• Title/Summary/Keyword: Temporary construction

Search Result 502, Processing Time 0.032 seconds

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

A Study on Structural Performance by Condition Grade of Temporary Equipment (가설기자재 상태등급별 구조성능에 관한 연구)

  • Moon, Seong-Oh;Mo, Seung-Un;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

Study on the Safety Assurance for the Temporary Structures (가설구조물 안전성 확보 방안 연구)

  • Lee, Jung Seok;Moon, Seong Oh;Youn, Ye Bin;Lim, Nam Gi;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.73-80
    • /
    • 2018
  • According to the statistics publication of KOSHA, more than half of serious accidents at the construction sites were related to the temporary works and/or the temporary structures such as scaffoldings, shores, earth retaining walls, etc. The structural failures are occurred because of the overload acting on the structures or lack of performance of the one or more members of the structures. For the prevention of the collapse accidents relating to the temporary structures at the construction sites, we have to control construction processes not to occur the overload and also to control the performance and quality of each member of the temporary structures. MOLIT has amended the "Construction Technology Promotion Act" on Jan. 7th, 2015 to ensure the structural safety of the temporary structures. According to the Act, the designers of the construction design projects should check the structural integrity of the structures including the temporary structures and the construction companies have to let 'the Relative Professionals' confirm the structural integrity of temporary structures, the shores(${\geq}5m$ high) and the scaffolds(${\geq}31m$ high), before construction. Also, MOLIT has amended the "Regulation for Construction Technology Promotion Act" on Jul. 4th, 2016 for quality management and testing of temporary equipments. According th this regulation, the construction companies and supervisors should manage and test the temporary equipments before using them. In this paper, the standard drawings of the shores(< 5 m high) and the scaffolds(< 31 m high) and the amended "Business Guideline for Quality Management of Construction Work" are presented. As the result of this study, MOLIT noticed the amended "Business Guideline for Quality Management of Construction Work" on Jul. 1st, 2017.

A Study on the Prevention Counterplan of Construction Accident by the Temporary Work Material (가설재에 의한 건설 중대재해 예방대책에 관한 연구)

  • 최석부;고성석
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1997.11a
    • /
    • pp.157-164
    • /
    • 1997
  • Construction accident happens all of the process in work and contains materials types of causes. Especially, temporary work material in the great problem in industrial accident. Because temporary work In essential to build the main structure. The most frequent type of accident by the temporary work is the falling and so on. Its causes were the failure of scaffolding, imperfection of temporary material etc. These accident properties the Primitive and repetitive accident. The prevention counterplan of construction accident by temporary material work in need to protect worker and make more safer construction site. Therefore in this paper analyzed of the serious accident of construction by the temporary work material and present reasonable solution method to reduce the construction accident by the temporary work material.

  • PDF

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Ensuring safety of temporary structures through on-site real-time structural analysis Construction Sites (가설구조물 구조검토의 실시간 현장 반영을 통한 안전성 확보)

  • Mo, Seung-Un;Moon, Seong Oh
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.19-20
    • /
    • 2022
  • Based on the survey analysis of safety accidents at construction sites that occur every year, most of them are caused by temporary structures. While analyzing in detail, it is confirmed that the main factors for such accidents are the quality problem of temporary equipment, unstable construction, and arbitrary change. As temporary structure is installed only for the construction of main structure, the reality is that no attention is paid to the construction of temporary structures.

  • PDF

Acoustic Properties of Temporary Noise Barriers on Construction Site (건설공사장 가설방음벽의 음향 특성)

  • Chung, Jin-Yun;Im, Jung-Bin;Lee, Sung-Chan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.20 no.2
    • /
    • pp.191-198
    • /
    • 2010
  • The noise by the construction activities is one of the main issues in Korea. To prevent the noise from construction site, construction company installs temporary noise barriers along the construction site boundary. Normally sound insulation performance ($R_w$) of the temporary noise barriers made by metal or plastic is between 18 and 31 dB and metallic noise barriers are around 5 dB higher than plastic noise barriers. Sound absorption performance (NRC) of the temporary noise barriers are between 0.20 and 0.59 so it's difficult to characterize their acoustic performance. In this study, it has founded that sound insulation performance of the temporary noise barrier has been improved about 3dB by stick the high density acoustic sheet and insertion loss of noise barrier is getting increased as the source and receiver approached the temporary noise barriers.

Building Information Modeling for Temporary Structure Planning and Safety Analysis (BIM을 활용한 가설물 계획 및 안전 관리)

  • Kim, Kyungki;Cho, Yong Kwon;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.12-18
    • /
    • 2016
  • The entire construction safety is significantly influenced by proper uses of temporary structures. However, in current practices, temporary structures are used without sufficient planning and analysis on their impact on safety. Consequently, problems in worker safety and loss of productivity are frequently caused related to temporary structures. This paper introduces an approach that uses Building Information Modeling (BIM) to automatically create temporary structures as part of construction plans and identifies potential safety hazards related to the temporary structures. In this study, the type of temporary structure is limited to scaffolding. Automation algorithms were developed and applied to (1) analyze daily construction site conditions (2) create required scaffolding objects, and (3) identify potential safety hazards related to scaffolding. A case study using a real-world construction project demonstrated that scaffolding objects were properly created based on user-input and potential safety hazards were successfully identified without human intervention.