• Title/Summary/Keyword: Therblig Analysis

Search Result 4, Processing Time 0.017 seconds

A Method on a Proper Time Evaluation for Railway Emergency Response Staffs using the Therblig Analysis (Therblig 기법을 활용한 철도비상대응직원의 적정 비상대응조치 시간 도출 방안)

  • Park, Min-Kyu;Kim, Si-Gon;Sim, Young-Rok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.689-695
    • /
    • 2007
  • This Paper introduced a proper time evaluation for railway emergency response staffs using the Therblig Analysis. We defines what Activities the emergency response staffs should take when the fire occurs on the railway. This has been possible through the development of the scenario that is focused on the fire accident and it also has been driven to minimize the spread and damage of the accident. Gilbreth's Therblig Analysis has been used here to derive the reasonable time that would take for the emergency response staffs to respond to the fire accident on the railway system. We developed Emergency Response Scenario against Accidents and defined the Activity of the main Action for Emergency Response staffs.

  • PDF

Productivity Improvement Plan Using Motion Analysis and Facility Relocation : Case Study (동작분석과 설비 재배치를 통한 생산성 향상 방안 : 사례연구)

  • Kim, Dong-Hyun;Park, Dong-Bin;Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.71-81
    • /
    • 2010
  • Today's fierce competition and global economic recession make most of manufacturing companies in the world difficult to gain a profit. In order to survive such a environment and increase competitiveness, manufacturing companies have to continuously eliminate their wasteful factors through an efficient process analysis, improve quality of products, increase the flexibility of manufacturing processes. In this paper, we consider a case study for the Shanghai New Auto which is a subcontractor of MOBIS in China, to improve productivity by using therblig method, one of the motion analysis, to minimize the work-in-process inventories and to shorten the manufacturing cycle times. We also try to relocate the facility layout to increase the efficiency and flexibility of manufacturing processes.

Suggestion of Model Change Work Improvement by REBA and Therblig

  • Lee, Sung-Koon;Park, Peom
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.6
    • /
    • pp.757-764
    • /
    • 2011
  • Objective: The aim of this study was to provide a method to improve the compliance and reduce the time by reducing the workload during the model change work. Background: The enterprises are constructing the small quantity batch production system by increasing the number of model change and reducing model-changing. However, the compliance is low because the work is strenuous and high skills are needed, so the system management is facing with many difficulties. Method: After classifying the model change work according to the purposes(preparation, change and adjustment) with the target of mascara filling machine, element tasks time were measured and the motion analysis(therblig symbol) and REBA analysis were performed. The study incorporated 3 independent variables as the number of motion, REBA score and the element time. The dependent variable is the type of element work as preparation, change and adjustment. The statistical test was performed by one-way ANOVA(${\alpha}$ < 0.05). Results: For the preparation, the number of motions appeared in the order of Use(U), Transport Loaded(TL), and Position(P). The order appeared in change is Use(U), Release Load(RL), and Grasp (G). The adjustment appeared in the order of Position(P) and Use(U). The results of average motion time as the element work times divided by the number of motion appeared in the order of adjustment(1.85sec/motion), preparation(1.11sec/motion), and change(0.62sec/motion). The results of REBA showed that the average risk level of change and adjustment were medium, but 53.1% of change and 42.9% of adjustment were evaluated as high. Conclusion: Reducing the avoidance and improving the compliance of work could be expected if the job autonomy were improved by improving the working postures with high risk level. Application: It is expected to solve the problem of reducing the time of model change work in the small quantity batch production system. The future work is to carry out the improvement directions found in the results and compare the results after improvement.

Investigation & Analysis about fatalities of falls from height at construction work (건설현장(建設現場) 추락(墜落) 사망재해(死亡災害) 원인(原因) 조사(調査) 분석(分析))

  • Ko, Young-Wook;Kim, Dong-Ryeong;Cho, Joung-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.49-57
    • /
    • 2012
  • Proportion of falling from height accident at construction work accounts for more than 40%, and the number of injuries is getting increased. So without considering falling from height, we can say that it's hard to achieve our goal(accident prevention). Another critical point that we have to think about theses days is the fact that construction workers are getting older. To be specific, the number of workers who are above 50 years old accounts for 65.6% among the fatalities(2007~2011, KOSHA inspection). Accordingly, to effectively prevent construction accedents, especially falls from height, we need to focus on motion analysis of older construction workers and then make suitable measures for growing accident rates at construction work.