• Title/Summary/Keyword: Temporary road

Search Result 42, Processing Time 0.023 seconds

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.

Analytical testing and evaluation of truss typed structures for tunnel maintenance

  • Lee, Dongkyu;Kim, Dohwan;Lee, Jaehong;Noh, Pilsung;Park, Sungsoo
    • Smart Structures and Systems
    • /
    • v.15 no.4
    • /
    • pp.949-961
    • /
    • 2015
  • The goal of this study is to present numerical modeling and analytical testing in order to evaluate an innovative space truss typed temporary structure, which is used to maintenance and repair of road tunnels. The present space truss structure has merits to use UL-700 high strength steel tube as members and to carry out maintenance and repair works of road tunnels without blocking cars and transportations. Numerical modeling and analytical testing of the space truss are investigated by using commercial engineering software, i.e., ABAQUS 6.5-1, and then it is verified that the truss structure has both structural safety and effective function for maintenances and repairs of road tunnels.

Structural Behaviour of Composite Rigmats with Snap-fit connection (가도용 착탈조립식 복합소재 리그매트의 구조거동 분석)

  • Lee, Sung-Woo;Hong, Kee-Jeung;Cho, Nam-Hoon;Kim, In-Tai
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.533-538
    • /
    • 2007
  • Since glass-fiber reinforced composite decks have high-strength, light-weight and high durability, many researches on the composite decks for bridges are currently performed and many composite decks are developed. Some of the developed composite decks can be applied as rigmats for temporary roads such as oil developing temporary roads. In this paper, a composite deck for rigmat is developed and studied. Structural behavior of the developed composite deck for rigmat is verified by both analysis and experiment.

  • PDF

A Study on the Fundamental Performance of a Lego Block System for Road Recovery (도로복구를 위한 레고식 차도블록 시스템의 기초성능에 관한 연구)

  • Lim, Sunwoo
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.191-198
    • /
    • 2017
  • Lego block system forms a temporary pavement area using the assembled structure block in the road excavation work for the maintenance and installation of facilities. This system was developed for a safe passage of vehicles and pedestrians. A study on the fundamental performance of a lego block system was performed through material quality, sliding resistance and compression tests. And compaction performance of ground on the road was reviewed and evaluated through field tests. As a result, a lego block system for road recovery showed the excellent performance and compaction effect.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

A Pilot Test for the Utilization of Road Subsoil of the Tertiary Mudstone in Pohang Basin (포항분지 제3기 이암의 도로 노체 활용을 위한 현장시험)

  • Gong, Jeong-Sik;Baek, In-Woo;Kim, Jae-Gon;Song, Young-Suk;Kim, Tae-Hyung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.3
    • /
    • pp.1-10
    • /
    • 2021
  • The purpose of this study is to present the possibility a utilization of the tertiary mudstone in Pohang as road subsoil material through pilot experiments on the road embankment structure. This mudstone is an unconsolidated rock that is distributed in the soft rock sedimentary layer, the tertiary layer of the Cenozoic, and causes physical problems such as slaking, swelling, and reduced shear strength and chemical problem like acid drainage. In order to solve various complex problems, an laboratory mixing test was conducted, and the optimal mixing conditions of the tertiary mudstone (90%), composite slag (steel making 70%, blast furnace 30%), and neutralization and coating agent treatment were derived. In order to prove its utilization, a real-scale road embankment structure was constructed and tests were conducted for each section. The pre-processing section is stable due to the design of optimal mixing conditions, while in post-processing section, natural weathering proceeded rapidly, and structural problems were concerned. Since the effect of neutralizing and coating agents was confirmed in temporary-staking section, the neutralizing and coating agents can be applied during the temporary storage period.

A New Link-Based Single Tree Building Algorithm for Shortest Path Searching in an Urban Road Transportation Network

  • Suhng, Byung Munn;Lee, Wangheon
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.889-898
    • /
    • 2013
  • The shortest-path searching algorithm must not only find a global solution to the destination, but also solve a turn penalty problem (TPP) in an urban road transportation network (URTN). Although the Dijkstra algorithm (DA) as a representative node-based algorithm secures a global solution to the shortest path search (SPS) in the URTN by visiting all the possible paths to the destination, the DA does not solve the TPP and the slow execution speed problem (SEP) because it must search for the temporary minimum cost node. Potts and Oliver solved the TPP by modifying the visiting unit from a node to the link type of a tree-building algorithm like the DA. The Multi Tree Building Algorithm (MTBA), classified as a representative Link Based Algorithm (LBA), does not extricate the SEP because the MTBA must search many of the origin and destination links as well as the candidate links in order to find the SPS. In this paper, we propose a new Link-Based Single Tree Building Algorithm in order to reduce the SEP of the MTBA by applying the breaking rule to the LBA and also prove its usefulness by comparing the proposed with other algorithms such as the node-based DA and the link-based MTBA for the error rates and execution speeds.

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.