• Title/Summary/Keyword: System performance test

Search Result 7,410, Processing Time 0.045 seconds

Performance Test of Cooling System for the KEPCO HTS Power Cable (한전 초전도전력케이블 냉각시스템 성능시험)

  • Yang, H.S.;Kim, D.L.;Sohn, S.H.;Lim, J.H.;Choi, H.O.;Lee, B.S.;Choi, Y.S.;Ryoo, H.S.;Hwang, S.D.
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.2206-2210
    • /
    • 2007
  • As a power transmission line supplying power to a densely populated city, the high temperature superconducting (HTS) cable is expected to one of the most effective cables with a compact size because of its high current density. The verification of HTS power cable system have been progressed by KEPRI. A cooling system for a 3-phase 100m HTS power cable with 22.9kV/1.25kA was installed and tested at KEPCO's Gochang power testing center in Korea. The system consists of a liquid nitrogen decompression cooling system with a cooling capacity of 3kW and a closed circulation system of subcooled liquid nitrogen. Several performance tests of the cable system with respect to the cooling such as cooling capacity, heat load and temperature stability, were performed at several temperatures. Thermal cycle test, cool-down to liquid nitrogen temperature and warm-up to room temperature, was also performed to investigate thermal cycle influences. The outline of the installed cooling system and performance test results are presented in this paper.

  • PDF

A Study of the Surface Temperature Reduction Using Pipe Cooling System in Asphalt Pavement (아스팔트 도로포장에 물순환 파이프 시스템을 이용한 표면온도저감에 관한 연구)

  • Yoon, Yong Kyu;Park, Kyung Won;Lee, Suk Keun
    • International Journal of Highway Engineering
    • /
    • v.15 no.1
    • /
    • pp.75-86
    • /
    • 2013
  • PURPOSES: The purpose of asphalt pavement reducing surface temperature by using Pipe cooling system is to make pleasant city life environment. METHODS: We considered building condition to lay the pipes under asphalt pavement and figured out that temperature reducing effect with pipe cooling system. In addition, we guessed rutting through wheel tracking test with a laid the pipes under asphalt mixture and performed fatigue cracking through a flexural fatigue test for performance evaluation of pipe cooling system. RESULTS: When pipe cooling system worked, the temperature of pavement model reduced quickly in test. The system can turn down the degree by 4 or 5 quickly as well. It didn't affect rutting to lay the pipes under the pavement, but it can get damaged to asphalt pavement in early stage by the result of performance evaluation. CONCLUSIONS: We figured out that pipe cooling system can turn down the temperature of aspalt pavement surface through tests. We suggest that pipe cooling system should be considered one of the effective way to solve urban heat island problem.

Management Plan on Test Track of Advanced EMU System (차세대전동차 시스템 시험선 운영 방안)

  • Lee, H.M.;Kim, G.D.;Park, S.H.;Oh, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1036-1037
    • /
    • 2008
  • Test track of the Advanced EMU system will be developed and organically combined with technologies of power supply system, signal communication system and track structure. The purpose of the test track is a acquirement of reliability and stability through a sufficient performance test. Therefore, this paper draws up all management plans for tests of the Advanced EMU system.

  • PDF

The Construction and Performance Test of High-Speed Satellite Network Pilot System for Hydrological observations (수문관측용 고속 위성망 Pilot 시스템 구축 및 성능시험)

  • Hong, Sung-Teak;Shin, Gang-Wook;Jang, Sung-Woon;Park, Seong-Soo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.7A
    • /
    • pp.715-724
    • /
    • 2010
  • K-water has used satellite networks for 12 years for hydrological observation in various parts such as remote data acquisition and providing information including flood forecasting. It is the time to replace equipments according to long-term use of the system. A pilot system for high speed satellite networks is implemented by seven terminals, three 2-hops and 1 hub in Ku-Band bandwidth by using VSAT. According to the result for the performance test on the system, the result fot all items, including Link Budget designed meets performance levels.

Development of a Digital Home Electric Overload Alarm Performance Evaluation System for Smart Home Automation (스마트 주택 자동화를 위한 주택 전기과부하 경보 성능 평가 시스템 개발)

  • Ko, Yun-Seok
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.2
    • /
    • pp.339-344
    • /
    • 2019
  • In this paper, a digital home electric overload alarm system based on DSP for smart home automation which can minimize electrical fire damage caused by an home electrical overload was made experimentally. To verify the validity of the home electrical overload alarm technology, an electric overload alarm performance evaluation system which can artificially generate the electrical overloads was designed, developed, and constructed, and the effectiveness of the overload alarm developed by the overload test was verified. In particular, an overload test EMTP model based on EMTP-RV was developed, and simulation and measurement results obtained from the overload test were compared, and the reliability of overload performance verification results was confirmed.

Performance Characteristics of Thrust Measurement System for Hot-Firing Test of Small Liquid Propulsion Engines (소형 액체 추진기관 연소 시험을 위한 추력 측정 장치의 성능 특성 연구)

  • Kim, In-Tae;Huh, Hwan-Il;Kim, Jeong-Soo;Jang, Ki-Won;Lee, Jae-Won
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.32 no.9
    • /
    • pp.122-129
    • /
    • 2004
  • An accurate thrust measurement is one of the critical paths to the successful test and evaluation program of small liquid propulsion engines. This study describes the design factors for the development of thrust measurement system (TMS) as well as manufacturing practice of TMS hardware. We investigate characteristics of the TMS and its performance through hot-firing test of small liquid engine in a vacuum test cell which is capable of simulating 100,000 ft of altitude or higher. For performance test of TMS, we measure thrusts by changing propellant injection pressure at steady state firing mode as well as at pulse firing mode. Measured eigen frequency of the TMS is 67 Hz. Linearity test of the TMS shows good performance with less than 0.5% of linearity error.

A Design Verification for the EQM CBS Ka-band Payload System by EMC Test (EQM 통신방송위성 KA대역 탑재체 시스템의 EMC 시험을 통한 검증)

  • Lee,Ho-Jae;U,Hyeong-Je;Sin,Dong-Hwan;Park,Jong-Heung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.31 no.10
    • /
    • pp.97-104
    • /
    • 2003
  • This paper addresses EMC test results for the EQM Communications & Broadcasting Satellite(CBS) Ka-band Payload System. The aim of the EMC test is to verify that the payload system has no effect on the other system and is not affected by the external field. The compliance of EMC system requirements was verified by the analysis and measurement of the emission level from the payload system. The variation of performance by noise injection was measured to inspect the susceptibility of the payload system. The analysis and test results also showed that the electromagnetic interference has no serious effect on the overall payload system performance. It is confirmed that the EQM CBS Ka-band payload system can be operable in the space environment from the EMC performance's viewpoint. It is also obtained that better performance can be acquired by improving waveguide design and integration method.

Study on Regenerative Energy Storage System in K-AGT Test Track (경량전철 시험선에서의 에너지저장시스템 연구)

  • Cho, Hong-Shik;Ryu, Sang-Hwan;Hwang, Hyeon-Chyeol;Lee, An-Ho;Kim, Gil-Dong;Lee, Han-Min
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.208-210
    • /
    • 2008
  • LRT System Application Project is performed for the purpose of technical advancement and stabilization of K-AGT system from the viewpoint of practical use and commercialization. For those purpose, the performance test and evaluation procedure for K-AGT signaling system are developed, and the scheme of verifying the performance and function of signaling system under multi-train and driverless control environment is being conducted. For the multi-train operation in K-AGT test track, we applied the regenerative energy storage system in addition to the existing electric facilities. This paper present the design, manufacturing, and testing results of regenerative energy storage system.

  • PDF

Performance Testing of Integrated Strapdwon INS and GPS

  • Lee, Sang-Joog;Yoo, Chang-Sun;Shim, Yo-Han;Kim, Jong-Chul
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.2 no.1
    • /
    • pp.67-77
    • /
    • 2001
  • In recent navigation system, the profitable solution is to integrate the GPS and Stapdwon INS (SDINS) system and its integration allows compensation for shortcomings of each system. This paper describes the hardware preparation and presents the test results obtained from the automobile test of the developed system. The automobile tests was conducted with two kinds of inertial sensors and GPS receivers : short range and middle range test, to verify and evaluate the performance of the integrated navigation system. The reference of position is given by the Differential GPS(DGPS) which has cm-level accuracy to compare the accuracy of system. Kalman filtering is used for integrating GPS and SDINS and this filter effectively allows the long-term stability of GPS to correct and decrease the time deviation error of SDINS.

  • PDF

Application of Regenerative Energy Storage System to K-AGT Test Track (회생에너지저장시스템의 경량전철 시험선 적용)

  • Cho, Hong-Shik;Lee, Ho-Yong;Cho, Bong-Kwan;Hong, Jai-Sung;Lee, Eun-Kyu;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.325-330
    • /
    • 2008
  • LRT System Application Project is performed for the purpose of technical advancement and stabilization of K-AGT system from the viewpoint of practical use and commercialization. For those purpose, the performance test and evaluation procedure for K-AGT signaling system are developed, and the scheme of verifying the performance and function of signaling system under multi-train and driverless control environment is being conducted. For the multi-train operation in K-AGT test track, we applied the regenerative energy storage system in addition to the existing electric facilities. This paper present the design, manufacturing, and testing results of regenerative energy storage system.

  • PDF