• 제목/요약/키워드: Technical Feasibility Analysis

검색결과 151건 처리시간 0.028초

신재생에너지 발전(태양광, 풍력, 소수력, 바이오가스)의 경제성 분석 연구 (A study on economic analysis of new renewable energy power(photovoltaic, wind power, small hydro, biogas))

  • 김종민;김기영
    • 한국태양에너지학회 논문집
    • /
    • 제28권6호
    • /
    • pp.70-77
    • /
    • 2008
  • The purpose of this study evaluates a feasibility and economical efficiency of new renewable energy. According as weather change is serious problem now days, every people make attention to the reduction of greenhouse gas. The revitalization of new renewable energy creates the variety of energy source, stability of energy supply and reduction of greenhouse gas. In this study evaluates a feasibility and economical efficiency from new renewable energy of various photo voltaics, wind power, small hydro and biogas. Feasibility does in standard of technical characteristic, politic support, marketability, establishment present condition and development aim. Economical efficiency does in standard of developmental unit cost, utilization factor, equipment life, politic support cost, interest ratio. The results of this study were as follows photo voltaics, wind, small hydropower, biogas in order feasibility is high. Developmental unit cost, utilization factor, equipment life, politic support cost and analyzed the relationship of interest ratio fluctuation and economical efficiency. From all new renewable energy the utilization factor most is important in economical efficiency but necessary utilization factor is difficult because environmental problem.

방폭설비 성능유지 실태분석을 통한 관리방안 연구 (A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities)

  • 권용준;변정환
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

국방무기체계 연구개발 기반 경제적·기술적 파급효과 : 지상·해상·공중 무기체계를 중심으로 (Economical & Technological Ripple Effects in Acquiring New Weapon System : Focused on Ground·Sea·Air Weapon System)

  • 신상욱;오천균;임동순;최봉완
    • 산업경영시스템학회지
    • /
    • 제41권4호
    • /
    • pp.111-122
    • /
    • 2018
  • The private sector is currently reviewing the feasibility of the project or deciding economic policies by analyzing the economic ripple effects. However, the arms acquisition project focuses on the need for the national defense weapons system by analyzing the costs and the effectiveness of the analysis and reviewing the necessity and feasibility of the project. In order to analyze the economic ripple effects, KB (the Bank of Korea) prepares and publishes an analysis table of industrial associations in a given unit. IAAR (the industrial association analysis report) is difficult to apply directly to the defense weapons system. Therefore, research on the economic ripple effects applicable to the defense arms procurement project was needed. In this study, we propose the generic methodology for estimating economical and technical ripple effects resulted in acquiring new weapon systems. Based on the analysis of inter-industrial relations, economical ripple effects are estimated with production inducing effects, value-induced effects, employment-induced effects and export-induced effects. Also, the technological ripple effects are estimated with technological intensity represented by investment cost in research and development. To show the validity of proposed methodology, a case study of acquiring new weapon systems such as GR (guided rocket), destroyer, and helicopter is accomplished. From the case study, it is concluded that these economical & technological ripple effects can be used as a reference to decision making in the course of acquiring major future defense weapons systems.

선박추진용 HTS모터 기술분석 연구 (Research on the Technical Analysis of HTS Motor for Vessel Propulsion)

  • 김종구;김기찬;이찬주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 B
    • /
    • pp.779-781
    • /
    • 2004
  • Recently, as the interests in the electrical propulsion ship increase, it is needed to prepare for the technical demand of the versatile HTS synchronous motor, the noble paradigm of the electrical motor. In this paper, the electrical propulsion apparatus was classified at first. The, the merits and demerits of the HTS synchronous motor were investigated. Finally, the feasibility study of development of the HTS motor was performed with electromagnetic FEM analysis. Additionally, the points to be considered in decision of the capacity or number of the HTS motor and the way to supply electricity were studied in this paper. This work would be very useful in establishing the development direction of the HTS motor

  • PDF

DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석 (Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method)

  • 이아연;장미경
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.

미얀마 송전선로 설계 기술계산시스템 개발 (Development of the Technical Calculation System for Transmission Line in Myanmar)

  • 백승도;민병욱;김종화;신태우;김세현;박재웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.632-634
    • /
    • 2005
  • Korea takes part in overseas business by use of accumulated advanced technology through construction of the worlds first 765kV double circuit transmission system designed with pure local technology. 'Development Study on the Power System Network Analysis in Myanmar' was received in the year 2001 and was completed in the year 2002. The following project,'Feasibility Study and Basic Designs for the 500kV Transmission System in Myanmar' has been in progress since January, 2004. With regards to this project the master plan for the Myanmar long term power system was submitted in January 2005, and now the basic designs for the 500kV transmission system construction are in progress. Technical data for the design of the transmission line is calculated using a very complex numerical formula that is almost impossible to be completed by hand. So the transmission technical calculation system was developed to calculate and support Myanmar technical data for the design of transmission line with respect to factors such as wind prossure load, tower design data conductor design data and insulator design data on the basis of weather conditions for the Myamar transmission line design area of the Myanmar 500kV trans- mission line construction basic design.

  • PDF

철도차량 RAMS 적용에 관한 연구 (Study on the Application of RAMS for Rolling Stock)

  • 오지은;강찬용;김철호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.206-212
    • /
    • 2004
  • This paper is application of System Assurance(SA) for the rolling stock. As railway systems become more complex, design teams are increasingly under pressure to deliver, design solutions, which integrate both technical and Systems Assurance(SA). Systems Assurance is the application of management methods and analysis techniques to ensure that a design meets Reliability, Availability, Maintainability and Safety (RAMS) criteria. It should be clearly understood that the intent of System Assurance is not just to provide analytical techniques as a metric on performance, but more importantly it should provide a management tool with which to co-ordinate and assure the whole design. System Assurance encompasses the ongoing requirement to consider safety, and RAM through each stage of a Project, from feasibility study through to commissioning and operation. If System Assurance is undertaken properly at feasibility study at the design stages of a Project, the benefits of such analyses can be significant in identifying potential problems early enough for action to be taken before manufacture or installation. At commissioning, RAMS demonstration activities are undertaken to validate the predictive and analytical techniques undertaken during the design.

  • PDF

문제해결기법 TRIZ의 ADRIGE 알고리즘을 이용한 초음파분무화학기상증착 장비 개발에 관한 연구 (A Study on the Development of Mist-CVD Equipment Using the ADRIGE Algorithm of the Problem-Solving Method TRIZ)

  • 하주환;신석윤;변창우
    • 반도체디스플레이기술학회지
    • /
    • 제22권2호
    • /
    • pp.133-137
    • /
    • 2023
  • This study the problem of deposition uniformity observed during Mist-CVD deposition experiments. The TRIZ's ADRIGE algorithm, a problem-solving technique, is utilized to systematically analyze the issue and propose solutions. Through problem and resource analysis, technical contradictions are identified regarding the precursor's volume and its path when it encounters the substrate. To resolve these contradictions, the concept of applying the principle of dimensional change to transform the precursor's three-dimensional path into a one-dimensional path is suggested. The chosen solution involves the design of an enhanced Mist-CVD system, which is evaluated for feasibility and analyzed using computational fluid dynamics. The analysis confirms that the deposition uniformity consistently follows a pattern and demonstrates an improvement in uniformity. The improved Mist-CVD equipment is validated through analysis, providing evidence of its feasibility and yielding satisfactory results.

  • PDF

Use of Geo-spatial Information System for the Potential Location Analysis of Small Hydropower.

  • Bastola, Shiksha;Lee, Sangheop;Kareem, Kola Yusuff;Jung, Younghun
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2021년도 학술발표회
    • /
    • pp.151-151
    • /
    • 2021
  • The alarming climate change impacts are demanding the use of renewable energy sources like never before. Hydropower is one of the most cost-effective and environmental friendly energy technology recognized in the world. Big hydropower projects come up with the requirements of huge investment costs along with environmental impacts, whereas small hydropower(SHP) are considered a best solution for the economical source of energy. SHP, basically Run-of-River (RoR) type plants can be sustainable renewable energy sources and given the nature of perennial rivers flowing from steep gradient and rugged topography, feasibility of such plants is equally high in Nepal. The objective of this study is to determine the primary potential sites for the development of RoR type SHP sites using Geo-spatial Information System(GSIS). The use of GSIS enables precise survey of large area within a short period of time. This study has focused on the determination of locations by establishing defined criterions and methodologies and hence have located multiple locations rather than selecting one best location. The approach is applicable for the rapid initial screening of potential locations and results can facilitate detail feasibility study for the technical and economic analysis of SHP in the basin.

  • PDF

Feasibility Study of Distributed Auxiliary Resonant Commutation Snubber Linked Three Phase Voltage Source ZVS Inverter with Digital Servo Control Implementation

  • Hiraki, E.;Hattori, H.;Nakaoka, M.;Horiuchi, T.;Sugawara, Y.
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1998년도 Proceedings ICPE 98 1998 International Conference on Power Electronics
    • /
    • pp.341-345
    • /
    • 1998
  • This paper presents performance and loss analysis of Auxiliary Resonant Commutation Snubber-linked (ARCS) three phase voltage source soft switching inverter which is operated under a condition of Zero Voltage Switching (ZVS). The system performances of this ARCS soft switching inverter which is controlled on optimal type I digital servo scheme are illustrated and evaluated on the basis of experimental results.

  • PDF