A BIM-based Automated Framework for Formwork Planning on Construction Sites

  • Xu, Maozeng;Mei, Zhongya;Tan, Yi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.52-61
    • /
    • 2017
  • Considering its significant impact on the cost and schedule of construction projects, formwork as one part of temporary facility categories in construction should be arranged precisely. Current practice in the formwork planning is often conducted manually and repetitively, causing low efficiency and time waste. This study proposes an automated framework to generate more accurate and detailed formwork plans by utilizing information from building information modeling (BIM) considering the adequate geometric and semantic information provided by the BIM model. The dimensions and quantities information of elements in a building can be extracted automatically. Then, a rule is prepared for calculating the required forms erected around elements based on the contact areas. Finally, an algorithm of integrating first fit decreasing (FFD) with coordinated bottom left (CBL) is applied to automatically generate the formwork plan. The BIM-based automated planning framework is demonstrated by an illustrative example. The results show that the proposed framework can generate the formwork plan accurately and automatically, and significantly improve the efficiency in the formwork plan and reuse.

  • PDF

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

Assessment of the Educational Effects through the Building Information Modeling for the Establishment of the Wartime Relocatable Military Facilities (전시 이동형 군사시설 구축을 위한 BIM의 교육효과 분석)

  • Kim, Tae-Hui;Ahn, Sung-Jin;Park, Jang-Kweon;Kim, Heung-Bin;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.545-550
    • /
    • 2014
  • The re-locatable military facilities are significant in combat zones with limited infrastructures. Military tents are particularly one of the most essential components in the battlefields, During the offensive operation. This study assesses educational effectiveness of the 4D Building Information Modeling (BIM), which is used to deliver educational information with considering re-locatable military facility construction. Furthermore, the real time for constructing temporary concentration camp was measured, By using analysis of variance associated with the educational effects of the 4D BIM. Statistically, understandability of facility construction using 4D BIM was found to be higher than the conventional educational materials with field manual.

An Analysis on Building Steps of LFS Linux System (LFS 리눅스 시스템 구축 과정 분석)

  • Lee, Kyesang
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.2
    • /
    • pp.316-321
    • /
    • 2017
  • With the recent wide adoption of Linux in the fields of IoT, embedded, mobile, desktop and server industries, the importances of understanding the Linux system architecture as well as customizing the Linux system are increasing very steeply. Accordingly, the capabilities of building every component of Linux system from source code files have been important. The LFS (Linux From Scratch) site[1] guides the steps of building the basic Linux system from source files. The steps consist of build host preparation step, temporary system building step, final system building step, and system configuration and boot preparation step. However, the underlying concepts behind the steps used in building LFS are difficult to understand, particularly to the beginner. This paper analyzes the LFS build steps and reveal the core build concepts and principles used in each step. Additionally, this paper shows the measured package build times obtained from our build experience.

Modular Building for Urban Disaster Housing: Case Study of Urban Post-Disaster Housing Prototype in New York

  • Ford, George;Ahn, Yong Han;Choi, Don Mook
    • Fire Science and Engineering
    • /
    • v.28 no.6
    • /
    • pp.82-89
    • /
    • 2014
  • Disasters that destroy homes and infrastructure and cause significant financial damage are becoming more common as population centers grow. In addition, several natural disasters have resulted in a major loss of life and created countless refugees due to damage to housing. After major catastrophic disasters, it is very important that the government agencies respond to post-disaster housing issues and provide resources such as temporary housing before the full rehabilitation and reconstruction of destroyed and damaged housing. To provide affordable temporary housing for residents who may lose their homes as the result of a catastrophic disaster including storms, government agencies must develop a post-disaster housing prototype. In general, government agencies should explore several different forms of factory-built single-story, single family housing, such as modular homes, panelized homes, and precut homes. In urban cities including New York and Seoul, it is very important to provide housing which supports the demand for higher-density living spaces than single-family homes or trailers typically available due to the high population density and the desire to resettle as many residents as possible in their former neighborhoods. This study identified the urban post-disaster housing prototypes that may provide higher density housing with high quality living spaces, high air quality, and energy efficiency as well as rapid deployment. A case study of "Urban Post-Disaster Housing Prototype Program in New York" was conducted through a detailed interview process with a designer, engineer, contractor, the Office of Emergency Management (OEM) in New York, the U.S. Army Corps of Engineers (USACE), and temporary occupants. An appropriate disaster housing program that can provide living spaces for victims of disasters that keeps residents in their community and allows them to live and work in their neighborhoods was developed.

Analysis of Ambivalence Differences among Groups for Temporary Firefighting Facilities of Workers at Construction Sites (공사현장 근로자의 임시소방시설에 대한 집단 간 Ambivalence 차이분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.765-778
    • /
    • 2021
  • The purpose of this study is to prevent fire accidents in advance by deriving prior knowledge among groups about temporary fire-fighting facilities of workers at construction sites and devising appropriate improvement measures. The findings are as follows.First, in the case of fire extinguishers, statistical attention was paid to the contractor, supervisor, partner worker and fire extinguisher manager between designations. 87% of fire managers and 70% of facility supervisors said fire extinguisher management managers needed to be designated for each type of construction, which requires designation of fire extinguisher management managers, frequently checking and relocating. Second, in the case of simple fire extinguishing facilities, statistical attention was paid to the application of penalties for unauthorized use of fire extinguishing facilities with construction companies, supervisors, and business partners.Third, in the case of emergency alarm measures, statistical attention was paid to the application of emergency alarm sound to temporary broadcasting facilities with construction works, supervisors, and business partners.Fourth, in the case of induction, statistical attention was paid to the application of connection between construction works, supervisors, and partner workers, such as passage guidance, emergency lighting, etc.It was found that 65% of construction workers and 55% of electrical workers had different applications such as aisle guidance and emergency lighting for each type of business partner. In order to resolve blind spots such as evacuation zone guidance due to the structure of the building, it is necessary to easily distinguish the direction of the entrance door from a long distance by applying it in conjunction with passage guidance lights and emergency lighting.

Development of Post-installable Pullout Bolts and a Loading Device for Evaluating Concrete Strength (콘크리트 강도평가를 위한 인발장치와 후매입 인발볼트의 개발)

  • Ko, Hune-Bum;Lee, Ghang;Won, Jong-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.229-237
    • /
    • 2011
  • The pullout test is a nondestructive testing method certified by the American Society for Testing and Materials (ASTM) and British Standards (BS). Research has shown that it is very reliable in terms of evaluating the concrete strength of reinforced concrete members. However, the pullout test is rarely performed on domestic construction sites due to the complex procedures and high costs involved. This study proposes a new pullout test composed of a post installable break-off bolt, an insert nut, and a pullout tester, which satisfy both economical and practical purposes on a construction site. Three different types of special fastening methods, a temporary fixed bolt, a plastic fixed panel, and a fixed bar, have been developed. A pullout tester is proposed that is driven by the circle force introduced into a handle composed of eight gears without a load cell and a hydraulic cylinder. The serviceability and reliability of these instruments were investigated through experiments at construction sites. Furthermore, the sample pullout test with a wall specimen was conducted to estimate the usefulness of the temporary fixed bolt type of fastening methods and pullout devices. Eventually, the developed instruments will be useful on construction sites if minor requirements are met.

A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction (고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델)

  • Ahn Byung-Ju;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.47-58
    • /
    • 2001
  • Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

  • PDF

Investigation of Seismic Response for Deep Temporary Excavation Retaining Wall Using Dynamic Centrifuge Test (동적원심모형실험을 통한 대심도 가설 흙막이 벽체 지진 시 거동 연구)

  • Yun, Jong Seok;Han, Jin-Tae;Kim, Jong-Kwan;Kim, Dongchan;Kim, Dookie;Choo, Yun Wook
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.119-135
    • /
    • 2022
  • This paper used dynamic centrifuge tests to examine the seismic response for a deep temporary retaining wall with four input motions of 100, 1,000, and 2,400 years of return periods. The centrifuge model was designed based on an actual deep excavation design with a 50 m maximum excavation depth. The model backfill was prepared with dry silica sand at a relative density of 55%, and the retaining wall was modeled as a 24.8 m height diaphragm wall supported by struts. Acceleration response was amplified at the backfill surface, top of the wall, and near bedrock. However, in the middle of the model, input motion was de-amplified. The member forces of the wall and strut induced by the seismic load, which excited, were compared with the member force at rest condition. The wall's maximum negative and positive moments were increased to 36% and 10% compared to the maximum moment at rest. The maximum axial force increases to 70% of the at rest axial force on the bottom strut. The equivalent static analysis using Mononobe-Okabe (M-O) and Seed-Whitman (S-W) seismic earth pressures were compared to the centrifuge results. Considering the bending moment, the analysis results with the M-O theory underestimates but that with the S-W theory overestimates.

Method to Acquire Safety of Work Spaces by Ensuring Proper Ratio of Visibility of Unsafe Factors in Building Construction Sites (건설현장 위험요소의 관측비율분석에 의한 작업공간의 안전성 확보방안)

  • Choi, Heebok;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.557-564
    • /
    • 2013
  • Unsafe and dangerous factors or environments on building construction sites often cause safety accidents. Sometimes, accidents happen despite the existence of warning and caution signs. Such warning signs are likely to be hidden by stacked materials or temporary facilities on site. If workers cannot see the signs when moving or working, they could be injured, sometimes fatally. Many studies have focused on each worker's position, and various systems have been developed using GPS signals and sensors. This paper suggests a method for identifying the problem of worker inability to see the unsafe factors, to manage the problem in the construction planning phase by considering things from the worker's perspective. The method uses CAD software to investigate the relation between the height of stacked materials and the visible ratio of the unsafe factor. The results of a sample project show that the changes in the height and location of stacked materials make the site safer.