• Title/Summary/Keyword: Term of Lease

Search Result 35, Processing Time 0.021 seconds

A Study For An Improved BTL Project Delivery Method (BTL 사업주체별 문제분석과 해결방안에 관한 연구)

  • Kim, Chang-Duk;Park, Hye-Sin;Lee, Mun-Jae;Yu, Jeong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.53-63
    • /
    • 2006
  • Since 2005, the government began to introduce and promote a new project delivery system, BTL(Build, Transfer, and Lease), in order to provide high level of public services for the upgraded quality of life and to boost the domestic and local construction economy. However, the lack of experiences in the new system by the constituents from diverse economic sectors brought a number of drawbacks from each constituent's perspective such as improperly low earning rate, excessive expenses for preparation of the project proposal, imbalanced regulations, heavy cost and procedures to establish SPC, the ineffective structure of the consortium, the short-term oriented evaluation criteria for the selection and so forth. These drawbacks turned out to be obstacles for the successful BTL projects. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the changes to resolve those for the improvement and finally to deliver the successful BTL projects for the diverse public owners.

Study on Operating System Improvements to the Competitiveness of Busan Port (부산항 경쟁력 강화를 위한 운영체제 개선에 관한 연구)

  • Seo, Su-Wan
    • Journal of Korea Port Economic Association
    • /
    • v.34 no.4
    • /
    • pp.191-208
    • /
    • 2018
  • This paper focuses on the integration aspect of operators to determine an improvement strategy for the operating system to enhance competitiveness of Busan Port. This Study proposes the following alternatives: valuation standards for the integration of operators, the road map for the integration period, the scope and role setting of integrated operators' participation of Busan Port Authority(BPA), and the separation and linkage North Port and the New Port operators. First, the valuation standards for operator integration should be based on international standards. Additionally quantitative factors such as financial situation, business performance and participating companies' profitability, and the qualitative factors such as management ability, technology, and labor relations should be considered. Second, the timing of North Port's operator integration should be prioritized in the short term in conjunction with the commencement of its phase 2-4, 2-5, and 2-6. The integration of New Port operators should provide a road map for a relatively long-term perspective. Third, the participation of BPA' integrated operators should be considered in terms of publicity as a policy coordinator between terminals and by pursuing the profitability of entering into overseas business by fostering Korean global terminal operators. The scope and role of participation ensures that the experience and technology of the terminal operation business is maximized. Fourth, because physically intergrating the North Port' operator into a single corporate form is difficult, initially establishing a special purpose company to maximize the effect of the integrated operation is necessary. Then, the operators decided to convert to a holding company given the termination of the lease term contract with the State or BPA, and ultimately proposed a merger into a single corporation.

Questionnaire Survey on the Proposed Amendments to the Corporate Tax Law in Alignment with the Full Adoption of the International Financial Reporting Standards in Korea (국제회계기준 도입에 따른 법인세법 개정방향 -재정부 발표 개정안에 대한 세무사 대상 설문조사-)

  • Jang, Ji-Kyung
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.10
    • /
    • pp.334-350
    • /
    • 2010
  • This study aims at investigating the possible effects on the tax accounting practices stemming from adopting the IFRS in financial reporting process. It also seeks for policy implications to help alleviate practical conflicts likely to arise from the inconsistencies between the existing tax law and the tax related IFRS provisions. The results of the survey analysis are summarized as follows: firstly, majority opinion is opposed to the fair value based revaluation of property assets as well as the application of immediate recognition of foreign currency translation gains/losses. It favors the existing provision on asset securitization which adopts sales transaction view. Secondly, most of the respondents oppose the proposed amendments which allows dual classification of lease contracts on the ground. Third, functional currency appears acceptable on a conceptual level, even though a deep concern is expressed regarding the practical feasibility of computing taxable income using financial statements translated on the basis of functional currency on a practical viewpoint. Fourth, many respondents support the existing convention of recognizing depreciation expenses for taxation purposes and are in favor of the separation of accounting and tax books on a long-term basis. Fifth, the majority opinion approves the maintenance of existing tax reconciliation system and the recognition of expenses related with the doubtful accounts on reporting basis. Finally, a concern is raised with regard to the added burden of practical job loads needed to comply with the proposed amendments.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.