Kim, Jong-Kook;Cha, Jun-Tae;Lee, Jae-Chang;Chae, Young-Soo
Proceedings of the Korean Geotechical Society Conference
/
2010.03a
/
pp.1234-1242
/
2010
In this study, the effect of noise and vibration, and influence of ground improvement are evaluated and its application is analyzed through the example of SCP designed at ground improvement in Song-Do international city. consequently, it showes even comfortable result that it is about 5.0m of inner space, when the LVSCP method is applied, rather than that it is about 30m of inner space when the existing SCP is applied in vibration control standards 2.0mm/sec. In the noise, now that the many differences according to environmental factors like other equipment noise, limited space and so on at the time of the construction by LVSCP method are coming out, so we think that appro itate measures are needed according to surroundings. By the way, when it comes to the estimation of the ground improvement work before and after an improvement of LVSCP method, its result shows that it is satisfacttion to all the standards of compaction control in dregded and reclaimed ground and sedimentary clay layer.
Journal of the Korea Institute of Military Science and Technology
/
v.25
no.3
/
pp.311-320
/
2022
In this paper, we studied the optimal method of improving performance for aircraft having various variants within the same type. The study defined configuration of an entire fleet of aircraft being subject to a performance improvement program. And selected the most complicated aircraft configuration among them as a Standard Aircraft for modification by according to the proposed Aircraft Selection Process for developing an optimal Aircraft Performance Improvement Process. Based on the selected the Standard Aircraft, drew a system integration design result and carried out Evaluation Test and obtained Airworthiness Certification. Created the database with the design data of the Standard Aircraft, Evaluation Test, and Airworthiness Certification results, and applied it to variants of aircraft to complete the performance improvement program with optimized schedules and costs. By applying the proposed method to IFF performance improvement program, drew optimal system integration design and completed the program with minimized schedule.
Journal of Fisheries and Marine Sciences Education
/
v.18
no.2
/
pp.108-121
/
2006
The purpose of this study is to develop and to test the program for the improvement of preservice teachers' critical thinking ability. The main research problems to achieve the purpose of research are as follows; first, is the program for the improvement of preservice teachers' critical thinking ability effective to improve the critical thinking skills of preservice teachers? Second, is the program for the improvement of preservice teachers' critical thinking ability effective to improve the critical thinking dispositions of preservice teachers? To evaluate the effect of the program, 30(15; experimental group: 15; control group) sophomores were selected in Pusan. The conclusions of this research are as follows; first, there is a significant difference between experimental group and control group for critical thinking skills test. Second, there is no significant difference between experimental group and control group for critical thinking dispositions test.
Journal of Korean Society of Industrial and Systems Engineering
/
v.5
no.7
/
pp.43-48
/
1982
As the result of processing improvement of Telephone Dial by substituting. Synthetic Resin for metalic materials, improved characteristics of quality can be gained as follow. 1. By the improvement of structure and assembling of the Telephone Dial, the complex process of manufacture can be a simplified one, and at the same time the working process can be done in the form of assembly. 2. In the efficiency test of the Telephone Dial, the noise decreases by 5% compared with the first test. In the test of life and environment, it accords with the standard of the Ministry of Communications and its function betters. 3. By using synthetic resins instead of metalic materials the cost can be reduced by \340 than the first improvement and it also brings the heightend value.
Soil improvement by preloading with PVD in combination with vacuum is helpful when a considerable load is required to meet the desired rate of settlement in a relative short time. To facilitate the vacuum propagation, vertical drains are usually employed in conjunction. This ground improvement method is more and more applied in the Mekong delta of Vietnam to meet the needs of fast infrastructure development. This paper reports on a pilot test that was carried out to investigate the effect of ground improvement by vacuum and PVD on the rate of consolidation at the site of Saigon International Terminals Vietnam (SITV) in Ba Ria-Vung Tau Province, Viet Nam. Three main aspects of the test will be presented, and namely, instrumentation and field monitoring program, calculation of consolidation settlement and back-analysis of soil properties to see the difference before and after ground improvement.
Purpose: The work flow of international hospital's laboratory consists of rapid test and result report at the present day. However, the frequent inquiry of sample, which cause affairs to delay and efficiency to Lower, affects medical examination. In order to promote work's efficiency, we should improve the problem and make work smooth between a laboratory, outs and ward. Materials and Methods: This study runs as follows. First, Investigating test result, test schedule, test receipt, quick result, etc through the activity required from September to November 2007 about the inquiry of sample. After analysis of the problem in December, remaking the test schedule for improvement solution and reporting it to outs and ward. When the result is retest and dilution, we directly fill in a result space with the result situation of the patient to let them know beforehand. We also, prevent the omission of the result through checking the sample list and discriminate in vivo from in vitro by changing the laboratory's telephone number. We have improved the problem about the inquiry of sample through valuation and analysis since the improvement activity from January to March 2008. Result: The case about the frequent inquiry of sample has reduced by 57.8%. this improvement activity indicated that p-value<0.05 was statistically significant through paired t-test. This activity make study smooth and we rapidly report the result. Conclusion: By reducing the case regarding the inquiry of sample, work discontinuation, and concentration reduction, the work efficiency was increased.
Park, Jong Min;Cho, Seong Pill;Lim, Ta Young;Lee, Young ill
KEPCO Journal on Electric Power and Energy
/
v.2
no.1
/
pp.103-108
/
2016
Carbon Capture and Storage technologies are recognized as key solution to meet greenhouse gas emission standards to avoid climate change. Although MEA (monoethanolamine) is an effective amine solvent in $CO_2$ capture process, the application is limited by high energy consumption, i.e., reduction of 10% of efficiency of coal-fired power plants. Therefore the development of new solvent and improvement of $CO_2$ capture process are positively necessary. In this study, improvement of $CO_2$ capture process was investigated and applied to Test Bed for reducing energy consumption. Previously reported technologies were examined and prospective methods were determined by simulation. Among the prospective methods, four applicable methods were selected for applying to 0.1 MW Test Bed, such as change of packing material in absorption column, installing the Intercooling System to absorption column, installing Rich Amine Heater and remodeling of Amines Heat Exchanger. After the improvement construction of 0.1 MW Test Bed, the effects of each suggested method were evaluated by experimental results.
Proceedings of the Korean Geotechical Society Conference
/
2000.11a
/
pp.41-48
/
2000
Most land development projects and large scale civil works require a great amount of sand. And sand is also the most favorable material for soft ground improvement. The demand for sand is soaring rapidly due to increased number of projects regardless of its limited supply. Therefore, it is not difficult to predict that sand may become depleted and no longer be available as ground improvement material in the near future. Against this backdrop, developing an inexpensive sand-substitution material with an efficient accessibility will be necessary and urgently called for. So quick lime could be recommended as the substitutional material for sand. Quick lime is now preferred by forward developed nations. If Korea is able to take advantage of its abundant supply, economical efficiency could be achieved through massive production as well as being able to take advantage of utilization of natural resources. In this respect the purpose of this paper was to estimate improvement effect of soft ground though in-situ construction of quick lime pile. In-situ construction was peformed in road construction site of soft clay and in this study quick lime from Dan-yang that was estimated prominently in aspect of engineering characteristics was used. Quick lime piles were installed by 1.5m, 2.0m, 3.0m spacing to confirm improvement effect according to spacing and installed piles are 0.4m in diameter, up to 5m in length and the density of quick piles installed is 1.4 t/㎥. Vibrating wire pore water pressure cell was installed to confirm consolidation characteristics in surrounding of quick lime piles and both laboratory test and field test were carried out to confirm strength increase. In conclusion, soft ground improvement by quick lime piles was confirmed.
Purpose This paper attempts to identify items for improving the usage of PLM(Product Lifecycle Management) systems and suggests ways to prioritize improvement items on the basis of importance. It also tries to find out differences in the importance of improvement items due to the company size, the industry, the job, or the PLM solution. Design/methodology/approach Through a survey from participants to a PLM System Conference, data were collected from a sample of 181 users who had the previous experience in using a PLM system. In order to figure out the differences in the importance among user groups, the F-test with the Scheffe test as a post-hoc analysis was used in case of equal variances and the Welch test with the Dunnett T3 test was used in case of unequal variances. Findings This study sorted out 25 improvement ideas according to their importance assessed by the PLM system users. The top five ideas are improving data consistency, error minimization, fast system response time, enhancing user recognition, and business process improvement. The support group puts higher importance than the general user group in data consistency, fast system response time, enhancing user recognition, business process improvement, dedicated team for data consistency, continuous support from management, hardware performance upgrade, output linkage to other systems, and shortening problem solving duration. The largest company group attaches significantly higher weights than the smallest company group to data consistency, error minimization, fast system response time, business process improvement, dedicated team for data consistency, security with proper access management, output linkage to other systems, and better user interface.
Circuit testing process is very important in IC Manufacturing there are two ways in research for circuit testing improvement. These are ATPG Tool Design and Test simulation application. We are interested in how to use parallel technique such as one-side communication, parallel IO and dynamic Process with data partition for circuit testing improvement and we use one-side communication technique in this paper. The parallel ATPG Tool can reduce the test pattern sets of the circuit that is designed in laboratory for make sure that the fault is not occur. After that, we use result for parallel circuit test simulation to find fault between designed circuit and tested circuit. From the experiment, We use less execution time than non-parallel Process. And we can set more parameter for less test size. Previous experiment we can't do it because some parameter will affect much waste time. But in the research, if we use the best ATPG Tool can optimize to least test sets and parallel circuit testing application will not work. Because there are too little test set for circuit testing application. In this paper we use a standard sequential circuit of ISCAS89.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.