• Title/Summary/Keyword: TMDLs

Search Result 70, Processing Time 0.019 seconds

Derivation of Continuous Pollutant Loadograph using Distributed Model with 8-Day Measured Flow and Water Quality Data of MOE (환경부 8일 간격 유량·수질 관측자료와 분포형 모형을 이용한 연속오염부하곡선의 유도)

  • Kim, Chul-Gyum;Kim, Nam-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.1
    • /
    • pp.125-135
    • /
    • 2009
  • Reliable long-term flows by SWAT-K model were applied to the relationship between stream flow and pollutant load derived from 8-day measured data of Ministry of Environment (MOE) in order to obtain continuous loadograph and evaluate accuracy in water quality modeling for the Chungju dam watershed. The measured flow were compared with flow duration curve from the model, and it showed that measured values corresponded to the almost full range of stream flow conditions except at Odae A. And there was significant relationship ($R^2=0.60{\sim}0.97$) between measured flow and water quality load at all unit-watersheds. Applying this relationship to simulated flows, continuous loadograph was obtained and compared with modeled pollutant loads. Although there were some differences during some dry and flood seasons, those were not significant and overall trend showed a good agreement. From the results, we would be able to derive a continuous loadograph based on measured data at total maximum daily loads (TMDLs) unit-watersheds on a national scale, in which stream flow and water quality have been measured at 8-day intervals since 2004, and this could be helpful to utilize distributed water quality models with difficulty in calibrating and validating parameters from lack of measured data at present.

Evaluation and Comparison of Four Streamflow Record Extension Techniques for Namgang Dam Basin (남강댐 유역의 네 가지 하천유량자료 확장방법 비교 및 평가)

  • Kim, Gyeong-Hoon;Jung, Kang-Young;Yoon, Jong-Su;Cheon, Se-Uk
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.1
    • /
    • pp.60-67
    • /
    • 2014
  • In this study, four methods for calculation of continuous daily flow was suggested using short-term or partial recording station of streamflow including missing data. Using these methods, standard flows at the outlet of unit/small basins for the management of total maximum daily loads (TMDLs) in Namgang dam basin were estimated from full-period flow duration curve (FDC). Four methods of extension are described, and their properties are explored. The methods are regression (REG), regression plus noise (RPN), and maintenance of variance extension types 1 and 2 (MOVE.1, MOVE.2). In these methods, the continuous daily flow was calculated using extension equation based on correlation analysis, after conducting the correlation analysis between historic record of streamflow and long-term recording station (a base station). Finally the best optimal method was selected as the MOVE.2, and the standard flows in the abundant, ordinary, low and drought flow estimated from FDC was evaluated using MOVE.2 in unit/small basins.

Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads (오염부하지속곡선(LDC)을 이용한 수질오염총량관리 단위유역 목표수질 달성여부 평가방법)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.5
    • /
    • pp.693-703
    • /
    • 2012
  • Load Duration Curve(LDC) is a useful tool for analyzing water quality characteristics under various stream flow conditions. This study investigated the methods to identify impaired waterbodies in the assessment of water quality goal attainment by using LDC for the management of Total Maximum Daily Loads (TMDLs). Three methods were proposed. Non-typical regime exclusion method is a method to exclude water quality observations in the non-typical extreme flow conditions in order to minimize the influence of non-ordinary water quality. Flow regime weighted average method is a method to calculate weighted mean water quality instead of arithmetic mean in order to consider water characteristics properly on stream flow regime in addition to the effect of Non-typical regime exclusion method. Load exceeded interval comparison method is a method to compare the intervals between the attained and non-attained load duration periods on the LDC. The assessment of water quality goal attainment can be performed more reasonably and precisely considering water quality variations on stream flow conditions by applying these proposed methods.

Comparison of Generated Loads by Hydroponics of Strawberry, Tomato, and Paprika in Gyeongsangnam-do (경남지역 딸기, 토마토, 파프리카 양액재배에 따른 발생부하량 비교)

  • Cho, Hyun Kyung;Kim, Sang Min
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.5
    • /
    • pp.73-81
    • /
    • 2021
  • The objective of this study was to analyze the waste nutrient generation loads from hydroponics for three major crops in Gyeongsangnam-do. Study hydroponic farms were selected for the three major crops such as paprika, strawberry, tomato based on the agricultural statistics data and field investigation. The flow amount and water quality for inflow and outflow of study hydroponic farms were monitored and analyzed on a monthly basis. Monitored samples were analyzed in terms of DO, BOD, T-N, T-P, SS, and EC. The generated load of BOD, T-N, and T-P were calculated from the monitored flow and water quality. The monitoring results showed that the drainage ratio for the circular hydroponic farm was lower than the non-circular hydroponic farm because the outflow from the circular hydroponics were much lower than that from the non-circular. The generated load calculation results showed that the BOD tended to have a smaller value than the TMDLs guideline for land, while T-N and T-P showed higher value than that from the TMDLs guideline. In order to effectively manage the pollutant load discharged from the hydroponics farming complex, it is necessary to manage the non-circulating hydroponics farm. To improve water quality, it is necessary to gradually expand the circulating hydroponics farm through policy and economic support.

Water Quality Status of the Unit Watersheds in the Yeongsang / Seomjin River Basin since the Management of Total Maximum Daily Loads (수질오염총량관리제 시행에 따른 영산강.섬진강수계 단위유역의 수질 현황)

  • Park, Jae Hong;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.5
    • /
    • pp.719-728
    • /
    • 2011
  • The results of investigation on the water quality of the unit watersheds in the Yeongsang/Seomjin River indicate that $BOD_5$, SS, T-P decrease in most of the unit watersheds. However, $COD_{Mn}$ and T-N increase since the Total Maximum Daily Loads (TMDLs). It is thought that $COD_{Mn}$, which is included non-biodegradable matters, is difficult to decrease only using by conventional biological treatment facilities and T-N is affected by non-point source, etc. The results of assessment on 3 years $BOD_5$ indicate that most of the unit watersheds were being improved except Yeongbon A, Seombon C and Yocheon B. In addition, it was found that T-P were also being improved except Yocheon B and Hwangryeong A. Consequently, water qualities of the unit watersheds have been improved in many cases since the TMDLs.

Characterization on the Variation of Streamflow at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin - (수질오염총량관리 단위유역의 유량변화 특성분석 - 금강수계를 대상으로 -)

  • Park, Jun Dae;Oh, Seung Young;Choi, Ok Youn
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.6
    • /
    • pp.914-925
    • /
    • 2011
  • The variation of streamflow is regarded as one of the most influential factors on the fluctuation of water quality in the stream. The characteristics of the variation should be taken into account in the plans for the management of Total Maximum Daily Loads (TMDLs). This study analysed and characterized spatial distribution and temporal variation of streamflow at each unit watershed in Guem-river basin. For the analysis of the distribution of streamflow, the type and the extent of the distribution were investigated for the unit watershed. For the analysis of the variation, short and long term changes of streamflow were examined. The result showed that most of the distributions were not log-normalized and the extent of variation tends to be greater at the unit watershed placed on the tributaries in the basin. A kind of margin could be granted to the unit watershed involving high variations so as to establish the water quality goal and load allotment more reasonably and effectively in view of whole waterbody.

Extension Techniques of 8 Day Interval Recorded Stream-flow Data to Daily One (8일 간격으로 부분 계측된 유량을 연속 일유량으로 확장하는 방법)

  • Baek, Kyong-Oh;Yim, Dong-Hee
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.1
    • /
    • pp.91-99
    • /
    • 2012
  • In this study, it was proposed that extension techniques of 8 day interval recorded stream-flow data which has been produced at the mouth of unit watersheds for TMDLs to daily one. The concept of this method was that the missing data at partial recording station was filled by using the daily data at a nearby, hydrologically similar streamgaging station. First, same day stream-flow was extracted from the daily stream-flow. Then, the extension equation was developed based on the sample data when the same day stream-flow from daily data and the partially recorded stream-flow was deeply related each other. The missing data was interpolated or extrapolated by the equation. Especially the maintenance of variance extension (MOVE) technique was used to derive the equation and was validated. Finally the 8-day interval recorded stream-flow at the mouth of unit watersheds in Han River Basin for TMDLs was extended to continuously daily data by using the method proposed in this study. And the low flow at each unit watershed was evaluated according to the flow-duration curve.

Evaluation of the Development and Reduction Scheme under Implementation Plan of Total Maximum Daily Loads in the Jinwi Watershed (진위천 수계의 수질오염총량제 시행에 따른 지역개발과 삭감계획 평가)

  • Han, Mideok;Ahn, Ki Hong;Ryu, Jichul;Son, Jeeyong;Park, Bae Kyung;Kim, Young Seok
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.6
    • /
    • pp.451-459
    • /
    • 2014
  • The development and reduction scheme under implementation plan of TMDLs were performed in the Jinwi watershed including 8 cities (Gunpo, Yongin, Suwon, Anseong, Osan, Uiwang, Pyeongtaek and Hwaseong) since 2012. Progress of the annual development schemes was faster than the reduction schemes in most of the cities during the planning period. Main load reduction methods included establishment and enlargement of sewage treatment plants, resources of livestock excretions, and introduction of best management practices of non-point source pollution. Especially, reduction load using recycling and composting of livestock excretions comprised 34.1% of all reduction load. It is necessary to implement methodical development and reduction scheme for making of successful performance of TMDLs and water quality improvement in the Jinwi watershed.

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Nakdong River Unit Watersheds (부하지속곡선(LDC ; Load Duration Curve)을 활용한 낙동강수계 오염총량 단위유역 목표수질 평가방법 적용 방안)

  • Jung, Kang-Young;Kim, Hong Tae;Kim, Sang Soo;Kim, Shin;Shin, Dong Seok;Kim, Gyeong Hoon
    • Journal of Environmental Science International
    • /
    • v.26 no.4
    • /
    • pp.433-445
    • /
    • 2017
  • In recent years, the United States has used the Load Duration Curve (LDC) method to identify water pollution problems, considering the size of the pollutant load in the entire stream flow condition to effectively evaluate Total Maximum Daily Loads (TMDLs). A study on the improvement of the target water quality evaluation method was carried out by comparing evaluations of two consecutive years of water quality and LDC data for 41 unit watersheds (14 main streams and 27 tributaries). As a result, the achievement rate of the target water quality evaluation method, according to current regulations, was 68-93%, and that by the LDC method was 82-93%. Evaluating the target water quality using the LDC method results in a reduction in the administrative burden and the total amount of planning as compared to the current method.

Development of a Flow Duration Curve with Unit Watershed Flow Data for the Management of Total Maximum Daily Loads (수질오염총량관리 단위유역 유량측정자료를 이용한 유황곡선 작성)

  • Park, Jun Dae;Oh, Seung Young;Choi, Yun Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.224-231
    • /
    • 2012
  • It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.