• Title/Summary/Keyword: Temporary Building

Search Result 217, Processing Time 0.027 seconds

Accident Prevention and System Improvement Strategies for small and medium-sized construction sites (중소규모 건설현장 재해원인 분석 및 제도적 개선방안)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.59-64
    • /
    • 2009
  • This study is to analyse the causes of accident in small and medium-sized construction sites and to provide prevention strategies and system improvement guidance. Although occupational safety and health act regulates the standards and installations of temporary structures, about an half of construction accidents were caused by poor temporary structures such as guardrails, scaffolds, work platforms, etc. It investigated 51 construction sites which is located in metropolitan area by asking a series of questions including their knowledge about regulations and opinions about prevention strategies. The result shows that many of the respondents do not have sufficient understandings about the regulations, and it implies that education and training must be reinforced in order to enhance the safety-awareness and to develop the comprehension of regulations.

A study on the application and construction of a rainwater storage tank in apartment complex (공동주택단지에서의 빗물저수조 설치 및 활용방안 연구)

  • Lee, Won-Yeul;Jeong, Sang-Min;Shin, Duck;Lee, Chuel-Hun;Han, Moo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.165-171
    • /
    • 2005
  • Nowadays, a source of all water, which has been spent by a lot of people, is the rainwater The rainwater is directly relating human being' life. According to how to use rainwater. human being' life is abundant or poor. Due to the lack of underground filtration quantity, the water circulation of the city is discontinued and the underground ecosystem is destroyed. This study suggest that the unused underground space of building and temporary structure can be used into rainwater storage tank in the facility to use rainwater. Moreover, in this study, while the building is constructed, It is showed that the water used in construction can be replaced in the rainwater.

A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects (법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안)

  • Park, Chan-Seok;Jeong, Il-Kyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction (건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안)

  • Kim, Tae-Hoon;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

Measurements of Earth Retaining Wall using Coordinate Sensor System (좌표측정 센서시스템을 이용한 흙막이 변위 계측)

  • Noh, Tae-Sung;Rhim, Hong-Chul;Han, Byung-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.196-197
    • /
    • 2015
  • Measurements of temporary earth retaining wall during construction are essential for the safety and control of building under construction. As there is a rapid development in sensor technologies, new system of coordinate sensor is developed and applied to a construction site. The new system is capable of measuring three dimensional coordinates continuously over time. It makes possible to monitor the behavior of the temporary earth retaining wall real-time. In this paper, the results of such measurements are provided with real data.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Study on the Collapse Accidents of the Temporary Structures (가설구조물의 붕괴재해에 관한 연구)

  • 백신원;최순주
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.4
    • /
    • pp.142-147
    • /
    • 1999
  • Formwork is a temporary structure that supports its own weight and that of the freshly placed concrete as well as construction live loads including materials, equipments, and workmen. In designing and building formwork, the contractor should plan for economical construction without sacrificing quality or safety. But these temporary structures sometimes collapse during the concrete placing. Among the accidents and failures that occur during concrete construction, many are formwork failures, which usually happen at the time concrete is being placed. Generally some unexpected events cause one member to give way, then others become overloaded or misaligned and the whole formwork structure collapses. In this study, formwork failure events from 1994 to 1997 are analyzed using the structural analysis program. So the causes of the respective formwork failure are explored. Therefore, the present study provides a firm base to design the temporary structures such as formwork.

  • PDF

Design Optimization of Earth Retaining Walls Using the Taguchi Method (다구찌 기법을 활용한 흙막이 가설공법 최적설계 방안)

  • Moon, Sungwoo;Kim, Sungbu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.83-89
    • /
    • 2017
  • Temporary structures provide the accessible working area when building a permanent building structure in the construction operation. Executed in a natural environment, the temporary structure is prone to the external influence factors of underground water, soil conditions, etc. These factors should be carefully considered in designing the temporary structure. The objective of this study is to apply the external influence factors in designing a more reliable earth retaining wall. The research methodology is based on the Taguchi method that has been studied to improve product quality in the industry. An orthogonal array was developed to analyze the interaction between the external influence factors and the internal influence factors. A sample case study demonstrated that the Taguchi method can be used in planning a more reliable temporary structure for earth retaining walls.

Subway Station's Seating Capacity of Temporary Evacuees from Disastrous Situation through Analyzing the Number of Toilets (위생기구(변기) 수 분석을 통한 지하철역의 임시 대피인원 수용 능력 산정)

  • Sohn, Byonghu;Hwang, Eun-Kyoung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.7
    • /
    • pp.418-426
    • /
    • 2013
  • With advantages of open spaces and existing HVAC facilities, subway station, if unexpected disastrous situation happens on the ground, can be used as a temporary safe place for evacuees. The main objective of this study is to establish a guideline on estimating evacuation capacity of the subway station and evaluating levels of service of evacuation for officials to control the situation. This guideline includes available spaces of the station, capacity of sanitary fixtures, and total number of passengers, etc. In this paper, we first analyzed the number of passengers of SMRT (Line 5~Line 8) during AM peak hour and then evaluated the number of passengers using toilets at that time. In addition, we calculated the seating capacity of subway stations on SMRT using the difference between the actual number of toilets and the estimated number of ones from the occupancy time of each toilet.

Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects - (설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 -)

  • Lee, Jin Woong;Kim, Taehoon;Cho, Kyuman
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.