• 제목/요약/키워드: Test Set Construction

검색결과 309건 처리시간 0.028초

CGS를 잔골재로 활용하는 콘크리트의 응결시간 추정시 고무경도계 A타입 사용 가능성 분석 (Analysis of the Possibility of Using the Durometer A Type when Estimating the Specific Setting Time Using CGS for Fine Aggregate)

  • 이혁주;한준희;백승복;신용섭;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.116-117
    • /
    • 2019
  • In this research, Proctor insertion resistance test values and Durometer A type hardness values were compared and analyzed between the setting times of the concrete using CGS for Fine Aggregate, and the results are summarized as follows. 1) The Proctor penetration resistance test value and the hardness value of Durometer A type showed a high correlation in the form of a curve. 2) About surface finish The resolution exceeding the hardness value of the Durometer A type uses about 25 HD, and in the case of termination, about 35 HD, and is considered to be effective for determining the surface finishing work time. The possibility to do is expected.

  • PDF

건축용 비내력 경량벽체의 정적 수평하중저항성 시험방법의 표준화 (Standardization of Stiffness Test Method of Non-bearing Lightweight Wall for building)

  • 김진식;최수경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.185-186
    • /
    • 2015
  • The use of non-bearing lightweight wall has increased recently due to the increase of high-rise buildings and supply of long-life housing. Lightweight wall has advantages such as reducing the self-weight of the building, convenience in installation, and shortening construction period, however, must have a sufficient strength to external force. This study standardized the stiffness (static horizontal load resistance) test method for lightweight walls by using the actual impact load obtained through the load analysis test conducted in the previous studies. The size of specimen was set up as height 2.4m and width 3.0m. Test apparatus and test methods were referred to BS 5234-2:1992. However, the loading level applied to the specimen was divided into 3 steps (3000N, 1000N, 500N) that can be applied selectively depending on the purpose of the wall. The deformation characteristics according to the same loading level were vary depending on the specimen's type, and the evaluation criteria for functional damage may vary depending on the material, method of construction, and purpose of wall. Therefore, we did not suggest unified evaluation criteria of the stiffness to the test results.

  • PDF

건설장비 개발과정에서 신뢰성성장관리 적용방법에 대한 연구 (Application of Reliability Growth Management for Construction Equipment Development Process)

  • 소영국;전영록;류병진
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제13권3호
    • /
    • pp.175-190
    • /
    • 2013
  • This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.

Exact Activity Overlapping Method for Time-cost Tradeoff

  • Gwak, Han-Seong;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.109-110
    • /
    • 2015
  • This paper presents a computational method that identifies an exact set of optimal overlap rates between critical activities to meet job site specific needs by using rework cost-slope. The procedures to compute the exact solution are provided in peudocode algorithm. The method is coded into Exact Concurrent Construction Scheduling system that allows practitioners to make more informed decision in accordance with the site-specific condition involved in the overlapping of critical activities. Test cases verify the validity of the computational method and the usability of the system.

  • PDF

건축용 비내력 경량벽체의 내충격성 시험방법의 표준화 (Standardization of Impact Test Methods of Non-bearing Lightweight Wall for Building)

  • 김기준;최수경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.181-182
    • /
    • 2015
  • The use of non-bearing light weight wall has increased recently due to the increase of high-rise buildings and supply of long-life housing. Light weight wall has advantages such as reducing the self-weight of the building, convenience in installation, and shortening construction period, however, must have a sufficient strength to external force. This study standardized the impact resistance test method for light weight walls by using the actual impact load obtained through load analysis test in previous studies. The impact resistance test method was divided into the test method that uses soft body and the one that uses hard body. The size of specimen was set up as height 2.4m and width 3.0m. The size and shape of the body followed those used in BS 5234-2 and so on for the compatibility with the test method used overseas. The judgment criteria for impact resistance based on test results were not defined uniformly as the assessment of functional damage can vary depending on the type of material, structural method, purpose of wall, and so on even when the same impact load was applied.

  • PDF

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

현장 타설용 고분자 감쇠재의 탄성 계수를 측정하기 위한 실험 기법 (Dynamic Test method to Determine Modulus of Elasticity of Sound Insulating Coat)

  • 이맘 딘베루 몰라;이종구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2015
  • The main purpose of this paper is to present the dynamic test method developed for measuring the elastic modulus of sound insulating coat. The test setup was devised based on the theoretical natural frequency of a simply-supported beam subject to free transverse vibration. A stainless steel beam was tested and the result showed a good compliance with the standard value listed in literatures. The result indicates that the test set up can serve as a quick, economical and suitable scheme to test non self-supporting materials.

  • PDF

Developing the Optimized Method of Reliability-Growth Target Setting for Complex and Repairable Products from Business View

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제15권4호
    • /
    • pp.248-255
    • /
    • 2015
  • Purpose : The purpose of this research is to develop the optimized method and process in the reliability-growth target setting, especially for complex and repairable system (or products) such as vehicle and airplane, construction equipment. Method : A reliability-growth test plan specifies a scenario to achieve the planned reliability value (or reliability target). The major elements in test planning are reliability-growth starting time and reliability level at that time, reliability-growth rate and reliability-growth target. All of them except a reliability target can be referred to the previous development data and reference researches. The reliability target level is directly influencing to test period (or time) which is related to test and warranty cost together. There are a few researches about the reliability target setting method and but showing the limitations to consider the views of engineering, business and customer together. There is no research how to handle the target setting process in detail. Result : We develop the optimized method and systematic process in reliability target setting with considering such views. This research also establish the new concept as production capability which means company (or supplier) capability to product its products. Conclusion : In this research result, we apply the new method to a few projects and can set the reasonable test planning. The developing results is showing the good balance between the developing cost and warranty cost at market.

터널 순응휘도와 경계부 휘도의 관계 연구 (Relationship between Adaptation Luminance and Threshold Zone Luminance for Vehicular Traffic Tunnels)

  • 조원범;정준화
    • 한국도로학회논문집
    • /
    • 제16권3호
    • /
    • pp.85-99
    • /
    • 2014
  • PURPOSES : This study has been performed with the objective to determine threshold zone luminance of adaptation luminance by target safety level in a vehicular traffic tunnel with design speed set at 100km/h. METHODS : The study made a miniature capable of portraying changes in luminance distribution within $2{\times}10^{\circ}$ conical field of view of the driver approaching to the tunnel for the test. Test conditions were set based on justifications for CIE 88-1990's threshold zone luminance used as a reference by domestic tunnel light standards (KS C 3703 : 2010). Luminance contrast of object background and object is 23%, object presentation duration is 0.5 seconds, and size of the object background is $7.3{\times}11.5m^2$ RESULTS : Threshold zone luminance was set within adaptation luminance of $100{\sim}3,000cd/m^2$. Adaptation luminance and threshold zone luminance based on 50%, 75% and 90% target safety level all showed a relatively high linear relationship. According to findings in the study, it is not appropriate to specify the relationship between adaptation luminance and threshold zone luminance as luminance ratio. Rather, direct utilization of the linear relationship gained from the study findings appears to be the better solution. CONCLUSIONS : Findings of this study may be used to determine operation of threshold zone luminance based on target safety level. However, a proper verification and validity of test results are required. Furthermore, a study to determine proper threshold zone luminance level considering target safety level reviewed in this study and various decision-making factors such as economic conditions in Korea and energy-related policies should be carried out in addition. Additional tests on adaptation luminance greater than $3,000cd/m^2$ will be performed, through which application scope of the test findings will be broadened.

구속 링형 시험에 의한 PP섬유 혼입 콘크리트의 폭렬 특성 평가 (Evaluation on Spalling Properties of Polypropylene Fiber reinforced Concrete by Restrained Ring-type Test)

  • 한철환;김규용;윤민호;황의철;백재욱;남정수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.124-125
    • /
    • 2017
  • In this study, the spalling properties of Polypropylene reinforced concrete were evaluated by the restrained ring-type test. As a result of the experiment with the fiber mixture ratio set at 0, 0.15 vol.%, The PP fiber reinforced specimen showed lower water vapor pressure as a whole than the Plain specimen, but the restraint stress was measured to be higher. This is thought to be due to the fact that higher thermal stresses were applied in the PP fiber reinforced test specimen.

  • PDF