• 제목/요약/키워드: System performance test

Search Result 7,389, Processing Time 0.05 seconds

Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant (원자력발전소 직류전원계통용 축전지 성능시험 분석)

  • Kim, Daesik;Cha, Hanju
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

Development of Comprehensive performance test equipment to confirm the performance of small radar systems (소형 추적 레이다 시스템 성능확인을 위한 종합성능시험 장비 개발)

  • Hong-Rak Kim;Youn-Jin Kim;Seong-Ho Park;Man Hee LEE;Da-Been LEE
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.2
    • /
    • pp.139-147
    • /
    • 2023
  • The compact tracking radar system is a pulsed radar tracking system that searches, detects, and tracks targets in real time against aircraft targets with a small RCS(Radar Cross Section) maneuvering at high speed. This paper describes the development of comprehensive performance test equipment to verify the performance of the radar system in a anechoic chamber environment. Describes the design and manufacture of comprehensive performance test equipment to meet requirements, including the generation of simulated target signals to simulate aircraft target signals to verify performance in the laboratory environment of radar systems. It also describes a GUI(Graphic User Interface) program to check performance through a test in conjunction with the tracking radar system. Verify the comprehensive performance test equipment implemented through the performance test.

The trial installation test of PSS to Power Plant using Real Time Digital Simulator (RTDS를 이용한 PSS 현장 설치 모의 시험)

  • Hur, Jin;Kim, Dong-Joon;Moon, Young-Hwan;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.59-62
    • /
    • 2002
  • Before a developed digital Power System Stabilizer(PSS) is installed to real power system, an efficient trial test for installing PSS is needed. In this paper, the performance of developed digital PSS for a single hydro-turbine generator and infinite bus system has been investigated using Real Time Digital Simulator(RTDS) in order to install PSS to real power system practically. The test system was composed of RTDS, three phase voltage/current amplifier and the PSS and the test scheme provided a very efficient way to verify the design and control performance of a PSS to be applied to real power system. The trial installation test through AVR 3% step test and three fault analysis may be guaranteed to install PSS to real power system.

  • PDF

A Study on the performance test of Water mist system as a fire extinguish system for Ships (선박용 미분무수 소화설비의 성능평가연구)

  • Kim, Sung-Yoon;Ahn, Bung-Ho;Kim, Dong-Seuk;Kim, You-Taek
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2006.06a
    • /
    • pp.155-156
    • /
    • 2006
  • Developed and conducted a performance test of the Water mist system that is satisfied with the requirement of a fire test requiring Class 3 Engine Mock-up exceeding net volume $3,000m^3$ as per IMO's MSC/Circ. 668 Appendix B(Test method for fire testing equivalent water-based fire-extinguishing systems for machinery spaces of category A and cargo pump rooms).Even though fuel atomizing was continued for 15 sec. after stopping of the system according to the test method relating to the atomizing fire type, no fire was reignited. This result shows the excellence of the system. There was no damage to the contents of the system after the test.

  • PDF

Electrical System Integration Test for High-Speed Train (고속전철 전기시스템의 효율적인 개발을 위한 통합시스템 시험)

  • Ryoo, Hong-Je;Lee, Joo-Hoon;Cho, Chang-Hee;Kim, Yong-Ju
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.402-404
    • /
    • 2005
  • In this paper, an effective way to develop electrical system for Korean High-Speed Train(KHST) was introduced. High speed train is complicated electrical system that consists of many kinds of control devices, power supplies and communication systems. Due to reason of cost, safety and time for development, it is not so easy to test system performance after construct the high speed train in the test track. For the effective test and verification of system performance, from each electric system test to integration test for all interconnected electrical system are performed to reduce time and cost for development of high speed train.

  • PDF

The Study of Optimal Performance Improvement Method for Aircraft of Various Variants within the Same Type (다양한 형상의 동일 기종 항공기에 대한 성능개량 최적 구현 방안 연구)

  • Kim, Youngil;Ahn, Seungbeom;Choi, Myeongseok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.25 no.3
    • /
    • pp.311-320
    • /
    • 2022
  • In this paper, we studied the optimal method of improving performance for aircraft having various variants within the same type. The study defined configuration of an entire fleet of aircraft being subject to a performance improvement program. And selected the most complicated aircraft configuration among them as a Standard Aircraft for modification by according to the proposed Aircraft Selection Process for developing an optimal Aircraft Performance Improvement Process. Based on the selected the Standard Aircraft, drew a system integration design result and carried out Evaluation Test and obtained Airworthiness Certification. Created the database with the design data of the Standard Aircraft, Evaluation Test, and Airworthiness Certification results, and applied it to variants of aircraft to complete the performance improvement program with optimized schedules and costs. By applying the proposed method to IFF performance improvement program, drew optimal system integration design and completed the program with minimized schedule.

Performance test of Concrete IoT Management System for concrete early-age quality control (콘크리트 초기 품질관리를 위한 CIMS의 개발성능 Test)

  • Lee, Young-Jun;Choi, Yoon-Ho;Seo, Hang-Goo;Hyun, Seung-Yong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.161-162
    • /
    • 2019
  • The aim of the research is analyzing the performance of the concrete IoT management system invented with similar technique from 'G' company to certify the performance of CIMS. As a results, the compressive strength assessing performance was compared. Since both systems assess concrete compressive strength with maturity method based on measured concrete temperature, both systems measured concrete temperature similarly, and maturity was calculated similarly. Therefore, the assumed compressive strength values were similar for both systems. Therefore, through the test, compressive strength assessing performance of CIMS was considered as a similar level of the 'G' company's system. Furthermore, it is considered that the CIMS has an additional advantage of reusability, adding capability of additional sensor, and wider range of Bluetooth communication.

  • PDF

Power performance Testing of Small Wind Turbine Generator System (소형 풍력발전시스템의 출력성능검사)

  • Kim, Hyeon-Ki;Kim, Byeong-Min;Yoo, Neung-Soo
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.123-128
    • /
    • 2011
  • In this study, procedures, a power performance testing system of Wind Turbine System Research Center of Kangwon National University is introduced. Test prodedures and results are presented on a stand-alone vertical-axis 200W wind turbine manufactured by Geum-Poong Energy Inc.. Power performance test is performed according to IEC standard. The test results are compared with the power performance standard. Also, the effects of normalization and disturbed sectors are considered.

  • PDF

Analysis and Evaluation of 3kW Grid-Connected PV System by Field Demonstration Test (3kW급 계통연계형 태양광발전시스템의 실증시험 분석평가)

  • So, Jeong-Hoon;Yu, Gwon-Jong;Jung, Myung-Woong;Jung, Young-Seok;Choi, Ju-Yeop
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1353-1355
    • /
    • 2003
  • Total six units of 3kW photovoltaic (PV) system and data acquisition system (DAS) are constructed for analyzing performance of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data-acquisition system. Furthermore, not only performance test of each PV system component such as PV module and power conditioning system, but also performance of total PV system e.g. system efficiency, electric power and loss factor at the site are reviewed.

  • PDF