• Title/Summary/Keyword: The accumulation cost of freight

Search Result 3, Processing Time 0.229 seconds

A Study on the Queueing Simulation of Lock Gates according to the Functional Rearrangement in Incheon Port (인천항 기능 재배치에 따른 갑문의 대기 시뮬레이션 연구)

  • Koo, Ja-Yun
    • Journal of Navigation and Port Research
    • /
    • v.31 no.3 s.119
    • /
    • pp.205-212
    • /
    • 2007
  • Due to the construction of Incheon Grand Bridge, there is driven a necessity for rearranging the function of Inner Port with the development of Outer South Port. In this paper, I'd like to simulate the port operation levels of Lock Gate in Inner Port with estimating the traffic volumes of 2011 and 2015, which will reveal the Demurrage Cost and the Accumulation Cost of Freight in Inner Port. Finally I will evaluate the economic movement effects of the container ship's calling from Inner port to South Port/Outer South Port from 2011 to 2015. The results are as followings ; (1) The average utilization of Lock Gates are reduced by $7\sim8$ percentage point. (2) The mean queueing value are saved by 25 percentage point. (3) The Demurrage Cost and the Accumulation Cost of Freight except Lock Gate charges and the Benefit of Routeing Reduction are saved about 800 million Won annually.

A Study on the Optimal Span Width In the Bridge Main Span of Incheon 2nd Bridge (2) Economic Analysis on Port Operational Efficiency according to Traffic Schemes in the Bridge Main Span of Incheon 2nd Bridge (인천항 제2연륙교 주경간의 적정 교각폭 결정에 관한 연구 (2) 제2연륙교 주경간의 통항방식에 따른 항만운영효율의 경제성 분석)

  • Koo Ja-Yun;Kim Seok-Jae;Jang Eun-Kyu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.337-342
    • /
    • 2004
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, have been proposed by the private capital in 1999. But the optimal span width in the bridge main span have not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, me-way or two-way of vessels over 10,000G/T, in the bridge main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768..9 billion won.

  • PDF

A Study on the Optimal Width of the Main Span In the 2nd Bridge of lncheon (2) Economic Analysis on Port Operation according to Traffic Schemes in the Main Span (인천항 제2연륙교 적정 주경간 폭 결정에 관한 연구 (2) 주경간의 통항방식에 따른 항만운영의 경제성 분석)

  • Koo Ja-Yun;Kim Seok- Jae;Jang Eun- Kyu
    • Journal of Navigation and Port Research
    • /
    • v.29 no.1 s.97
    • /
    • pp.65-69
    • /
    • 2005
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two-way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.