• Title/Summary/Keyword: Temporary bridge

Search Result 89, Processing Time 0.028 seconds

The Design and Construction of the Anchorage of Yi Sun-Sin Grand Bridge (이순신대교 앵커리지 설계-시공사례)

  • An, Ik-Kyun;Kim, Kyung-Taek;Seo, Young-Hwa
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.14-25
    • /
    • 2010
  • The Yi Sun-Sin grand bridge is the suspension bridge which connects Myodo and Gwangyang. It is over the main navigation channel of Gwangyang Harbor. South anchorage(AN1, Myodo side) of the bridge is designed as rock anchored type. It sustains using the resistance of the underground rock's mass in Myodo. As this type of anchorage can minimize the exposure of the structure, It is economically efficient and environmentally friendly. North anchorage (AN2, Gwangyang side) is designed as the gravity type. This anchorage is 68 meters in diameter and use its own weight to support. Instead of normal rectangular diaphragm wall, the circular shape diaphragm wall is adopted to the north anchorage. It doesn't need to use internal temporary facilities, so it can significantly improve the constructability of the structure.

  • PDF

USER-DEFINED PROPERTY SETS-BASED IFC EXTENSION FOR BRIDGE APPLICATION INFORMATION MODEL

  • Sang-Ho Lee;Sang Il Park;Munsu Yang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.433-436
    • /
    • 2013
  • This study suggests IFC-based bridge information modeling methods and its application model in BIM environment. Data model extension for bridge structure was achieved using user-defined property sets based on IFC framework. First, identification information was added. Bridge members are identified through physical and spatial semantic information added as property sets. Instances for semantic information were assigned according to standardized rules. Second, CO2 related factors were added for application information model. It can play a role to calculate and manage the quantity of CO2 emission. Third, properties for temporary structure to estimate and manage the construction cost were added. Finally, we investigated proposed methods through implementing the application information model of bridges.

  • PDF

Analysis of Temporary Housing for the Displaced People in Rural Area Emergencies (농촌지역 이재민 임시주거시설 지정 현황 및 개선 방안)

  • Lim, Changsu;Lee, Seung-chul;Kim, Eun-Ja;Park, Mi-Jung
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.4
    • /
    • pp.413-421
    • /
    • 2017
  • This study intends to conduct a thorough research and analysis on the designated temporary residential facilities for the disaster victims in order to bridge the gap between the temporary residential facilities for the disaster victims in country and city, and understand the current status of the designated temporary residential facilities for the disaster victims in rural and urban areas. As a result, the designated temporary residential facilities for the disaster victims in urban areas are bigger and have higher capacity, implying the necessity to designate facilities in rural areas that can accommodate larger number of people. As to the analysis of the representative temporary residential facilities for the disaster victims in rural areas, different regions had different types of designated facilities and the number of facilities also showed big difference depending on regions. So it is believed that local governments should improve the process and system of designating temporary residential facilities for the disaster victims.

Basic study about Geometric feasibility Analysis of the System form for the Bridge Slab (교량 상판 콘크리트 타설용 거푸집 시스템의 기하학적 타당성 분석의 기초연구)

  • Sung, Soojin;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.197-198
    • /
    • 2014
  • The concrete work of bridge decks is performed in a high place, which may reduce safety and productivity. In addition, the conventional method for deck forms require a great deal of manpower, and a form (sheathing) board is damaged when removed after curing. As a result, the concrete deck work of bridge construction becomes the cause of delayed construction and increased cost. To solve these problems, SMART form, a system form, is developed. SMART form is a temporary device for easier installation and removal, by mounting it to the lower flange of a bridge girder and using a mechanical behavior of the form system for deck concrete pouring. For stable installation and removal of the developed SMART form, geometric behaviors should be analyzed to prove its validity. Furthermore, the validity of geometric behaviors when the SMART form size is altered in response to the various arrangement of bridge girders should be proved. Thus, the study is intended to analyze the geometric validity of the form system for bridge deck concrete pouring. The structural stability of the form system for bridge deck concrete pouring can be secured, which will be applied in the field.

  • PDF

Safety Evaluation of a Bridge Using Round Piles Connected Laterally to Each Other (원형강 파일이 횡방향 상호 연결된 가설교량의 안전성 평가)

  • Kim, Yong-On;Paik, Shin-Won
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.98-106
    • /
    • 2006
  • The substructure of temporary bridges used during the construction period of main bridges needs to be simple and strong at the same time so that it doesn't block running water. When the water flow is hindered by sub-structure of the bridges, as it happens when H beams with bracing are used, either the water floods or the bridge gets damaged. Therefore, using round beams for the substructure and connect them together is a preventive choice considering the intensive raining in the summer. The bridges using round beams for the substructure have also benefited by fast construction because of fewer bracing and in-situ welding. Because the round-pile-connecting method is relatively new, the safety evaluation of the constructed bridge is an essential procedure before being used in the field. The field evaluation of a bridge including the vehicle loading test and moving load analysis has been conducted and the results showed the safety requirement is satisfied.

Numerical Analysis on Posterior Prosthesis of Implant Temporary Teeth Combination Bridge (임플란트 임시치아 결합형 브리지의 구치부 보철물에 대한 수치해석)

  • Seo, Kyung-Hyo;Lee, Chi-Woo;Moon, Byung-Cheol
    • Journal of Power System Engineering
    • /
    • v.18 no.5
    • /
    • pp.60-65
    • /
    • 2014
  • This research examined an immediate loading capable of providing a masticatory function and financial affordability while satisfying every requirement of a useful immediate loading. In this research, numerical value analysis was performed on couple-type posterior teeth implants developed by making up for the problems of extant implants. As a result of examining the effects of external impacts on extant implants and their deformation, relatively lager deformations separated from a molar were found concerning molar deformation implant with the maximum deformation level being approximately 1.657mm. In this research, the improved implant showed much improvement in terms of impact analysis in its deformation dispersion status after unloading the impulsive load from a punch. As for the case of hepf, about 1.657mm occurred but the improved model showed about 0.9217mm, exhibiting 55.6% advancement.

Requirement Analysis of the System Form for the Bridge Slab (교량 상판(바닥판) 콘크리트 타설용 시스템 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.195-196
    • /
    • 2014
  • Unlike general construction works, bridge construction is mostly done in a high place. The conventional deck form of bridge is installed between precast concrete girders using sleepers, bridging joints and plywoods, and after concrete is poured to the deck, the form materials are removed at high altitudes. When removing the form, it may be dropped on ground, damaging the materials and resulting in economic loss. In addition, safety accidents are likely as the works are performed in a high place, and as the manpower increases, the cost increases. Also, it is difficult to install and remove temporary equipment. Therefore, it is required to develop a system form that allows easier and quicker installation and removal by unskilled workers and ensures safety of workers. In this regard, the study is intended to analyze requirements for the system form for pouring concrete to bridge decks, which can be easily installed and removed. The study result will be used as basic information for development of the system form for pouring concrete to bridge decks.

  • PDF

Behavior of Main Girder in Continuous Girder System using Cross Girder Method (가로거더공법에서 주형의 연속화 시점에 따른 주형의 거동)

  • Park, Jeong-Ung;Seo, Won-Ju;Lee, Son-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.533-536
    • /
    • 2008
  • It is on increasing trend to employ H-rolled beams as main flexural members of bridges and of temporary structures owing to their handiness for construction, maintenance, and management. But in the case of applying H-rolled beams to bridges, maximum length of bridge span is around 20m. Therefore, to develop simplified steel-concrete composite bridge having long span using H-rolled beam needs new cross girder system at internal supports, optimization of bridge system without cross beams between supports and steel-concrete composite bridge deck. This study performs mechanical analysis of cross girder system for H-rolled beam steel-concrete composite bridge with long span and verifies its usefulness.

  • PDF

Experimentally Evaluating Fatigue Behavior of Corroded Steels Exposed in Atmospheric Environments (대기환경하에서 장기간 사용된 부식강재의 실험적 피로거동평가)

  • Mun, Jae Min;Jeong, Young Soo;Jeon, Je Hyeong;Ahn, Jin Hee;Kim, In Tae
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.3
    • /
    • pp.193-204
    • /
    • 2017
  • Fatigue strength of temporary steels and painted structural steels corroded under outdoor atmospheric environments is not clear. In this study, fatigue tests were carried out on steel plates which were cut off from 7-year-old temporary structural member under subway construction environment and from 75-year-old Yeongdo bridge member under marine atmospheric environment. After removing corrosion production on the steel surface, 3-dimensional surface geometry of the corroded steel was measured at intervals of $1.0{\times}1.0mm$, and corrosion characteristics such as minimum, maximum and mean values of residual thicknesses were calculated. From the fatigue test and FEM analysis results, the relationship between corrosion characteristics and fatigue behavior was presented, and change in fatigue strength of the unpainted and painted steels corroded in outdoor environments was also presented.

A Study on the Application of 3D Digital Technology for Fashion Design (3D 디지털 기술을 활용한 패션 디자인 개발에 관한 연구)

  • Kim, Ji-Eon
    • Journal of the Korean Society of Costume
    • /
    • v.57 no.2 s.111
    • /
    • pp.45-58
    • /
    • 2007
  • This study shows that clothes are made just the same as the real thing in the virtual space through 3D digital technology. This study is significant to expand the area of fashion design in the virtual space. This study analyzes the practical use of the third dimension computer graphics in the aspect of fashion, and it is proposed the 3D fashion design simulation in the virtual space used on 3D studio max, poser, photoshop program according to fashion design process. The main design concept is "temporary bridge" from rainbow. "Temporary bridge" is a rainbow bridge which connects nature, man and technology, and also the past, present, and future. This study is supposed six fashion design in accordance with three sub-theme under main concept by changing rotor and texture used on 3D simulation. The conclusion are as follows : First fashion design process, which consists of design conceptualization, design definition, and computer design process, composed of body modeling, clothing modeling, texture mapping, rendering by lighting and camera establishing are compared. Second, fashion design process is applied to digital technology. Third, the method of body modeling is both that of direct modeling in 3D Studio Max and that of importing DXF file from poser. And the method of direct clothing modeling in 3D Studio Max are two methods, polygon modeling and nurbs modeling. Polygon modeling is more satisfied than nurbs modeling in the aspect of expression to clothing and round face. Forth, this study applies textures and colors transformed by photoshop on manufactured 3D Clothes. According to this result, fashion designers are able to confirm a customer or client in their design minds viewing 3D simulation by various textures. colors and angles. It is able to advance digital fashion show in the future.