• 제목/요약/키워드: Temporary Piers

검색결과 6건 처리시간 0.019초

압축과 휨을 동시에 받는 가교량 주요부재의 좌굴설계 (Buckling Design of Temporary Bridges Subjected to Both Bending and Compression)

  • 소병훈;경용수;방진환;김문영
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2006년도 정기 학술대회 논문집
    • /
    • pp.977-984
    • /
    • 2006
  • Generally main girders and steel piers of temporary bridges form the steel rahmen structure. In this study, the rational stability design procedure for main members of temporary bridges is presented using 3D system buckling analysis and second-order elastic analysis. 2 types of temporary bridges, which are possible to be designed and fabricated in reality, are chosen and the buckling design for them is performed considering load combinations of dead and live loads, thermal load, and wind load. Effective buckling length of steel piers, effects of live loads on effective length of main members, transition of ~id buckling modes, and effects of second-order analysis are investigated through case study of 2 temporary bridges.

  • PDF

시스템좌굴 해석법을 이용한 라멘형가교 주요부재의 좌굴설계에 관한 사례 연구 (Case Study for Buckling Design of Temporary Bridges using System Buckling Analysis)

  • 경용수;소병훈;방진환;김문영
    • 한국강구조학회 논문집
    • /
    • 제19권1호
    • /
    • pp.87-98
    • /
    • 2007
  • 일반적으로 가교량은 주형와 강재교각이 강결 연결된 강재 라멘구조를 형성하고 있다. 강재 라멘구조의 경우, 작용하는 하중에 의해 축력 및 휨을 받는 부재/축력 및 휨을 동시에 받는 부재가 발생한다. 본 연구에서는 이러한 부재에 대해서 시스템 좌굴해석을 통하여 가교량 주요부재의 유효길이를 산정하고 이를 이용하여 안정성 해석을 수행한다. 이를 위하여 실제 설계/시공될 수 있는 가교의 6가지 유형을 선택하고, 고정하중, 온도하중 그리고, 활하중조합에 대한 3차원 좌굴설계를 실시한다. 결과적으로 6가지 가교에 대한 사례연구를 통하여 주형 및 교각부의 유효길이 산정법, 3차원 좌굴모드에 대한 고찰, 그리고 2차해석의 효용을 조사한다.

가 지지점을 이용한 프리스트레스된 강재 라멘식 보도육교의 개발 (Development of Prestressed Steel Frame Overpass using Temporary Piers)

  • 공병승;황원섭;박영제
    • 한국강구조학회 논문집
    • /
    • 제10권4호통권37호
    • /
    • pp.565-575
    • /
    • 1998
  • 본 연구는 가 지지점을 이용한 프리스트레스된 강재 라멘식 보도육교를 설계하고 시공하는 전반적인 과정을 제시하였다. 설계의 자동화를 위하여 전산 프로그램을 개발하였으며 지간별로 매개변수 연구를 수행하여 적절한 단면을 제시하였고 이를 기존의 강재 단순보형 보도육교와 형고 및 강재량 면에서 비교하였다. 지간장 $20{\sim}45m$에 대한 연구결과, 주형고의 경우에는 $26{\sim}48%$, 강재량의 경우에는 $25{\sim}34%$의 재료 절감 효과를 나타내었으며. 지간장이 클수록 절감 효과가 큰 것으로 분석되었다.

  • PDF

Concrete arch bridges built by lattice cantilevers

  • Granata, Michele Fabio;Margiotta, Piercarlo;Recupero, Antonino;Arici, Marcello
    • Structural Engineering and Mechanics
    • /
    • 제45권5호
    • /
    • pp.703-722
    • /
    • 2013
  • In this paper a study about concrete arch bridges built by lattice cantilevers is presented. Lattice cantilevers are partial structures composed of deck, arch, piers and provisional steel diagonals, organized as reticular cantilever girders, in order to build arch bridges without the use of centrings, supports or temporary towers. Characteristics of this construction methodology with its variants are explained together with their implications in the erection sequence. Partial elastic scheme method is implemented in order to find initial forces of temporary cables and a forward analysis is carried out to follow the actual sequence of construction, by extending a procedure already applied to concrete cable-stayed bridges and to arches built by the classical suspended cantilever method. A numerical application on a case-study of a concrete arch bridge is performed together with a comparison between different methodologies followed for its construction sequence. Differences between erection by lattice cantilevers and cable-stayed cantilevers, are discussed. Results can be useful for designers in conceptual design of concrete arch bridges.

영종대교 복층 Warren Truss 해상구간 가설공법 (Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge)

  • 김정웅;서재화;양무석;육일동
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.232-239
    • /
    • 2001
  • 동북아 지역의 중추 공항 기능을 담당할 인천국제공항의 접근 교통 수단인 영종대교는 총 연장 $4,420{\cal}m$의 연육교로서 주경간부는 10,000ton급 이상의 선박운항이 가능한 세계 최초의 도로 및 철도 병용 복층 자정식 현수교와 접속 구간은 주경간부와의 연속성을 고려하여 복층 Truss교와 강상형교로 구성되어 있다. (주)한진중공업에서는 $2,250{\cal}m$의 복층 Truss 형식 중 해상구간 $1,375{\cal}m$(60,000tons)를 가설하였으며, 본 교량은 상로 6차선 도로, 하로 4차선 도로 및 철도복선으로 구성된 대규모 강교이다. 당초 가설공법은 교각사이에 Temporary Bent를 시공하여 교량을 $75{\cal}m$ 단위의 중블럭으로 제작하여 Floating Crane을 이용하여 가설하는 공법으로 계획되었다. 그러나 본 공법은 10개소 이상의 해상 가벤트를 설치하여 공사를 수행해야 하므로 공사기간이 길어지고 과다한 공사비 소요가 예상되며 해상공사 특성상 고품질 확보가 불확실하였다. 그러므로 당사에서는 $120{\cal}m$ 대블럭 Truss 교량을 일괄 육상/해상운송 및 육상과 동일한 조건에서 설치할 수 있는 공법을 개발함으로써 공사기간을 단축하고 현장 이음개소를 줄여 고품질을 확보함과 아울러 경제적인 공사수행이 가능했다. 본고에서는 영종대교 가설공사 수행을 위해 개발 적용한 운송 및 설치공법에 관한 기술자료를 소개함으로서 국내 교량가설 기술발전에 일조 하고자 한다.

  • PDF

HEC-RAS 모형에 의한 감조하천구간 부정류 해석 및 세굴보호공 설계 (Unsteady Flow Analysis for the Design of Local Scour Protection by HEC-RAS(UNET) Model in the River Reach Affected by Tide)

  • 남궁돈;조두찬;윤광석
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.1138-1142
    • /
    • 2005
  • The tidal river is a river affected by tide, which causes the water level to rise and fall two times everyday periodically. The local velocity across the river could be very fast because of the cross-sectional characteristics of the river even though it's not a rainy season. Therefore extreme local scour could take place around hydraulic structures such as piers and caissons due to backward flow velocity. For the construction of pier foundation of Ilsan-bridge In the Han River, the field observations were performed to get the velocity and water level. The numerical analysis was performed by HEC-RAS(UNET). The relationship between measured maximum velocity and calculated mean velocity is achieved, which is used to estimate the velocity and water level as the construction is proceeding. Countermeasures for scour were designed with the results of the hydraulic analysis to avoid potential damage during construction work. According to the results of monitoring, the velocity increase after temporary road embankment was negligible, from which it is considered that the degradation of main channel compensated for the constriction of cross-section by embankment.

  • PDF