• 제목/요약/키워드: System Performance Test

검색결과 7,390건 처리시간 0.036초

외기 전용 공조기의 성능 분석 및 현장 성능시험 (The Performance Analysis and On-site Performance Test of a Dedicated Outdoor Air System)

  • 김영일;김정민;정광섭;박승태
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.346-351
    • /
    • 2007
  • Dedicated outdoor air(DOA) system which conditions the outdoor air separately is superior to conventional cooling+reheating system with respect to energy consumption and indoor comfort. Since the sensible and latent load characteristics of indoor and outdoor are different, it is more efficient to treat them separately. In this study, cycle analysis and on-site performance test of DOA system have been conducted. The study shows that DOA requires 48.8% less equivalent energy that conventional system. The on-site performance test of the prototype shows that the coefficient of performance(COP) of the DOA system is 37.4% higher than the conventional system.

  • PDF

PSD 설계를 위한 성능 시험장치 (Performance Test System for PSD Design)

  • 고광웅;이한주;정동운;이상용;오승협
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2003년도 제20회 춘계학술대회 논문집
    • /
    • pp.119-122
    • /
    • 2003
  • In this Study, the types of PSD performance test systems were reviewed. And as a results of that reviewing process, a suitable PSD performance test system type for PSD design was proposed. PSD performance test systems can be classified with pulsating methods - the pulsating whole feeding system and the pulsating working fluid. The pulsating working fluid method can be re-classified with the devices of pulsating working fluid - a piston-type pulsator and a restrict-type pulsator. The pulsating-working-fluid performance test system with restrict-type pulsator was proposed to be a suitable type for identification of main-design-parameters.

  • PDF

터보펌프 Cavitation 성능시험기 개발 및 성능시험에 관한 연구 (Development of Turbopump Cavitation Performance Test Facility and the Test of Inducer Performance)

  • 손동기;김춘택;윤민수;차봉준;김진한;양수석
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집E
    • /
    • pp.619-624
    • /
    • 2001
  • A performance test facility for turbopump inducer cavitation was developed and the inducer cavitation performance tests were performed. Major components of the performance test facility are driving unit, test section, piping, water tank, and data acquisition and control system. The maximum of testing capability of this facility are as follows: flow rate - 30kg/s; pressure - 13 bar; rotational speed 10,000rpm. This cavitation test facility is characterized by the booster pump installed at the outlet of the pump that extends the flow rate range, and by the pressure control system that makes the line pressure down to vapor pressure. The vacuum pump is used for removing the dissolved air in the water as well as the line pressure. Performance tests were carried out and preliminary data of test model inducer were obtained. The cavitation performance test and cavitation bubble flow visualization were also made. This facility is originally designed for turbopump inducer performance test and cavitation test. However it can be applied to the pump impeller performance test in the future with little modification.

  • PDF

철도차량 검측모듈의 신뢰성 검증 시험 연구 (A Study of Inspection Module for Verifying Reliability on Railway Vehicle)

  • 나경민;박영;권삼영
    • 전기학회논문지
    • /
    • 제66권7호
    • /
    • pp.1155-1161
    • /
    • 2017
  • This study examines environmental performance of the arcing measurement module according to international standards. The module assesses the collected current performance using a computer system. The module is required to assess environmental impact resulting from electromagnetic waves, shock and temperature change during train operation. The test includes testing EMI/EMC, vibration, shock and temperature cycling for interface between trains and the arcing measurement module. The module test items were determined in compliance with the standards suggested by the International Electrotechnical Commission (IEC) and Europaische Norm (EN). This study describes the method of test, test equipment operation and how to choose relevant performance standards. The analysis and test results of environmental performance for the module based on computer system are described in this study.

옥상용 합성고분자 시트를 애용한 지붕노출 시스템 적용에 관한 연구 (A Study on Application of Exposure System using Waterproofing Sheets of Synthetic Polymer for Rooftop)

  • 이상수;김수련;곽규성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.179-183
    • /
    • 2005
  • In apply roof waterproof system using of synthetic high polymer sheet for rooftop measure physical performance (tension$\cdot$tearing ability, temperature relativity, heating stretch performance, junction performance, wind resistance test) by various test environment condition waterproof test of structure and performance of construction work aspect, present suitable form of construction work under these environment. Also, wish to improve durability of concrete structure as that examine in priority about adhesion method and joint junction method with waterproof out surface, and present new direction about roof system application of waterproofing method for rooftop.

  • PDF

석고 패널이 부착된 천장 시스템의 내진성능 평가를 위한 3축 진동실험 (Triaxial Shake Table Test about Seismic Performance of Ceiling System with Gypsum Panels)

  • 박해용;전법규;김재봉;김민욱
    • 대한건축학회논문집:구조계
    • /
    • 제35권10호
    • /
    • pp.143-153
    • /
    • 2019
  • In this study, a full scale 3-axes shake table test for M-bar and T-bar type ceilings commonly used in the country was conducted. Through damage inspection during the test, seismic performance of ceilings according to variables, such as clearance between wall mold and ceiling as well as existence of facilities, was evaluated. A test frame consisted of square hollow section members was used for the shake table test. The experimental method was performed as a fragility test using required response spectrum described in ICC-ES AC156. In the case of architectural nonstructural component that contain ceilings, it mainly is evaluated the performance by post-test visual inspection. For the evaluation of seismic performance of ceilings, this study classified and defined damaged items for targeted ceiling system referring to illustrative damage according to nonstructural performance levels accordance with ASCE 41 and previous studies. And proposed illustrative damage items classification was utilized to compare the degree of the damage according to experimental variables. The experiment results confirmed that differences in boundary conditions due to the clearance at wall mold and the installation of facilities had a significant effect on the seismic performance of the ceiling.

한국형 전술데이터링크(Link-K)의 무선통신 시험환경 구성 및 다중접속 프로토콜 성능분석 (The Implementation of Wireless Communication Test Environment for the Link-K System and Performance Analysis of Multiple Access Protocols)

  • 권구형
    • 한국군사과학기술학회지
    • /
    • 제12권2호
    • /
    • pp.170-174
    • /
    • 2009
  • This paper describes the wireless communication test environment for the Link-K system and shows the performance analysis of multiple access protocols. The test environment consists of data generator, modem, radio sets, attenuators, and antennas. In case of both CSMA and Roll-Call protocols, throughput performance and delay are measured. And test results are analyzed. The test results would be used for communication performance analysis and network design of Link-K system.

GIS 예방진단시스템 주파수 분석장치 성능개선 및 검증 (Performance verification and improvement of the frequency analysis unit for GIS Preventive & Diagnostic Monitoring System)

  • 김원규;김민수;백영식
    • 전기학회논문지
    • /
    • 제64권3호
    • /
    • pp.485-491
    • /
    • 2015
  • This paper shows the design improvement and test model of FAU (Frequency Analysis Unit) in PDD (Partial Discharge Diagnosis system) for 800kV GIS (Gas Insulated Switchgear). We found some problems during operation of previous FAU, such as the aging of fiber-optic converter that can cause communication error, the malfunction of signal analysis circuit etc. And then we solved those problems by design improvement and verified the performance through type test. To monitor partial discharge, the performance of UHF sensor is important but the performance of frequency analysis unit is also very important. So we solved communication error, the malfunction of signal analysis circuit and then increased the operation reliability of FAU by improving fiber-optic converter and signal analysis circuit. Accredited testing laboratory carried out the performance verification test according to performance test criteria and procedure of reliability test standards, IEC-60225, 61000 and 60068 etc. We confirmed the test results which correspond with the performance test criteria.

RTDS 시험모듈을 이용한 태양광 인버터의 성능시험에 관한 연구 (A Study on Performance Test of a Photovoltaic System Inverter using Real Time Digital Simulator (RTDS))

  • 김응상;김슬기;전진홍;안종보
    • 전기학회논문지
    • /
    • 제56권2호
    • /
    • pp.325-333
    • /
    • 2007
  • A PV system inverter test module using RTDS was developed and performance test of a commercial PV inverter was carried out. The developed module consists of one RTDS hardware rack, RTDS software models representing PV array and simple distribution system, and two power amplifiers that was specifically designed for generating power corresponding to signals from RTDS. Performance test results verified effectiveness and reliability of the test module. It is expected that the developed test module may help PV inverter manufacturers improve ana test their systems in the developing stage.

Reliability Design Based on System Performance-Cost Trade-off for Manufacturing facility

  • Hwang, Heung-Suk;Hwang, Gyu-Wan
    • International Journal of Reliability and Applications
    • /
    • 제2권4호
    • /
    • pp.269-280
    • /
    • 2001
  • The objective of this paper is to provide a model for effective implementation of costing RAM management in the design and procurement of production facility considering the system cost-performance trade-off. This research proposes a two-step approach of costing RAM design and test of system RAM for production facility. In Step 1, a static model is proposed to find an initial system configuration to meet the required performance based on system RAM and LCC and analyzes the trade-off relationships between various factors of RAM and LCC. In the second Step, we developed time and failure truncated models for system reliability test and analysis. For the computational purpose, we developed computer programs and have shown the sample results. By the sample test run, the proposed model has shown the possibilities to provide a good method to analyze system performance evaluation for both design and operational phase, This model can be applied to a wide variety of systems not only for costing RAM of the production facilities but also for the other kinds of equipment.

  • PDF