• Title/Summary/Keyword: The safety of tunnel face

Search Result 62, Processing Time 0.026 seconds

Effect of a frontal impermeable layer on the excess slurry pressure during the shield tunnelling in the saturated sand (포화 사질토에서 전방 차수층이 쉴드터널 초과 이수압에 미치는영향)

  • Lee, Yong-Jun;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.4
    • /
    • pp.347-370
    • /
    • 2011
  • Slurry type shield would be very effective for the tunnelling in a sandy ground, when the slurry pressure would be properly adjusted. Low slurry pressure could cause a tunnel face failure or a ground settlement in front of the tunnel face. Thus, the stability of tunnel face could be maintained by applying an excess slurry pressure that is larger than the active earth pressure. However, the slurry pressure should increase properly because an excessively high slurry pressure could cause the slurry flow out or the passive failure of the frontal ground. It is possible to apply the high slurry pressure without passive failure if a horizontal impermeable layer is located in the ground in front of the tunnel face, but its location, size, and effects are not clearly known yet. In this research, two-dimensional model tests were carried out in order to find out the effect of a horizontal impermeable layer for the slurry shield tunnelling in a saturated sandy ground. In tests slurry pressure was increased until the slurry flowed out of the ground surface or the ground fails. Location and dimension of the impermeable layer were varied. As results, the maximum and the excess slurry pressure in sandy ground were linearly proportional to the cover depth. Larger slurry pressure could be applied to increase the stability of the tunnel face when the impermeable layer was located in the ground above the crown in front of the tunnel face. The most effective length of the impermeable grouting layer was 1.0 ~ 1.5D, and the location was 1.0D above the crown level. The safety factor could be suggested as the ratio of the maximum slurry pressure to the active earth pressure at the tunnel face. It could also be suggested that the slurry pressure in the magnitude of 3.5 ~4.0 times larger than the active earth pressure at the initial tunnel face could be applied if the impermeable layer was constructed at the optimal location.

Stability analysis of a tunnel excavated in weak rocks and the optimal design for the support pattern (연약지반내 굴착터널의 안정성 평가 및 최적보강설계에 관한 연구)

  • 최성웅;신희순
    • Tunnel and Underground Space
    • /
    • v.7 no.3
    • /
    • pp.191-201
    • /
    • 1997
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the safety of the tunnel and should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design step used be insisted for the whole excavation steps in spite of the various geological conditions. OO tunnel was excavated with NATM and a support pattern type-V in weak rocks. When the tunnel was excavated up to 25m long, the severe displacement was generated in the portal area and the shotcrete was damaged to make the cracks and the tunnel face was totally collapsed. It might happen owing to the one-day heavy rain, but the exact reason for that accident should be found out and the new optimal support patternt needed. Consequently three dimensional numerical analysis was applied for the evaluation of the cause of the tunnel collapse instead of two dimensional analysis, because three dimensional analysis can show better the real field phenomenon than two dimensional analysis in which the load distribution methods are adopted for the tunnel excavation. We could simulate the actual situations with three dimensional finite difference code and propose the new optimal support patterns.

  • PDF

Numerical analysis of water flow characteristics after inrushing from the tunnel floor in process of karst tunnel excavation

  • Li, S.C.;Wu, J.;Xu, Z.H.;Li, L.P.;Huang, X.;Xue, Y.G.;Wang, Z.C.
    • Geomechanics and Engineering
    • /
    • v.10 no.4
    • /
    • pp.471-526
    • /
    • 2016
  • In order to investigate water flow characteristics after inrushing in process of karst tunnel excavation, numerical simulations for five case studies of water inrush from the tunnel floor are carried out by using the FLUENT software on the background of Qiyueshan high risk karst tunnel. Firstly, the velocity-distance curves and pressure-distance curves are drawn by selecting a series of probing lines in a plane. Then, the variation characteristics of velocity and pressure are analyzed and the respective optimized escape routes are made. Finally, water flow characteristics after inrushing from the tunnel floor are discussed and summarized by comparing case studies under the conditions of different water-inrush positions and excavation situations. The results show that: (1) Tunnel constructors should first move to the tunnel side wall and then escape quickly when water inrush happens. (2) Tunnel constructors must not stay at the intersection area of the cross passage and tunnels when escaping. (3) When water inrush from floor happens in the left tunnel, if tunnel constructors meet the cross passage during escaping, they should pass through it rapidly, turn to the right tunnel and run to the entrance. (4) When water inrush from floor happens in the left tunnel, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment in the vicinity of the right tunnel working face. In addition, some rescuing equipment can be set up at the high location of the cross passage. (5) When water inrush from floor happens in the cross passage, tunnel constructors should move to the tunnel side wall quickly, turn to the tunnel without water inrush and run to the entrance. (6) When water inrush from floor happens in the cross passage, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment near by the left or the right tunnel working face. The results are of important practical significance and engineering value to ensure the safety of tunnel construction.

A Study on the Safety Assessment Technique of a Tunnel Using Critical Stain Concept (한계변형률 개념을 활용한 터널 안정성 평가에 관한 연구)

  • Park, Si-Hyun;Shin, Yong-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.29-41
    • /
    • 2007
  • An assesment technique for the quantitative evaluation of tunnel safety during tunnel excavation was newly proposed in this study using displacement measurements. First of all, field measurement guidelines used at tunnel construction sites in Korea and other countries were investigated. It was found out that the criteria of the guidelines were not clear and varied depending on the construction sites. The practical use of field measurement data for the evaluation of tunnel safety was very limited due to uncertainties of the guidelines related to the interpretation of measured data during the excavation. Critical strain concept is introduced in this study for the assesment of tunnel safety during the tunnel excavation. Moreover, the characteristics of tunnel displacements caused by the tunnel excavation were investigated in detail in order to investigate the practical application of the critical strain concept. The total tunnel displacements can be subdivided into three parts: displacements occurring ahead of tunnel face, displacements occurring prior to measurements, and displacements occurring after the installation of instruments. The characteristic of each portion of displacements is analysed in this study. Finally, a general method on the use of the displacement measurement data for the critical strain concept was suggested in the concrete manner, considering the field measurement practice in Korea.

A Study on Geological Factors Affecting Behavior of Sedimentary Rock Tunnel Using Quantification Method Type I (수량화방법 I을 이용한 퇴적암 터널의 지질 인자별 변위 영향도 분석)

  • Yim, Sung-Bin;Seo, Yong-Seok;Kim, Chang-Yong;Kim, Kwang-Yoem
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.263-270
    • /
    • 2007
  • Tunnel behavior measured by monitoring during construction is a main item for safety evaluation and it depends widely upon local geological characteristics. To assess in this study how much the geological factors influence on tunnel behavior for each RMR factor, a quantification analysis was carried out using tunnel face maps and measurements as explanatory variables and dependent variables, respectively. The results showed that average significance of the influence of RMR factors - R1, R2, R3, R4 and R5, on tunnel displacements are 17.0%, 20.4%, 20.4%, 11.6% and 30.6%, respectively, and this probably indicates that the groundwater condition played a significant role for the tunnel displacement.

The Pre-Evaluation of Stability during Tunnel Excavation using Unconfined Compression Strength of Intact Rock or Rock Mass and Crown Settlement Data (터널천단변위와 암석 또는 암반의 일축압축강도를 이용한 시공 중인 터널의 예비 안정성 평가)

  • Park, Young Hwa;Moon, Hong Duk;Ha, Man Bok
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.27-32
    • /
    • 2015
  • PURPOSES : It is difficult to estimate tunnel stability because of lack of timely information during tunnel excavation. Tunnel deformability refers to the capacity of rock to strain under applied loads or unloads during tunnel excavation. This study was conducted to analyze a methods of pre-evaluation of stability during tunnel construction using the critical strain concept, which is applied to the results of tunnel settlement data and unconfined compression strength of intact rock or rock mass at the tunnel construction site. METHODS : Based on the critical strain concept, the pre-evaluation of stability of a tunnel was performed in the Daegu region, at a tunnel through andesite and granite rock. The critical strain concept is a method of predicting tunnel behavior from tunnel crown settlement data using the critical strain chart that is obtained from the relationship between strain and the unconfined compression strength of intact rock in a laboratory. RESULTS : In a pre-evaluation of stability of a tunnel, only actually measured crown settlement data is plotted on the lower position of the critical strain chart, to be compared with the total displacement of crown settlement, including precedent settlement and displacement data from before the settlement measurement. However, both cases show almost the same tunnel behavior. In an evaluation using rock mass instead of intact rock, the data for the rock mass strength is plotted on the lower portion of the critical strain chart, as a way to compare to the data for intact rock strength. CONCLUSIONS : From the results of the pre-evaluation of stability of the tunnel using the critical strain chart, we reaffirmed that it is possible to promptly evaluate the stability of a tunnel under construction. Moreover, this research shows that a safety evaluation using the actual instrumented crown settlement data with the unconfined compression strength of intact rock, rather than with the unconfined compression strength of a rock mass in the tunnel working face, is more conservative.

A Study on the Improvement of Temporary Ventilation of long tunnel Using the Field Measurement data (현장 실측을 통한 장대터널 공사중 환기 문제점 연구)

  • Hong, Chang-Soo;Hwang, Dae-Jin;Kang, Hyun-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1350-1357
    • /
    • 2010
  • In tunnelling, temporary ventilation is very important factor in the safety of worker and the work efficiency which is affected by visibility. There are a lot of problems in the recent tunnel construction, because the longer the tunnel, the more the present design doesn't satisfy the allowable standard about dust and air pollution. Especially, In case the length of tunnel is more than 1,000m, the ventilation efficiency tends to decrease. In this study, the field measurement of the degree of contamination was performed near the face of tunnel. Based on the results obtained, the main factors of problem in temporary ventilation are the difference of temperature between outside and inside, the rate of leakage of ventilation duct and the dust and so on. It maybe helpful to the solution of problems, and also the accurate ventilation estimate.

  • PDF

Construction Plan by Large Diameter Shield TBM Method and Analysis of Deformation on Site Under Soo-Young River (대구경 Shield TBM공법에 의한 수영강 하저터널 시공계획 및 시공중 발생되는 거동의 공학적 분석)

  • 윤현돈;황규호;최기훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.25-32
    • /
    • 2001
  • Doosan Construction & Engineering Co., Ltd is building a railway tunnel beneath the Soo-Young River connecting MinLak Station and Centum City Station, a section 230, subway line 2, Pusan City, Korea. When completed the tunnel will have a finished inner diameter of 6.5m(21.311) throughout its total length of 840m(420m = 0.52 miles, Two Single Track Tunnel : 420m+420m). The ground profile of the face toward shield machine is composed of multi layers, silty clay, clayey gravel, soft rock etc. This research paper is to predict ground deformation and variation of stresses around tunnel using Hyperbolic model, and to reflect the works on the next shield tunneling project. And this research paper is analyzed data of measuring instrument (such as settlement gauge, inclinometer, Multiple extensometer, etc.) which is installed along tunnel line for safety of tunnel. For calculations, the finite difference Method is applied. Backfill grouting material is supposed to have instantly strength of 10kg/$\textrm{cm}^2$ above, although its strength is available after 24 hours passed.

  • PDF

Auxiliary Reinforcement Method for the Safety of Tunnelling Face (터널 막장안정성에 따른 보강공법 적용)

  • Kim, Chang-Yong;Park, Chi-Hyun;Bae, Gyu-Jin;Hong, Sung-Wan;Oh, Myung-Ryul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.11-21
    • /
    • 2000
  • Tunnelling has been created as a great extent in view of less land space available because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities. In tunnelling, it is often faced that measures are obliged to be taken without confirmation for such abnormality as diverged movement of surrounding rock mass, growing crack of shotcrete and yielding of rockbolts. In this case, it is usually said that the judgments of experienced engineers for the selection of measure are importance and allowed us to get over the situations in many construction sites. But decrease of such experienced engineers need us to develop the new system to assist the selection of measures for the abnormality without any experiences of similar tunnelling sites. In this study, After a lot of tunnelling reinforcement methods were surveyed and the detail application were studied, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

MORDERN METHODS FOR TUNNEL (지하철 터널 굴착공법)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.14 no.3
    • /
    • pp.9-21
    • /
    • 1981
  • The rationalization for Tunnel Drifting is based on the high productivity which is achievable due to Continuous work with a Jumbo Drill, resulting in a much higher efficiency them the Conventional method of blasting, mucking and supporting services. Large projects of over 4,000m Tunnel Drifting are condidated to justify the use of a Jumbo Drill with a combination of superior explosives, machinery and techniques. During a Tunnel Drifting test, Gulita, Nabit and slurry made by Nitro Nobel were employed with following results. 1, Conditions: a. Granite Rock with Two free face b. Burden (W), 2m c. Diameter of hole, 42mm d. Depth of hole 3.5m e. Hole pitch 0.6m f. Charged Explosive per hole Gelatin Dynamite 4 pieces (112.5${\times}$4ea)+Guuita 5 pieces(110g${\times}$5ea) g. Simal-taneous Detonation h. After the blasting resultant rock size was Less 40% of the 0.3m Lumps. 2. Calculation results W=q/Wn=100cm‥‥‥Burden in simultaneous blasting 0.865kg(7.7ea)/hole ‥‥‥Amount of charge but hole pitch is 1.5W-2W The estimated cost of using a Jumbo Drill for the Construction of a 3,000,000 bbL sub-surface oil storage would be as follows: This calculation is based on the Jumbo Drill advancing 3.6m per blasting cycle. Unit cost/bbL Excavation $3.13 The attached sheet shows ideal Drilling pattern with Burn Cut & Smooth blasting method. In conclusion, it is my opinion that this method will assure safety and save cost and improve our technical know-how.