Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Technique for Bridge Bearing Retrofit Using Wedge-Jack (교좌장치 겸용 웨지잭을 이용한 교좌장치 보수공법)

  • 백동명;유문식;임진석
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.837-843
    • /
    • 1999
  • A common hydraulic jack using brdige retrofit has a problem of increasing cost and time of construction to construct additionally temporary bent or concrete bracket, in case of insufficiency work space and release hydraulic pressure. To solve the problem, this technique is developed to alternate the bridge bearing in adequate inspection condition. After control maximum lift-height and minimum lift-force of no damage to super structure, the constructive technique is to alternate and repair the bridge bearing using the wedge jack with bridge bearing ability that is no release hydraulic pressure stopper, and able to reuse separable cylinder.

  • PDF

The Case Study on the Erection Construction Method for Soft Retractable Roof Structures (연성개폐 지붕구조물 Erection 시공법에 관한 사례 연구)

  • Park, Keum-Sung;Kim, Hyung-Do;Kwak, Myong-Keun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.101-108
    • /
    • 2016
  • Lifting plan in the large spacial structure is an important factor influencing the efficiency and economy of the construction process. The purpose of this study was deriving the requirements for lifting techniques as the basic research in the double spoke wheel roof structure construction. In the lift up erection method, management plan of the interference error in the column and outer-ring was needed that occur during lifting roof structure. In the bent erection method, material usage reduction plan was required by the structural design of the temporary bent. In the hybrid erection method, lifting plan was needed that minimizes weather condition and crane usage. All lifting techniques were required Value Engineering model for reduction of cost and construction period.

Role of residual ferrites on crevice SCC of austenitic stainless steels in PWR water with high-dissolved oxygen

  • Sinjlawi, Abdullah;Chen, Junjie;Kim, Ho-Sub;Lee, Hyeon Bae;Jang, Changheui;Lee, Sanghoon
    • Nuclear Engineering and Technology
    • /
    • v.52 no.11
    • /
    • pp.2552-2564
    • /
    • 2020
  • The crevice stress corrosion cracking (SCC) susceptibility of austenitic stainless steels was evaluated in simulated pressurized water reactor (PWR) environments. To simulate the abnormal condition in temporary clamping devices on leaking small bore pipes, crevice bent beam (CBB) tests were performed in the oxygenated as well as hydrogenated conditions. No SCC cracks were found for SS316 in both conditions. SS304 also showed good resistance in the hydrogenated condition. However, all SS304 specimens showed SCC cracks in the oxygenated condition, indicating poor crevice SCC resistance. It was found that residual ferrites were selectively dissolved because of the galvanic corrosion coupled with the neigh-bouring austenite phase, resulting in SCC initiation in SS304. Crack morphologies were mostly transgranular assisted by the damaged δ-ferrite and deformation-induced slip bands.

Behavior and Improvement of Construction Crack occurred on Anchorage of PSC-edge Girder Rahmen Bridge (PSC-Edge 거더 라멘교의 정착부에 발생한 시공 균열 거동과 개선)

  • Ok, Jae-Ho;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.569-576
    • /
    • 2019
  • PSC-Edge Rahmen Bridge makes low thickness and long span by introducing prestressed force to the edge girder and reducing positive moment. In the bridge, diagonal tension cracks occurred in the direction of $45^{\circ}$ to outer side of the girder after the temporary bent supported on the lower part of the upper slab and the secondary strand is tensioned on the girder. Researches on stress distribution and burst crack behavior of pre-stress anchorage has been conducted, it is difficult to analyze an obvious cause due to difference between actual shape and boundary condition. This study performed 3D frame analysis with additional boundary condition of temporary bent, the maximum compression stress occurred in the girder and there was a limit to identify the cause. It performed 3D Solid analysis with LUSAS 16.1 and the maximum principal tensile stress occurred at the boundary between the girder and the slab. As analyzing required reinforcement quantity at obtuse angle of the girder with the maximum principal tensile stress and directional cosine, reinforcement quantity was insufficient. Additional bridges have increased reinforcement quantity and extended area and crack was not occurred. It is expected that cracks on the girder during construction could be controlled by applying the proposed method to PSC-Edge Rahmen Bridge.