• Title/Summary/Keyword: Systems Engineering Management Plan

Search Result 407, Processing Time 0.051 seconds

A study on the practical Systems Engineering Management Plan for the LRT Project (경량전철사업을 위한 실용적 SEMP 개발에 관한 연구)

  • Choi, Yo-Chul;Han, Seok-Yoon;Cha, Gi-Ho;Chung, Su-Young;BaeChul, Joon-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.247-254
    • /
    • 2011
  • This paper is a study on the practical Systems Engineering Management Plan(SEMP) for the LRT Project. A SEMP shall be developed and applied to define and manage the systems engineering activities during the beginning of LRT Project. This paper is addressed contents and description of the practical systems engineering management plan based on the existing practices about system engineering management plan in LRT Project domain as well as the systems engineering standard as MI-STD 499A, IEEE 1220 etc. In the early stage of a LRT Project, An acquirer should provide a Systems Engineering Plan(SEP), and a contractor should summit a Systems Engineering Management Plan as the SEP in proposal. This addressed the SEMP as an aspect of the system and sub-systems supplier to systematically and effectively accomplish the systems engineering activities in LRT Project generally.

  • PDF

A Study on the Systems Engineering Management Plan for the Railway Safety Project (철도안전프로젝트에 적용한 시스템엔지니어링 관리계획서 작성에 관한 연구)

  • Choi Yo-Chul;Cho Yun-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.482-486
    • /
    • 2006
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

Systems Engineering Plan for the Development of Ultra-High-Speed Maglev Train System (초고속 자기부상철도 개발을 위한 시스템엔지니어링 계획서)

  • Lee, Young-Hoon;Min, Sung-Ki
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.21-32
    • /
    • 2009
  • The systems engineering (SE) process shall be applied to the project for successful development of ultra-high-speed (UHS) Maglev train system which is one of very large and complex systems. It is important to abolish technology differentials from the advanced developers such as Germany, Japan, etc. and to ensure discriminatory competitiveness of the application of systems engineering process for the development of the system based on appropriate concepts and requirements. General operation concept and stakeholder's requirements of UHS Maglev train system must be elicited with system concept for initiating the project. The management plan should be devised for all sorts of systems engineering activities of risk management, performance management, lifecycle cost management, etc. This paper would support to establish the systems engineering management plan (SEMP) for the program of UHS Maglev train system development with associated documents.

  • PDF

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program (철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안)

  • Kim, Jae-Chul;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Am;Han, Soon-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF

A Study on the Systems Engineering Management Plan for the Railway Safety System (철도안전시스템에 적용한 시스템 엔지니어링 관리 계획 작성사례 연구)

  • Choi Yo-Chul;Park Young-Won;Cho Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.64-69
    • /
    • 2005
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

  • PDF

A Study on the Systems Engineering Management Plan for the Korean High-speed Electric Multiple Unit 400km/h Experimental (차세대 고속열차 개발을 위한 시스템엔지니어링 관리계획 연구)

  • Lee, Tae Hyung;Choi, Sung Hoon;Kim, Sang Soo;Park, Choon Soo;Kim, Ki Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.17-24
    • /
    • 2007
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperiment) project starts in 2007. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. The Systems Engineering Management Plan(SEMP) is the primary, top level technical management document for the integration of all engineering activities within the context of, and as an expansion of, the project plan. A SEMP should be prepared for each project and regularly updated as development progresses. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF

A Scheme of Systems Engineering Based Requirements Management for Development of a Large Complex System (대형복합시스템 개발을 위한 시스템엔지니어링 기반의 요구조건관리 방안 연구)

  • Kim, Keun-Taek;Park, Chang-Su;Kwon, Byung-Chan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.2
    • /
    • pp.39-45
    • /
    • 2016
  • In order to successfully develop a large complex system, it is important that the systems engineering processes take into account the program context and characteristics. Among these processes, the requirements management process requires a management plan based on the program plans and systems engineering management plan (SEMP) to the connection with the program management system and the policy directives. In this paper, a systems engineering based requirement management scheme and guidelines for writing requirements are proposed. is proposed.

A Study on the Systems Engineering Detailed Schedule for LRT Project (경량전철사업의 시스템엔지니어링활동을 위한 상세일정계획 작성방법 연구)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Chul;Kang, Do Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.11-17
    • /
    • 2012
  • Suppliers in light rail transit project makes a systems engineering management plan(SEMP) as a top level plan which has a SEMS and SEDS as an control and monitoring means. In this paper, we analyze the international standards and some related documents, and present the directions to make the SEMS and SEDS which have WBS, accomplishments, schedule, events, person in charge. And then customize the project management tool and make SEMS and SEDS of LRT project as an example. The research results can be applied in LRT project after tailoring based on the project.