• Title/Summary/Keyword: System performance test

Search Result 7,389, Processing Time 0.041 seconds

Traffic Generator for Performance Test of the TDX-10 Packet Handler (TDX-10 패킷처리기의 성능척정을 위한 트래픽발생기의 설계)

  • 정중수;전경표
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.3
    • /
    • pp.411-417
    • /
    • 1995
  • Packet switching is an important aspect of ISDN. In the TDX-10 switching system, which is being developed as an ISDN exchange in Korea, the packet switching function is implemented on the basis of Case B scenario of X.31. After implementing the packet switching function the performance test must be executed to check whether the design objectives of performance are satisfied or not. However, it is not easy to set up test environment for performance measurement under full load conditions. This paper presents the design of the traffic generator which enables us to do performance test of the TDX-10 packet handler under full load conditions. To generate packet traffic we change only software programs without any change of the hardware system of the packet handler.

  • PDF

Management of Test Facility for Tests of Liquid Rocket Engine on Off-Design Condition (액체로켓엔진 탈설계 조건 시험을 위한 시험설비 운용)

  • Yu, Byungil;Kim, Hongjip;Han, Yeongmin
    • Journal of Aerospace System Engineering
    • /
    • v.14 no.5
    • /
    • pp.91-99
    • /
    • 2020
  • A liquid rocket engine goes through many tests to prove its performance before liftoff. It means the tests for setting ignition and start-up conditions or a test on design condition, which verifies the design performance. However, the development process requires verification of performance under off-design conditions through tests involving different operating conditions, which affects the duration of engine development. The off-design performance test is performed by altering the conditions of the propellant supplied to the engine in conjunction with the engine performance test that varies the opening of the control valves in the engine. This paper is based on the results of the engine tests performed at the KSLV-II engine test facilities in the Naro Space Center and describes the operations of the test facility for off-design condition test that changes the inlet conditions of the turbo-pump due to changes in the pressure and temperature of the propellant supplied to the test engines.

A Study on the Protective Function Performance Evaluation of Grid-Connected Power Conditioning System for Residential Fuel Cell System (가정용 연료전지시스템 계통연계형 전력변환장치의 보호기능 성능평가에 관한 연구)

  • Lee, Jung-Woon;Seo, Won-Seok;Kim, Young-Gyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.341-344
    • /
    • 2009
  • In this paper, protective function evaluation was conducted to determine the performance and safety of a power conditioning system(PCS) for 1kW residential fuel cell system. It is essential to have a power quality, grid-connection and safety of PCS. Even though it is under 500ms by KGS-A410 standard, it is shown a rapid response time of 25ms from input under-voltage test. In terms of output over/under-voltage test, it is shown 29.15 and 79.4ms. Especially using anti-islanding test, it is shown all times under 100ms for combination cases of real and reactive power. We confirmed a rapid response characteristics and safety of PCS. The results of this evaluation are being used to develop a new test protocols of PCS.

  • PDF

A Study on Percent Agent in Pipe as a Criterion to Evaluate Limitations and Performance of Gaseous Fire Extinguishing Systems (가스계 소화설비의 제한사항 및 성능평가를 위한 배관 내 약제비율에 관한 연구)

  • Son, Bong-Sei;Kim, Hee-Woo
    • Fire Science and Engineering
    • /
    • v.21 no.4
    • /
    • pp.1-11
    • /
    • 2007
  • This study aims to investigate, review, and summarize the definition, development, and applications of "percent agent in pipe", "percent of agent in pipe" which is used as a key factor in testing and evaluating the performance of gaseous fire extinguishing agents, including Halon 1301 and $CO_2$. This study also analyzes and compares the local and international standards on testing and evaluating the performance of gaseous fire extinguishing systems, as well as the results of system performance tests conducted as a part of performance evaluation and approval programs for gaseous fire extinguishing systems, especially, Korean Gaseous Fire Extinguishing System Performance Approval Program called KFI Approval. Percent agent in pipe was defined first in NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems, dating back to the 1970's. After the phaseout of Halon 1301 systems in 1994 in the developed countries, the percent agent in pipe has been widely used in Halon 1301 alternative clean agent fire extinguishing systems, both halocarbon clean agent systems and inert gas clean agent systems, as an essential criterion to assure the system design accuracy, determine the limitations and performance of a system, and to predict the system performance results accurately, especially, in association with their system flow calculations. Underwriters Laboratories has their own standards such as UL 2127 and 2166 applying percent agent in pipe in testing and evaluating the performance of clean agent fire extinguishing systems. As a part of a system performance test and approval program called KFI Approval System, Korea also has started to apply the percent agent in pipe as a key factor to test, evaluate, and approve the performance of gaseous fire extinguishing systems, including both high and low pressure $CO_2$ systems, from the early 2000's. This study outlines and summarizes the relevant UL and KFI standards and also describes the actual test resultant data, including the maximum percents of agent in pipe for gaseous fire extinguishing systems. As evidenced in lots of tests conducted as a part of the system performance test and approval programs like KFI Approval System, it has been proven that the percent agent in pipe may work as a key factor in testing, evaluating, and determining the limitations and performance of gaseous fire extinguishing systems, especially compared with the hydraulic flow calculations of computer design programs of gaseous fire extinguishing systems, and will remain as such in the future. As one thing to note, however, there are some difficulties in using the unified percent agent in pipe to determine the maximum lengths of pipe networks for gaseous fire extinguishing systems, because the varying definitions used by some of the flow calculations (not in accordance with NFPA 12A definition) make it impossible to do any direct comparison of pipe lengths based on percent agent in pipe.

Numerical Investigation of the Effects of an Orifice Inlet on the Performance of an Ejector (Orifice Inlet효과에 의한 이젝터 성능에 관한 수치해석적 연구)

  • Lijo, Vincent;Kim, Heuy-Dong;Setoguchi, Toshiaki
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.318-322
    • /
    • 2009
  • Supersonic ejectors are simple mechanical components, which generally perform mixing and/or recompression of two fluid streams. Ejectors have found many applications in engineering. In aerospace engineering, they are used for altitude testing of a propulsion system by reducing the pressure of a test chamber. It is composed of three major sections: a vacuum test chamber, a propulsive nozzle, and a supersonic exhaust diffuser. This paper aims at the improvement of ejector-diffuser performance by focusing attention on reducing exhaust back flow into the test chamber, since alteration of the backflow or recirculation pattern appears as one of the potential means of significantly improving low supersonic ejector-diffuser performance. The simplest backflow-reduction device was an orifice plate at the duct inlet, which would pass the jet and entrained fluid but impede the movement of fluid upstream along the wall. Results clearly showed that the performance of ejector-diffuser system was improved for certain a range of system pressure ratios, where as there was no appreciable transition in the performance for lower pressure ratios and the orifice plate was detrimental to the ejector performance for higher pressure ratios. It is found that an appropriately sized orifice system should produce considerable improvement in the ejector-diffuser performance in the intended range of pressure ratios.

  • PDF

Submarine Free Running Model Development and Basic Performance Analysis (수중함 자유항주모형 개발 및 기본 성능 분석)

  • Jooho Lee;Seonhong Kim;Jihwan Shin;Jinhyeong Ahn
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.60 no.4
    • /
    • pp.256-265
    • /
    • 2023
  • This paper describes the results of the development of the submarine Free Running Model (FRM). First, the goal of development was set based on the test conditions and the test environment, and the system was obtained accordingly. The target submarine, Joubert BB2 submarine, was selected with a scale of 18.35 in accordance with the development goal. In order to conduct a submarine FRM test underwater, where communication is impossible, the FRM must operate at least semi-autonomously. For this purpose, an Extended Kalman Filter (EKF) based underwater integrated navigation system and control system using a sailplane and an X-shaped sternplane were designed respectively. In addition, a ballast system was designed to enable the model to float to the water surface in case of an emergency. To verify its propulsion, navigation, and control performance, the FRM tests were conducted in both indoor and outdoor basins. As a result, the relationship between propeller RPM and vehicle speed was derived, and it was confirmed that the navigation and control performance met the target value.

Design/Construction and Performance Test of Hypersonic Shock Tunnel Part ii : Construction and Performance Test of Hypersonic Shock Tunnel (극초음속 충격파 풍동 설계/구축 및 성능시험 Part II : 극초음속 충격파 풍동 구축 및 성능 시험)

  • Lee, Hyoung-Jin;Lee, Bok-Jik;Kim, Sei-Hwan;Jeung, In-Seuck
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.4
    • /
    • pp.328-336
    • /
    • 2008
  • The shock tunnel as a hypersonic ground test facility was designed, constructed and its performance test was conducted to reproduce the high speed flow which the hypersonic propulsion system is encountered. The design points were understood and the conceptual design was completed using the quasi one dimensional operation analysis code. After that, the specific performance and compartment design were completed using CFD simulation as the part analysis. The facility was then constructed according to those design results and the performance test was conducted for various operation conditions. In this paper, we suggested the compartment design method using CFD analysis, construction process and various performance test results in detail.

Experimental study on the spray density distribution of water spray system in road tunnel (터널 물분무소화설비의 살수밀도분포에 대한 실험연구)

  • So, Soo-Hyun;Park, Kyung-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • Spray density of the water spray system which is installed in long road tunnels and hazardous vehicle tunnels is applied without proper performance assessment process. In this study, the requirements of Spray Density Guidelines at the standard pressure is investigated through spray test set up the nozzle of a water spray system in a simulated road tunnel. The results showed that all the nozzles used in the test area did not meet the requirements of the Guidelines. The absence of performance test codes and inspection process on the nozzle at real scale in tunnels may have caused this practice. Therefore, it is suggested that the performance test regulations of the nozzle on the water spray system is established in order to properly assess the system performance.

Inlet Distortion Test of Gas Turbine Engine (가스터빈 엔진의 입구 유동 왜속 시험)

  • Lee, Jinkun;Lee, Kyungjae;Kho, Sunghee;Kwak, Jae Su
    • Journal of Aerospace System Engineering
    • /
    • v.1 no.1
    • /
    • pp.53-59
    • /
    • 2007
  • Inlet distortion test was performed at Korea Aerospace Research Institute in order to evaluate the degradation of engine performance under the distorted inlet condition. In this paper, only the inlet pressure distortion was taken into consideration. During the development process of the inlet distortion test technique, variable distortion screen was designed and evaluated under various test conditions to establish the experimental database of distortion for engine test. The result of inlet distortion test for engine shows that the operating point was changed toward the worse direction and the degradation of engine performance by inlet distortion was verified.

  • PDF

A Study on Implementation of Automatic Evaluation System for Static Performance of 6 DOF MEMS Inertial Sensor (6자유도 MEMS 관성센서 정적성능 자동 평가 시스템 구현에 관한 연구)

  • Ji Won Park;Hussamud Din;Byeung Leul Lee
    • Journal of the Semiconductor & Display Technology
    • /
    • v.22 no.3
    • /
    • pp.62-66
    • /
    • 2023
  • With the advancement in technology and rapid increase in the demand for microelectromechanical systems (MEMS) based inertial measurement units (IMUs), high-volume production and test system remain a major challenge for the MEMS industry. To compete with the challenging market of Industry 4.0, here we developed an automatic test system to evaluate the performance of the ovenized IMU sensors as well as analyze the data. The automatic test system was developed by interfacing a commercial MEMS IMU (BMI 088) using LabVIEW. The BMI 088 was tested experimentally for long-term bias stability, ON/OFF bias repeatability, and root mean square (rms) noise. Furthermore, the data was analyzed through the developed test system. The results show that the automatic test system has improved the test time and reduced human effort. The developed automatic test system is a significant approach to MEMS research and development (R&D) to increase and improve the mass production of IMUs.

  • PDF