• Title/Summary/Keyword: Temporary Building

Search Result 217, Processing Time 0.024 seconds

Temperature and humidity characteristics of waste glass aggregate-based vegetation blocks using smart environmental sensor (스마트 환경 센서를 활용한 폐유리 골재 기반 식생블록의 온/습도 특성)

  • Gil, Min-Woo;Kim, Gyu-Yong;Pyeon, Su-Jeong;Choi, Youn-Sung;Park, Jong-Yeop;Nam, Jeong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.51-52
    • /
    • 2023
  • Recently, heat island and dry island phenomena occur frequently due to land surface development and excessive energy consumption in urban areas. As a result, the surface temperature of the building and the entire temperature of its surroundings are increased, and as a result, the durability of the building is rapidly deteriorated. In order to suppress these causes, a method of maintaining the temperature of road heating wires was implemented as a temporary measure, but this did not predict climate change. Therefore, this study is a method to measure the compressive strength, density, and thermal conductivity of light weight concrete using waste glass foam beads. After fabricating a simple chamber, the temperature and humidity of the inside and outside were measured with an Arduino device in consideration of external factors. Therefore, if waste glass foam beads made through proper mixing are constructed in the urban center, the quality of the urban can be improved.

  • PDF

The Improvement of Delivery System for International Sports Complex Facility (국제종합경기 시설공사 발주방법의 개선 방안)

  • Choi Yong-Ho;Lee Soo-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.107-112
    • /
    • 2005
  • Renovation of existing sports facilities or construction of temporary ones for international complex games requires a wide variety of hundreds of sub construction projects to be awarded at the same time but there are few precedents required regarding the study of tendering process required in such cases. As award of construction contracts to build sports facilities for various international complex games is a critical determinant of fate of international complex games in the initial phase, it is very critical that adequate construction tendering process bedetermined. This research is aimed to study tendering cases for renovation or construction of critical international sports facilities to enhance efficiency of facility construction and define most reasonable tendering approach to satisfy schedule constraints often associated with international complex games and contribute to improvement of international competitiveness of their host cities and propose a direction for further development. This study also provides inputs to subsequent sports events of comparable scale to minimize trial and error.

  • PDF

A Case Study on the Self-Supported earth Retaining wall (2열 자립식 흙막이 공법(SSR) 시공사례 연구)

  • Lee, Gyu-Dong;Son, Sung-Gon;Sim, Jae-Uk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.85-86
    • /
    • 2011
  • The temporary support system in Korea have been carried out generally along with installing supports, which are struts, anchors, rakers. However, most of existing support systems in application relatively have limitations such as cost increase, construction configuration, and displacement occurred with support systems. Thus, a new retaining support system(referred to as the SSR, NET No.533) was developed to solve the aforementioned problems. This study introduces the design, construction, and maintenance of the SSR system under the different construction conditions. The behavior and characteristics of the SSR system were identified based on the case studies.

  • PDF

A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area (가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구)

  • Park, Chang-Wook;Moon, Seung-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.

A Preliminary Study to Develop the Construction Method for Working Exterior Simultaneously with Vertical Structural Work (공동주택용 외단열 적층시공 공법 개발을 위한 기초연구)

  • Cui, Jun-Long;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.73-74
    • /
    • 2014
  • A construction method allowing exterior insulation working to be carried out simultaneously with vertical structural work through modification of the temporary vertical system form could be a breakthrough to invigorate exterior insulation construction in high-rise apartments. Therefore, the purpose of this study, as a preliminary study for developing such a method, was to derive significant engineering characteristics (E.C) using QFD which can reflect the users' need for E.C. Based on this result, a construction method will be developed in further research.

  • PDF

Technology Proposal for Curved Concrete Tracks Construction of 2018 Winter Olympic Sliding Center in Pyeongchang (평창 동계올림픽 슬라이딩센터의 곡면콘크리트 트랙 시공을 위한 기술제안)

  • Park, Young-Mi;Kim, Hye-Won;Park, Ki-Hong;Jo, Seong-Joon;Kim, Sung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.69-70
    • /
    • 2014
  • For the curved concrete track construction of 2018 winter Olympic sliding center in Pyeongchang, in this study proposed the digital fabrication technology using CNC. This method can control the 3D geometries of the curved concrete structure based on the digital design. Conventional method generates the construction errors because this method fabricates many temporary zig bar using 1:1 full size drawing for install frozen pipes and sets up each zig bars at the construction site. Propose method is effective to ensure the precise fabrication and construction of zig bars. Also this method can eliminate errors of the frozen pipes position and curved concrete construction.

  • PDF

A Numerical Simulation of Heat Flow Field for Heat Island Effect Analysis to Air Pollutants Dispersion in Apartment Complex (아파트 단지내의 열섬효과가 대기오염물질 확산에 미치는 영향 해석을 위한 열유동장 수치모의)

  • Jang Eun-Suk
    • Journal of Environmental Science International
    • /
    • v.14 no.6
    • /
    • pp.577-582
    • /
    • 2005
  • Enormous apartment complexes in urban areas, temporary inversion state and heat island effect occur due to the strong sunshine and weak wind speeds which hinders the dispersion of air pollutants that are emitted from neighboring areas of apartment complexes. In this study, analysis were conducted by using the Fluent code based on the CFD(Computation Fluid Dynamics), including building layout, material, building height from the ground surface, the heat, analysis of flow field in the apartment complex. It was estimated that the temporal radiation inversion phenomenon during the daytime, which was caused by the weak wind speed and higher temperatures in the upper level, contributed to the stagnation of the air pollutants in the lower layer of the apartment complex.

Comparison of Prescription Regarding Form Work in Standard Specifications among Domestic and Foreign Countries (국내외 표준 시방서의 거푸집 및 동바리 시공.해체 관련 규정의 비교)

  • Jeon, Kyu-Nam;Choi, Sung-Yong;Noh, Sang-Kyun;Back, Dae-Hyun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.195-198
    • /
    • 2009
  • In this paper, regulation for form work in standard specification among Korea and foreign countries are studied and compared. Within the scope of this paper, regulation regarding fabrication of form and form removal are mainly focused on. Standard specification prescribed by construction temporary equipment association provides detailed regulations and well arranged. ACI 347-04, CEB-FIP and BS EN 13670 had different style and scope compared to domestic specification. Especially, regulation for form removal in ACI prescribed in terms of minimum period.

  • PDF

Augmented Reality Pre-inspection for Barrier-Free Authentication (증강현실 기술을 활용한 BF 인증 사전 검사 방법)

  • Shin, hyung-woo;Shin, yoon-seok;Yu, Wi-Seong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.233-234
    • /
    • 2022
  • In Korea, various policies are implemented so that the socially disadvantaged (disabled, elderly, pregnant women, temporary disabled, etc.) can easily access individual facilities and areas. As the nation's interest in the socially disadvantaged increases, the need for BF certification is also emerging in buildings in private facilities. However, this system requires a lot of cost and time in the examination process, so if certification fails, social costs and time losses are high. To solve this problem, this paper presents a measurement plan for mixed reality devices using HoloLens, a mixed reality device hardware that can pre-check BF certification based on augmented reality, and Unity 3D, MRTK, a development tool.

  • PDF

A Study on the Risk Prediction System Using System Support Load Monitoring Sensor (시스템 서포트 하중 모니터링 센서를 이용한 위험 예측시스템 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.186-187
    • /
    • 2020
  • Damage to temporary facilities and structural members caused by excessive loads in the field continue to occur. If the load can be monitored in advance, the risk can be prevented. In this study, a load cell sensor is installed under the system support, and load data is wirelessly transmitted through a Bluetooth AP(wireless). Risk prediction system is proposed through an construction alarm when an abnormal load occurs through real-time multi-point monitoring by sensor location.

  • PDF