OCSP (Online Certificate Status Protocol) server which checks the certificate status provides the real time status verification in the PKI (Public Key Infrastructure) system which is the essential system of certificate. However, OCSP server need the message authentication with the server and client, so it has some shortcomings that has slow response time for the demands of many clients concurrently and has complexity of the mathematical process in the public encryption system. In this research, simulation model of the certificate status vertification server is constructed of the DEVS (Discrete EVent system Specification) formalism. This sever model is constructed to practice the authentication with hash function when certificate is checked. Simulation results shows the results of increase of the certificate status verification speed and decrease of the response time to the client.
A control system has been being developed by korean engineers for 500MW korean standard type fossil power plant with the advent of retrofit of old control system. Simulators have been used for digital I&C system pre-tests and validation tests in nuclear power plants. In this paper, the power plant simulator for control system V&V was developed in order to verify the developed control system prior to application to a power plant. The control models were developed using plant control system data, translator programs, and vendor manuals. The developed simulator was verified by steady-state test, load swing test, transient test and so on.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.5802-5809
/
2015
Railway signaling system is the vital control system in charge of the core for safely train operation, its functional safety must be checked through sufficient verification. Until now, to verify the interoperability of developed railway signaling system, the on-site testing approaches have been applied after testing in laboratory with simulator. This approaches are some limited range of interoperable verification, so more systematic verification interoperability is required. In this paper, the three phases of interoperability verification for railway signaling system was proposed, and methodology for each phases are represented. And also The interoperability validation methodology and supported testing tool for railway signaling system is represented in this paper
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.9
/
pp.397-404
/
2019
When developing a weapon system, a T&E(Test and Evaluation) can be performed using M&S for the test items that cannot be evaluated in the real world. In this case, the VV&A activities are required to prove the credibility of M&S for the T&E. Recently, the use of M&S has been increasing as the R&D trends of weapon systems are becoming more advanced. Therefore, the VV&A activities are also increasing. The VV&A activities aim to verify, validate, and accredit that the simulation can represent a real system and ensure credibility regarding its purpose and intention of use. VV&A activities are divided into V&V and Accreditation. When performing VV&A in the ADD (Agency for Defense Development), the V&V activities are performed by a separate department of the ADD and the accreditation activities are performed in the DTAQ (Defense Agency for Technology and Quality). This paper proposes a V&V process for a T&E of M&S that has been performed in ADD. The process is used to verify and validate the documents and data generated during the development process according to the accreditation criteria, and provides objective data that can be used to judge whether the accreditation decision and acceptance criteria are met.
Lee, Young-Jin;Lee, Kwon-Soon;Vachtsevanos, George
Journal of the Korean Society for Aviation and Aeronautics
/
v.16
no.2
/
pp.1-11
/
2008
Increasing demand for improved reliability and survivability of mission-critical systems is driving the development of health monitoring and Automated Contingency Management (ACM) systems. An ACM system is expected to adapt autonomously to fault conditions with the goal of still achieving mission objectives by allowing some degradation in system performance within permissible limits. ACM performance depends on supporting technologies like sensors and anomaly detection, diagnostic/prognostic and reasoning algorithms. This paper presents the development of a generic prototype test bench software framework for developing and validating ACM systems for advanced propulsion systems called the Propulsion ACM (PACM) Test Bench. The architecture has been implemented for a Monopropellant Propulsion System (MPS) to demonstrate the validity of the approach. A Simulink model of the MPS has been developed along with a fault injection module. It has been shown that the ACM system is capable of mitigating the failures by searching for an optimal strategy. Furthermore, the concepts of Validation and Verification (V&V) of such systems are introduced with relevant examples.
Journal of the Korean Society of Propulsion Engineers
/
v.19
no.4
/
pp.85-93
/
2015
Liquid rocket engines of KSLV-II employ a turbopump feed system for propellants. A turbopump real-propellant test facility based on liquid oxygen and kerosene has been constructed for the experimental verification of the turbopump performance using the real media of propellants(i.e., LOX/Kerosene). The verification tests of sub-systems were performed such as LOX/kerosene feed system and alcohol burner system. Finally, the performance of the whole system was executed and verified through a sets of validation tests with the development model of the KSLV-II turbopumps. It has been confirmed that the test facility satisfies the operating conditions and time of the turbopump at the design and off-design performance test using real-propellant.
Journal of the Korean Society of Systems Engineering
/
v.13
no.1
/
pp.15-23
/
2017
This paper describes verification of APR1400 reactor vessel by applying the system engineering approach, in which the design re-engineering method is used to check the design parameters of APR1400 RV (reactor vessel). The RV is classified as safety class 1 and therefore must adhere strictly to the rules of ASME BPVC section III, subsection NB and seismic category I. This study explores designing the RV by following the ASME guidelines and making a comparative study with the current design. To meet this objective we apply system engineering methodologies to structure the process and allow for verification and validation of the major RV design parameters such as thickness of RV. The structural thicknesses of various part of RV are determined as well as reinforcements on the RV major nozzles. A 3D virtual reality model was created based on the design parameters using CATIA V5 and animation using Dassault Composer V2016. A comparison of re-engineered ARP1400 RV and standard APR1400 RV was done to show which design parameters were taken more conservative approach.
International journal of advanced smart convergence
/
v.9
no.3
/
pp.227-231
/
2020
Recently, the importance of user experience (UX) has been rapidly increasing. Its utilization is emphasized for development of systems, products, and services. User experience is widely used across industries including services, products, processes, society, and culture. Therefore, if it is unsatisfactory, it is likely to have a direct negative impact on the corresponding system, product, or service. The failure to analyze user experience causes significant damage to the project, which may lead to its failure or redevelopment; it is hence necessary to prioritize the verification of UX in the earliest stages of development. The requirements development stage, which is a preceding stage, is an appropriate stage for the verification of user experience because the identification of user needs is completed and prototypes can be implemented. In this paper, we proposed a systematic requirements development stage; it adds user experience verification activities to the requirements development stage, using the Honeycomb model, which is a widely used tool for verifying the overall UX. User experience verification was added to the existing requirements development activities, which consisted of three steps: model definition and requirements placement, discussions between external and internal stakeholders, and review by internal stakeholders. By easily validating the user experience through this systematic requirements development stage, we expect to minimize the damage to the project due to the failure of the user experience analysis and increase the possibility of success.
Verification, Validation & Accreditation (VV&A) process is widely applied in various disciplines as a method of acquiring the credibility for M&S tools. The guideline of VV&A states that the detailed process can be established flexibly according to the needs and the availability of resources. For example, DAPA (Defense Acquisition Program Administration) guideline suggests that the accreditation process in the VV&A can be omitted if necessary. On this study, we first introduce and describe V&V process. Accreditation process is omitted due to limited time and resources. However, the proposed V&V is sufficient for our needs. Finally, we apply the proposed process of V&V to the System-Integrated Simulator of "Raybolt", Medium-Range Infantry Missile System, for the acquisition of the M&S credibility.
Proceedings of the Safety Management and Science Conference
/
2001.05a
/
pp.77-81
/
2001
Burn-in is a test procedure to find and eliminate the inherent initial failure of a product during or at the final stage of production process. Software testing is the validation and verification process which is used to cut off the faults from a software. The two have the common function and objective of "debugging". This article summarizes some significant models on the optimal hardware and software burn-in time, and provides the relevant paper lists. The need for the development of the unified burn-in policy of a hardware-software system is addressed.addressed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.