• Title/Summary/Keyword: Testing Equipment

Search Result 857, Processing Time 0.039 seconds

A Study on the Testing System for Network Equipments (네트워크장비 시험체계에 관한 연구)

  • 이준원
    • The Journal of the Korea Contents Association
    • /
    • v.4 no.2
    • /
    • pp.61-67
    • /
    • 2004
  • This paper describes the importance of the network equipment markets and the necessity of the testing and the verification for the network equipments and the effective system for network equipment test. With the rapid internet service development, the demands of the network equipments(for example, router, switching equipment etc.) are expanded. The network equipments request the high love technologies, so the foreign network equipments are prevailed in the domestic market. But the development of the network equipments in korea is in the beginning stage. To deploy the network equipments into the real network the network equipments should be tested and verified by the certified test labs. To get the verification from the foreign test lab, it takes a lot of expenses and times. For the competitiveness of our products in the international markets, the technique of the test and verification on the network equipments should be level-up. This paper investigates the network equipments market condition and the network equipments test condition in Korea. For the competitiveness of our commodities in the international markets, this paper proposes the testing strategy for network equipments.

  • PDF

Evaluation on Slam Resistance of Door Plate Module Using Vibration Testing Method (가진 시험 방법을 활용한 자동차 도어 플레이트 모듈 슬램 내구 평가)

  • Kim, Chan-Jung;Son, Tae-Kwan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.10
    • /
    • pp.968-973
    • /
    • 2012
  • Slam testing is a mandatory testing process to evaluate the fatigue resistance of a door plate module before delivering it to car makers. This process is very hard job to complete it since the testing facilities are considerably expensive and the required testing time is relatively very long, i.e. more than eight days for a single specimen. In this paper, an accelerated testing method of a door plate module is proposed using vibration test equipment instead of the current one by exposing to the critical excitation of a door glass. Under the proposed excitation method, the similar testing result can be evaluated within less than two hours. The suitability of the proposed testing method was demonstrated by comparing failure modes of both the current testing method and the proposed one.

Aviation Security Equipments Certification System in Korea: Suggestions for Improvement (항공보안장비 성능인증제의 고도화 방안에 관한 연구)

  • Lee, Wonjoo;Yu, Sangwoo;Park, Soohong;Kim, Kyunghoon;Ha, Dasom;Seoll, Eunsuk;Han, Soojin;Park, Seoha;Lee, Jisu;Kim, Chanhwi;Kang, Jingu;Lee, Kiyoung
    • Journal of Korean Society for Quality Management
    • /
    • v.48 no.3
    • /
    • pp.395-408
    • /
    • 2020
  • Purpose: This study was performed for advancement of aviation security equipments certification system. Methods: We investigated aviation security equipments certification-related registrations and the latest research trends of explosive detection technologies. Based on the literature studies, we draw the critical issues of the aviation security equipment certification system and suggested improvement direction. Results: We found some inaccuracies of the definition of explosive trace detection equipments, accreditation review committee, and performance evaluation test method. These problems should be modified to suit being practical. Conclusion: The present results would be useful for basic data for modifying aviation security equipments certification systems.

Testing Items Change on Characteristics of Protective relays (보호계전기 특성시험기술의 시험항목 변화)

  • Jang, Byung-Tae;Lee, Nam-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.161-162
    • /
    • 2008
  • The steady state performance test for the digital protective relay using general relay test equipment has been main test methods. Because of the development of advanced power system testing equipments, dynamic performance test has been carried out additionally using a digital simulator such as RTDS(Real Time Digital Simulator). For the case of newly adopted digital protective relay with IEC 61850 and network, performance testing items need supplementing. This report displays testing items change according to newly protective relay.

  • PDF

A study of coordination under short-circuit conditions between circuit-breakers (저압차단기의 차단보호협조 특성연구)

  • Oh, J.S.;Na, C.B.;Ham, G.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.476-478
    • /
    • 2001
  • Coordination under short-circuit conditions is a systematic application of protective devices in the electrical power system, which, in response to a fault, will remove only a minimum amount of equipment from service. The objective is not only to minimize the equipment damage and process outage costs, but also to protect personnel from the effects of these failures. The coordination study of an electric power system consists of an organizes time-current study of all devices in series from the utilization device to the source. This study is a comparison of the time it takes the individual devices to operate when certain levels of normal or abnormal current pass through the protective devices. The objective of a coordination study is to determine the characteristics, ratings, and settings of overcurrent protective devices that will ensure that the minimum unfaulted load is interrupted when the protective devices isolate a fault or overload anywhere in the system. At the same time, the devices and settings selected should provide satisfactory protection against overloads on the equipment and interrupt short-circuit as rapidly as possible.

  • PDF

A Study on fostering strategy for Port Equipment industry (스마트항만 구축을 위한 항만장비산업 육성 방안 연구)

  • 김보경;한승훈;안승현
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.05a
    • /
    • pp.108-109
    • /
    • 2023
  • The purpose of this study is to set a policy that can be specifically promoted according to the recently announced domestic equipment industry fostering strategy, and to suggest a plan that can be implemented. As a plan to foster the equipment industry, a new technology certification system and a new technology test and verification area operation and vitalization plan were set as alternatives. And a survey was conducted on companies conducting R&D to derive specific demand and introduction plans. As a result of the survey, it was found that there was a high demand for the use of new technology certification systems and testing and verification area. Also demonstration in connection with port equipment, testing and evaluation in connection with accredited verification agency, and preparation of dedicated agencies were derived to foster the equipment industry. Based on this, this study suggests a new technology certification system specialized for port equipment was established and a plan to institutionalize. In addition, in connection with the survey results and certification system, the basic functions and roles of the new technology testing and verification area was established. For future activation, incentives with effective certificates such as exemption of certification costs and issuance of performance confirmation certificates are needed, and efficient operation and management through dedicated organization and certification center were suggested.

  • PDF

Construction of Equipment for PV Module Manufacture and Temperature Characteristics of Laminator (태양전지 모듈 제조장치의 구성 및 Laminator의 온도 특성)

  • Kang, Gi-Hwan;So, Jung-Hun;Jung, Young-Seck;Jung, Myung-Woong;Yu, Gwon-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1376-1378
    • /
    • 2002
  • Compare and examined Full Auto Line of PV module Manufacture Equipment and PV module Manufacture Equipment in the Korea. Full Auto Line has been constructed with Cell Selection. Tabbing & Stringing. Module Setting, Lamination, Curing and Module Testing, and Module Manufacture Line in the Korea has been constructed with Tabbing & Stringing. Module Setting, Lamination and Module Testing. Laminator's temperature Control is the most important Variable in Manufacture of PV module. Temperature Transformation of Center part of PV module is most high at Lamination, and Edge part is most low.

  • PDF

Method And Mathematical Algorithm For Finding The Quasi-Optimal Purpose Plan

  • Piskunov, Stanislav;Yuriy, Rayisa;Shabelnyk, Tetiana;Kozyr, Anton;Bashynskyi, Kyrylo;Kovalev, Leonid;Piskunov, Mykola
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.2
    • /
    • pp.88-92
    • /
    • 2021
  • A method and a mathematical algorithm for finding a quasi-optimal assignment plan with rectangular efficiency matrices are proposed. The developed algorithm can significantly reduce the time and computer memory consumption for its implementation in comparison with optimal methods.

On-line Condition Monitoring for Electric Equipments (전력 설비 시스템의 온라인 감시)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.103-105
    • /
    • 2008
  • In, this paper, we consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PO) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PO testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PO measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

On-Line System for Partial Monitoring Discharge (온라인 부분방전 감시 시스템)

  • Choi, Yong-Sung;Hwang, Jong-Sun;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2114-2115
    • /
    • 2008
  • We consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers is described.

  • PDF