• Title/Summary/Keyword: Task schedule

Search Result 149, Processing Time 0.037 seconds

Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects (목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 -)

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.41-53
    • /
    • 2019
  • As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.

TB and Knapsack Based Improved Scheduling Techniques for Multi-Function Radar (TB와 냅색 기반의 향상된 다기능 레이다 스케줄링 기법)

  • Hwang, Min-Young;Yang, Woo-Young;Shin, Sang-Jin;Chun, Joohwan
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.29 no.12
    • /
    • pp.976-985
    • /
    • 2018
  • Modern radars such as the phase array radar can handle various tasks by generating a beam from a phased array antenna. Radar can be used for miscellaneous applications such as surveillance, tracking, missile guidance etc. Previous radar systems could handle only one task at a time. As such, multiple radars were required to perform simultaneous tasks. Multi-function radars can perform many tasks using only one radar system. However, the radar's resources are limited in this instance. To efficiently utilize time, it is necessary to properly schedule tasks in the radar's timeline. In this report, we investigate the efficiency of different scheduling tasks.

Causes and Countermeasures of School Records Misclassifications : Focusing on the 'General Disposition Authority for School Records' (학교 기록물 분류의 문제점과 개선방안 학교 기록관리기준표 분석을 중심으로)

  • Woo, Jee-won;Seol, Moon-won
    • The Korean Journal of Archival Studies
    • /
    • no.58
    • /
    • pp.299-332
    • /
    • 2018
  • The purpose of this study is to investigate the current status and causes of misclassification of school records and to suggest the directions to improve the School Records Management Criteria Table(general disposition authority for school records), which will lead to misclassification reducement. This study begins with analysing the records created or received in four schools sampled for one year to investigate the status and causes of misclassifications. A advisory group including four administrative officers and seven records managers was formed and group meeting was held twice to identify the causes of the misclassification and to suggest alternatives. In this study, 33 unit tasks(transactions) with frequent misclassification were identified, and the cause of misclassification was analyzed based on focus group interviews. The main causes of misclassification were categorized into two types. This study concludes with suggesting the improvement of the School Records Management Criteria Table for addressing the causes, including commentary reinforcement and the addition of workflow to complex tasks.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

An Improved Online Algorithm to Minimize Total Error of the Imprecise Tasks with 0/1 Constraint (0/1 제약조건을 갖는 부정확한 태스크들의 총오류를 최소화시키기 위한 개선된 온라인 알고리즘)

  • Song, Gi-Hyeon
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.34 no.10
    • /
    • pp.493-501
    • /
    • 2007
  • The imprecise real-time system provides flexibility in scheduling time-critical tasks. Most scheduling problems of satisfying both 0/1 constraint and timing constraints, while the total error is minimized, are NP-complete when the optional tasks have arbitrary processing times. Liu suggested a reasonable strategy of scheduling tasks with the 0/1 constraint on uniprocessors for minimizing the total error. Song et at suggested a reasonable strategy of scheduling tasks with the 0/1 constraint on multiprocessors for minimizing the total error. But, these algorithms are all off-line algorithms. In the online scheduling, the NORA algorithm can find a schedule with the minimum total error for the imprecise online task system. In NORA algorithm, EDF strategy is adopted in the optional scheduling. On the other hand, for the task system with 0/1 constraint, EDF_Scheduling may not be optimal in the sense that the total error is minimized. Furthermore, when the optional tasks are scheduled in the ascending order of their required processing times, NORA algorithm which EDF strategy is adopted may not produce minimum total error. Therefore, in this paper, an online algorithm is proposed to minimize total error for the imprecise task system with 0/1 constraint. Then, to compare the performance between the proposed algorithm and NORA algorithm, a series of experiments are performed. As a conseqence of the performance comparison between two algorithms, it has been concluded that the proposed algorithm can produce similar total error to NORA algorithm when the optional tasks are scheduled in the random order of their required processing times but, the proposed algorithm can produce less total error than NORA algorithm especially when the optional tasks are scheduled in the ascending order of their required processing times.

Timing Verification of AUTOSAR-compliant Diesel Engine Management System Using Measurement-based Worst-case Execution Time Analysis (측정기반 최악실행시간 분석 기법을 이용한 AUTOSAR 호환 승용디젤엔진제어기의 실시간 성능 검증에 관한 연구)

  • Park, Inseok;Kang, Eunhwan;Chung, Jaesung;Sohn, Jeongwon;Sunwoo, Myoungho;Lee, Kangseok;Lee, Wootaik;Youn, Jeamyoung;Won, Donghoon
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.5
    • /
    • pp.91-101
    • /
    • 2014
  • In this study, we presented a timing verification method for a passenger car diesel engine management system (EMS) using measurement-based worst-case execution time (WCET) analysis. In order to cope with AUTOSAR-compliant software architecture, a development process model is proposed. In the process model, a runnable is regarded as a test unit and its temporal behavior (i.e. maximum observed execution time, MOET) is obtained along with on-target functionality evaluation results during online unit test. Furthermore, a cost-effective framework for online unit test is proposed. Because the runtime environment layer and the standard calibration environment are utilized to implement test interface, additional resource consumption of the target processor is minimized. Using the proposed development process model and unit test framework, the MOETs of 86 runnables for diesel EMS are obtained with 213 unit test cases. Using the obtained MOETs of runnables, the WCETs of tasks are estimated and the schedulability is evaluated. From the schedulability analysis results, the problems of the initially designed schedule table is recognized and it is fixed by redesigning of the runnable mapping and task offset. Through the various test scenarios, the proposed method is validated.

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF

The method of development for enhancing reliability of missile assembly test set (유도탄 점검 장비의 신뢰성 향상을 위한 개발 방법)

  • Koh, Sang-Hoon;Han, Seok-Choo;Lee, Kye-Shin;Lee, You-Sang;Kim, Young-Kuk;Park, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.8
    • /
    • pp.37-43
    • /
    • 2018
  • A developer solves problems with isolating failures if faults are detected when inspecting missiles using the missile assembly test set (MATS) and then resumes the testing. In order to identify faults, it is necessary to analyze the data coming from the equipment, but the information received may not be sufficient, depending on the inspection environment. In this case, the developer repeats the test until the problem is reproduced or checks the performance of each piece of equipment that is related to the fault. When this task is added, schedule management becomes problematic, and development costs rise. To solve this problem, we need to design a MATS in a systematic way to increase fault coverage while satisfying the required reliability. By designing the necessary processes for each procedure, it is possible to reduce the fault identification time when a fault is detected during operations. But it is not possible to guarantee 100% fault coverage, so we provide another method by comparing costs and effects. This paper describes a development method to enhance the reliability of the missile assembly test set; it describes the expected effects when it is adapted, and describes the limitations of this method.

Safety Techniques-Based Improvement of Task Execution Process Followed by Execution Maturity-Based Risk Management in Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법에 기반한 수행프로세스의 개선 및 수행성숙도 평가를 활용한 위험 관리)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.89-100
    • /
    • 2018
  • The precedent study stage of defense programs is a project stage that is conducted to support the determination of an efficient acquisition method of the weapon system determined by the requirement. In this study, the FTA/FMEA technique was used in the safety analysis process to identify elements to be conducted in the precedent study stage and a methodology for deriving the key review elements through conceptualization and tailoring was suggested. To supplement the key elements derived from the existing research, it is necessary to analyze various events that may arise from key elements. To accomplish this, the HAZOP technique for safety analysis in other industrial fields was used to supplement the results of kdy element derivation. We analyzed and modeled the execution procedure by establishing input/output information and association with the key elements of the precedent study stage derived by linking HAZOP/FTA/FMEA techniques. In addition, performance maturity was evaluated for performance of precedent study, and a risk-based response manual was generated based on inter-working information with key elements with low maturity. Based on the results of this study, it is possible to meet the performance, cost, and schedule of the project implementation through application of the key elements and procedures and the risk management response manual in the precedent study stage of the defense program.

A Study on Developing An Experimental Model to Solve for Optimal Forest-Level Timber Harvesting Schedules Using Linear Programming (대단지(大團地) 산림(山林)의 목재생산계획(木材生産計劃) 분석(分析)을 위한 선형계획(線型計劃) 실험전산모델에 관한 연구(硏究))

  • Chung, Joo Sang;Park, Eun Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.82 no.3
    • /
    • pp.292-304
    • /
    • 1993
  • This research developed a forest-level harvest scheduling model using linear programming (LP). The formulations of the LP model include timber production schemes with constraints of nondecling yield forest conversion strategies, the minimum timber supply, levels and the maximum cut acrages. The model is able to generate both Model I and Model II types of input matrix in MPS format. In this paper, use of LP in building the framework of the strategic forest planning model was justified by comparing the algorithmic characteristics of LP with those of Gentan probability and binary search approaches through literature reviews. In order to demonstrate the field applicability of the model proposed. (1) the harvest scheduling problem for about 11,000-hectare case study area (Mt. Baekun area in Southern Experimental Forest of Seoul National University) was formulated and soloed and (2) the effects of the change in task regulatory timber production constraints or. optimal harvesting schedules here investigated.

  • PDF