• 제목/요약/키워드: System lifecycle

검색결과 242건 처리시간 0.024초

노후 학교건물의 유지관리비용 정책 평가를 위한 시스템 다이내믹스 모델 (A System Dynamics Model for Evaluation of Maintenance Cost Policy in Deteriorated School Building)

  • 강수현;김상용
    • 대한건축학회논문집:구조계
    • /
    • 제35권12호
    • /
    • pp.181-188
    • /
    • 2019
  • The maintenance of school building is pivotal issue. However, it is difficult to obtain basic analysis data for LCC(Lifecycle Cost) analysis and maintenance planning of school building. Therefore, this study proposed System Dynamics(SD) techniques to make maintenance decisions for school building. The interaction between the major parameters related to the aging of a building, maintenance activities, and cost were expressed in Causal Loop Diagram. Based on this, the formula for the relationship between causal maps was defined and converted to Stock and Flow Diagram. Through the completed SD model the 50-year plan of 214 educational building were tested by considered in account budget, maintainability, and budget allocation opinions. As a result, the integrated SD model demonstrated that it can support strategic decision making by identifying the status class and LCC behavior of school buildings by scenario. According to the scenario analysis, the rehabilitation action of preventive maintenance that primarily repairs the buildings in condition grade C showed the best performance improvement effect relative to the cost. Therefore, if the proposed SD model is expanded to consider the effects of other educational policies, the crucial performance improvement budget can be estimated in the long-term perspective.

선박 건조 공정 시뮬레이션을 위한 모델링 방법론 및 시스템 아키텍처 (Simulation Modeling Methodology and Simulation System Architecture for Shipbuilding Processes)

  • 오대균;이춘재;최양렬;신종계;우종훈
    • 한국CDE학회논문집
    • /
    • 제11권1호
    • /
    • pp.11-19
    • /
    • 2006
  • For several years, a research about the simulation for shipyard and shipbuilding has been performed. This research is based on the concept of PLM (Product Lifecycle Management) and DM (Digital Manufacturing). Global leading companies and research center are trying to get a good position of PLM, especially M&S field. Digital shipbuilding is to computerize shipyard facilities and shipbuilding processes, and to simulate expected scenarios of shipbuilding processes using a computer model in order to resolve a potential problem such as a bottleneck processes, and over loaded resources. In this paper, simulation methodology for shipbuilding is described. In addition, a local and global strategy for the use of simulation methodology is suggested. Finally, case studies about an indoor shop and an outdoor shop are described.

사양 기반 플랜트 설계 시스템에서 생성된 원자력 플랜트 설계 데이터의 중립 모델로의 통합 변환 (An Integrated Translation of Nuclear Power Plant Design Data ftom Specification-driven Plant Design Systems to a Neutral Product Model)

  • 문두환;양정삼;한순흥
    • 한국CDE학회논문집
    • /
    • 제14권2호
    • /
    • pp.96-104
    • /
    • 2009
  • It gradually becomes important to study on how to efficiently integrate and manage plant lifecycle data such as 2D schematic and 3D solid data, logical configuration data, and equipment specifications data. From this point of view, converting plant design data from various systems into neutral data independent from any commercial systems is one of important technologies for the operation and management of plants which usually have a very long period of life. In order to achieve this goal, a neutral model for efficient integration and management of plant data was defined. After schema mapping between one of specification-driven plant design systems and the neutral model was performed, a plant data translator is also implemented according to the mapping result. Finally, by experiments with nuclear power plant design, the feasibility of the translator was demonstrated.

토목 프로젝트를 위한 CPLM 시스템의 테스트 베드 (Testbed of CPLM System for Civil Projects)

  • 이창우;강형석;한송이;조제헌;이광명;노상도
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.99-102
    • /
    • 2011
  • 본 논문에서는 토목 프로젝트를 효과적으로 수행하고자 개발된 CPLM(Construction Project Lifecycle Management) 시스템을 현재 진행 중인 교량 건설 프로젝트에 적용함으로써 실제 토목 프로젝트의 전주기에 걸쳐 CPLM 시스템의 활용 가능성과 효율성을 검토하였다. 테스트베드 대상은 ${\bigcirc}{\bigcirc}{\bigcirc}$대교의 Ramp A 구간과 주경간 교량의 주탑이며, 적용 절차는 대상에 대한 정보 모델을 구축하고 CPLM 시스템을 통한 참여 조직간 협업을 수행함으로써 시스템의 효율성 및 활용성을 도출하는 과정으로 이루어졌다. 본 연구를 통해 보다 효과적인 토목 프로젝트 관리를 위한 CPLM 시스템의 개선안을 도출하고, 토목 프로젝트의 효율적 수행을 위한 방향을 제시하였다.

  • PDF

메타데이터 상호운용성을 위한 기록관리 메타데이터 표준 분석 5W1H와 태스크 모델의 관점에서 (Analysis of Metadata Standards of Record Management for Metadata Interoperability From the viewpoint of the Task model and 5W1H)

  • 백재은;스기모토 시게오
    • 기록학연구
    • /
    • 제32호
    • /
    • pp.127-176
    • /
    • 2012
  • 메타데이터 표준규격(이하 메타데이터 표준으로 기재)은 디지털 자원(Digital resource)의 장기보존 및 디지털 아카이브를 위해 필요한 기본 요소 중 하나로, 이는 현대 정보사회에서 중요한 요소로 잘 알려져 있다. 자원(Resource)의 기록관리와 아카이브, 장기보존을 위한 메타데이터 표준은 다양하며, AGRkMS, EAD, ISAD(G), OAIS, PREMIS5) 등이 이용되고 있다. 우리는 아카이브 시스템의 메타데이터 표준을 디자인하기 위해 목적에 따른 메타데이터 표준을 선택하고 맞춤화(Customization)하지 않으면 안 된다. 한편으로, 다른 시스템의 메타데이터 스키마와의 상호운용성(Interoperability)에 대한 고찰도 실시하지 않으면 안 된다. 이전 연구에서, 우리는 기록 생애 주기(Records lifecycle)라는 관점으로부터 메타데이터 표준의 특성에 대해 분석을 실시하였다. 이로 인해, 각 메타데이터 표준 요소가 해당하는 기록 생애 주기의 처음 단계를 확인할 수 있었고, 아카이브 혹은 보존을 위해서는 하나의 메타데이터 표준만으로 기록 생애 주기 전체를 포괄할 수 없다는 것을 보여 주었다. 우리는 이 분석을 통해서 기록 생애 주기의 단계와 메타데이터 표준간의 관계, 기록 생애 주기 전체에서의 메타데이터 특성은 볼 수 있었으나, 보다 상세한 분석을 실시하는 것은 앞으로의 과제로 남겨두었다. 지금까지의 연구에 근거하여, 본 논문은 기록 생애 주기의 관점에서 디지털 아카이브와 보존, 기록관리를 위한 메타데이터 표준의 특징 분석을 위해, 기록 생애 주기 안에서 실행되는 업무의 관점으로부터 메타데이터 스키마를 재 파악하고 분석하였다. 지금까지 메타데이터 스키마는 기술대상이 되는 자원을 중심으로 정의되었기 때문에 기록 생애 주기 전체와 생애 주기 안의 각 단계에서 이용되는 메타데이터 표준간의 매핑을 위한 적절한 방법이 없었다. 이에 본 논문에서는 각기 다른 메타데이터 표준의 기술 요소를, 기록 생애 주기에 포함시키는 업무와 연결시키는 것으로 메타데이터 표준간의 매핑 방법을 제안한다. 본 연구에서는 메타데이터 표준 분석을 위한 프레임워크(Framework)로, 기록 생애 주기를 이용하여 작성한 자원의 업무중심 모델, 즉 태스크 모델(Task Model)을 제안한다. 태스크 모델을 이용함에 있어서 업무를 실행하는 '이벤트(Event)'의 관점을 보다 명확하게 할 수 있다. 한편, 업무를 중심으로 기술 요소간의 매핑을 보다 효율적으로 실시하기 위해서는 요소를 카테고리 화하여 매핑의 대상 범위를 좁히는 것이 중요하다. 이를 위해 우리는 범용성을 가진 5W1H모델(Who, What, Why, When, Where, How)을 이용하여, 기술 요소를 카테고리 화 하는 것을 제안한다. 그리고 태스크 모델과 5W1H 모델을 이용하여 메타데이터 표준 요소에 특징을 부여하고, 요소 간의 매핑을 실시하여 표준 간 관계를 확인하였다. 태스크 모델은 기록 생애 주기 전체에 업무의 관점을 반영한 것으로, 이 모델을 이용함으로써 기록 생애 주기와 그 안의 각 업무에 대한 메타데이터 표준의 사용, 그리고 특징 분석을 위해 실시되는 기술 요소간의 매핑이 가능할 수 있었다. 또한, 5W1H 카테고리를 이용하여 업무와 자원에 관련되는 기술 요소간의 관계를 살펴보는 것으로, 관계가 명확해지는 것과 함께 조사대상을 좁히는 것이 가능하게 되었다. 이 프레임워크의 제안과 이용으로 우리는 특징 분석을 위해 실시되는 매핑 혹은 분류가 단순한 일반적인 매핑이 아닌 의미적인 분류를 할 수 있었다. 본 연구에서는 이 모델들을 이용하여, 메타데이터 표준간의 크로스워크를 정의하였다. 그리고 태스크 모델의 각 단계의 문맥 내에서 메타데이터 기술 요소의 특성을 매핑 예로 확인하고, 이를 바탕으로 하여 프레임워크에 대해 고찰하였다.

ERP 내재화 평가 프레임워크에 관한 연구 (Evaluation Framework for Routinization of ERP)

  • 김종일;황경태
    • 한국IT서비스학회지
    • /
    • 제16권4호
    • /
    • pp.77-97
    • /
    • 2017
  • ERP is an essential information system (IS) that many companies are operating on the basis of this solution. Since ERP is a very important system that is used in business operation and provides quantified information about the efficiency and productivity of the business activities, difference of competitiveness between companies that have successfully implemented ERP and those that do not have is very large. According to a survey done by a global consulting firm, far less than half of the companies are evaluated as successfully internalizing ERP into their organizations. Therefore, there is a need for an accurate assessment of ERP usage and an improvement of ERP based on it and the need become to increase largely. However, in reality, there is neither the systematic evaluation methods or any research about this topic. This study proposes a framework for evaluating the routinization of ERP throughout the life cycle of the ERP based on both the literature in the enterprise architecture, ERP lifecycle, ERP success areas, and actual experience of the authors in ERP implementation. The proposed framework intends to satisfy the following functional requirements : 1) the entire lifecycle of ERP should be evaluated; 2) evaluation of ERP should be performed from the enterprise-wide perspective; 3) evaluation should focus on the core activities of the organization; and objective evaluation criteria should be used in the evaluation.

생애주기별 지원체계에 관한 국가 간 비교연구 (Support System over the Lifecycle: A Cross-Country Comparison)

  • 이상협
    • KDI Journal of Economic Policy
    • /
    • 제35권1호
    • /
    • pp.33-61
    • /
    • 2013
  • 본 논문의 목적은 생애별 지원체계를 국가별로 비교하고, 거기서 경제성장과 정부재정의 지속성에 대한 함의를 도출해 내는 데 있다. 가족지원체계는 점차 그 중요성이 줄어듦에도 불구, 한국을 비롯한 몇몇 아시아 국가에서 유의하게 나타났다. 공공지원체계(사회보장)의 경우 한국은 OECD 국가 내에서 매우 낮은 수준을 보였는데, 이러한 낮은 사회보장이 높은 저축률과 자본축적에 기여한 긍정적인 측면은 인정된다. 하지만 지난 10년 동안 한국에서의 사회보장은 매우 빠른 속도로 변화하였다. 한국의 자본시장과 노동시장이 이러한 변화에 어떻게 반응하는 가가 향후 정부의 정책방향을 결정하는 데 중요한 요인이 될 것이다.

  • PDF

PLM 시스템 활용도 향상 방안의 중요도에 관한 연구 (A Study on the Importance of Measures for Improving PLM System Usage)

  • 유종광;임성택;민대환
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제31권1호
    • /
    • pp.239-269
    • /
    • 2022
  • Purpose This paper attempts to identify items for improving the usage of PLM(Product Lifecycle Management) systems and suggests ways to prioritize improvement items on the basis of importance. It also tries to find out differences in the importance of improvement items due to the company size, the industry, the job, or the PLM solution. Design/methodology/approach Through a survey from participants to a PLM System Conference, data were collected from a sample of 181 users who had the previous experience in using a PLM system. In order to figure out the differences in the importance among user groups, the F-test with the Scheffe test as a post-hoc analysis was used in case of equal variances and the Welch test with the Dunnett T3 test was used in case of unequal variances. Findings This study sorted out 25 improvement ideas according to their importance assessed by the PLM system users. The top five ideas are improving data consistency, error minimization, fast system response time, enhancing user recognition, and business process improvement. The support group puts higher importance than the general user group in data consistency, fast system response time, enhancing user recognition, business process improvement, dedicated team for data consistency, continuous support from management, hardware performance upgrade, output linkage to other systems, and shortening problem solving duration. The largest company group attaches significantly higher weights than the smallest company group to data consistency, error minimization, fast system response time, business process improvement, dedicated team for data consistency, security with proper access management, output linkage to other systems, and better user interface.

RUP 기반 CIS 소프트웨어 개발 프로세스 (A Software Development Process of Core Instrumentation System Based on the Rational Unified Process)

  • 이길섭;이태공
    • 인터넷정보학회논문지
    • /
    • 제5권4호
    • /
    • pp.95-113
    • /
    • 2004
  • RUP(Rational Unified Process) 객체 지향적이며 사용사례 및 아키텍처 중심의 반복적인 개발방법론이다. 이전에 수행된 대부분 공공분야의 대규모 소프트웨어 개발은 폭포수형 개발 프로세스를 적용하였으나 최근에는 소프트웨어 개발에 따른 위험을 최소화 하고 품질을 향상하기 위하여 RUP와 같은 반복 개발방법의 적용을 시도하고 있다. 그러나 대규모 복합 체계의 개발 프로세스와 그 일부인 소프트웨어 개발 프로세스로서 RUP를 적용한 국내의 연구 자료는 미흡한 실정이다. 본 논문에서는 RUP를 기반으로 복합 체계의 일부인 소프트웨어를 개발하는 프로세스를 고찰하고자 한다. 이를 위하여 국내 CIS 소프트웨어 개발 사례를 통하여 체계개발 프로세스와 통합된 RUP프로세스를 제시하고 기존의 폭포수형 프로세스 및 RUP와 비교 경가론 한다. 된 논문의 연구결과는 공공기관에서 대규모 복합체계의 소프트웨어를 개발하는 경우에 RUP 기반 프로세스의 조정, 개발관리에 있어서 위헌의 최소화와 최종 제품의 품질향상에 기여한 것으로 믿는다.

  • PDF

시스템엔지니어링을 적용한 ISEP 개발에 관한 연구 (Development of the ISEP Based on Systems Engineering)

  • 변보석;최요철;박영택
    • 품질경영학회지
    • /
    • 제41권4호
    • /
    • pp.725-735
    • /
    • 2013
  • Purpose: The purpose of this study is to propose an Integrated Safety Evaluation Process (ISEP) that can enhances the safety aspect of the safety-critical system. This process utilizes the advantages of the iterative Systems Engineering process combined with the safety assessment process that is commonly and well defined in many standards and/or guidelines for railway, aerospace, and other safety-critical systems. Methods: The proposed process model is based on the predefined system lifecycle, in each phase of which the appropriate safety assessment activities and the safety data are identified. The interfaces between Systems Engineering process and the safety assessment process are identified before the two processes are integrated. For the integration, the elements at lower level of Systems Engineering process are combined with the relevant elements of safety assessment process. This combined process model is represented as Enhanced Functional Flow Block Diagram (EFFBD) by using CORE(R) that is commercial modelling tool. Results: The proposed model is applied to the lifecycle and management process of the United States aircraft system. The US aircraft systems engineering process are composed of twelve key elements, among which the requirements management, functional analysis, and Synthesis processes are considered for examplenary application of the proposed process. To synchronize the Systems Engineering process and the safety assessment process, the Systems Engineering milestones are utilized, where the US aircraft system has thirteen milestones. Taking into account of the nine steps in the maturity level, the integrated process models are proposed in some phases of lifecycle. The flows of processes are simulated using CORE(R), confirming the flows are timelined without any conflict between the Systems Engineering process and the safety assessment process. Conclusion: ISEP allows the timeline analysis for identifying activity and data flows. Also, the use of CORE(R) is shown to be effective in the management and change of process data, which helps for the ISEP to apply for the development of safety critical system. In this study, only the first few phases of lifecyle are considered, however, the implementation through operation phases can be revised by combining the elements of safety activities regarding those phases.