yuli;Zhou, Baojin;Zhou, Shifeng
    • Proceedings of the KWS Conference
    • /
    • 2002.10a
    • /
    • pp.255-259
    • /
    • 2002
  • VIRGO 104 is a low carbon martensitic stainless steel that is applied to the famous Three Gorges Project. By using VOD melting process VIRGO 104 has low carbon and [H] [O] contents, and shows excellent mechanical properties and weldability. The best solution to guarantee welding quality is PWHT by 600 Cx8h.

  • PDF

Limitations of National Responsibility and its Application on Marine Environmental Pollution beyond Borders -Focused on the Effects of China's Three Gorges Dam on the Marine Environment in the East China Sea- (국경을 넘는 해양환경오염에 대한 국가책임과 적용의 한계 -중국의 산샤댐 건설로 인한 동중국해 해양환경 영향을 중심으로-)

  • Yang, Hee Cheol
    • Ocean and Polar Research
    • /
    • v.37 no.4
    • /
    • pp.341-356
    • /
    • 2015
  • A nation has a sovereign right to develop and use its natural resources according to its policies with regard to development and the relevant environment. A nation also has an obligation not to harm other countries or damage environments of neighboring countries as consequences of such actions of developments or use of natural resources. However, international precedents induce a nation to take additional actions not to cause more damages from the specific acts causing environmental damages beyond national borders, when such acts have economic and social importance. That is to say that there is a tendency to resolve such issues in a way to promote the balance between the mutual interests by allowing such actions to continue. A solution to China's Three Gorges Dam dilemma based on a soft law approach is more credible than relying on a good faith approach of national responsibilities and international legal proceedings since the construction and operation of the dam falls within the category of exercising national sovereign rights. If a large scale construction project such as the Three Gorges Dam or operation of a nuclear power plant causes or may cause environmental damage beyond the border of a nation engaged in such an undertaking, countries affected by this undertaking should jointly monitor the environmental effects in a spirit of cooperation rather than trying to stop the construction and should seek cooperative solutions of mutual understanding to establish measures to prevent further damages. If China's Three Gorges Dam construction and operation cause or contain the possibility of causing serious damages to marine environment, China cannot set aside its national responsibility to meet international obligations if China is aware of or knows about the damage that has occurred or may occur but fail to prevent, minimize, reverse or eliminate additional chances of such damages, or fails to put in place measures in order to prevent the recurrence of such damages. However, Korea must be able to prove a causal relationship between the relevant actions and resulting damages if it is to raise objections to the construction or request certain damage-prevention actions against crucial adverse effects on the marine environment out of respect for China's right to develop resources and acts of use thereof. Therefore, it is essential to cumulate continuous monitoring and evaluations information pertaining to marine environmental changes and impacts or responses of affected waters as well as acquisition of scientific baseline data with observed changes in such baseline. As China has adopted a somewhat nonchalant attitude toward taking adequate actions to protect against marine pollution risks or adverse effects caused by the construction and operation of China's Three Gorges Dam, there is a need to persuade China to adopt a more active stance and become involved in the monitoring and co-investigation of the Yellow Sea in order to protect the marine environment. Moreover, there is a need to build a regular environmental monitoring system that includes the evaluation of environmental effects beyond borders. The Espoo Convention can serve as a mechanism to ease potential conflicts of national interest in the Northeast Asian waters where political and historical sensitivities are acute. Especially, the recent diplomatic policy advanced by Korea and China can be implemented as an important example of gentle cooperation as the policy tool of choice is based on regional cooperation or cooperation between different regions.

Numerical analysis and fluid-solid coupling model test of filling-type fracture water inrush and mud gush

  • Li, Li-Ping;Chen, Di-Yang;Li, Shu-Cai;Shi, Shao-Shuai;Zhang, Ming-Guang;Liu, Hong-Liang
    • Geomechanics and Engineering
    • /
    • v.13 no.6
    • /
    • pp.1011-1025
    • /
    • 2017
  • The geological conditions surrounding the Jijiapo Tunnel of the Three Gorges Fanba Highway project in Hubei Province are very complex. In this paper, a 3-D physical model was carried out to study the evolution process of filling-type fracture water inrush and mud gush based on the conditions of the section located between 16.040 km and 16.042 km of the Jijiapo Tunnel. The 3-D physical model was conducted to clarify the effect of the self-weight of the groundwater level and tunnel excavation during water inrush and mud gush. The results of the displacement, stress and seepage pressure of fracture and surrounding rock in the physical model were analyzed. In the physical model the results of the model test show that the rock displacement suddenly jumped after sustainable growth, rock stress and rock seepage suddenly decreased after continuous growth before water inrushing. Once water inrush occured, internal displacement of filler increased successively from bottom up, stress and seepage pressure of filler droped successively from bottom up, which presented as water inrush and mud gush of filling-type fracture was a evolving process from bottom up. The numerical study was compared with the model test to demonstrate the effectiveness and accuracy of the results of the model test.