• Title/Summary/Keyword: System Lifecycle Process

Search Result 101, Processing Time 0.024 seconds

A Standard Way of Constructing a Data Warehouse based on a Neutral Model for Sharing Product Dat of Nuclear Power Plants (원자력 발전소 제품 데이터의 공유를 위한 중립 모델 기반의 데이터 웨어하우스의 구축)

  • Mun, D.H.;Cheon, S.U.;Choi, Y.J.;Han, S.H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.1
    • /
    • pp.74-85
    • /
    • 2007
  • During the lifecycle of a nuclear power plant many organizations are involved in KOREA. Korea Plant Engineering Co. (KOPEC) participates in the design stage, Korea Hydraulic and Nuclear Power (KHNP) operates and manages all nuclear power plants in KOREA, Dusan Heavy Industries manufactures the main equipment, and a construction company constructs the plant. Even though each organization has a digital data management system inside and obtains a certain level of automation, data sharing among organizations is poor. KHNP gets drawing and technical specifications from KOPEC in the form of paper. It results in manual re-work of definition and there are potential errors in the process. A data warehouse based on a neutral model has been constructed in order to make an information bridge between design and O&M phases. GPM(generic product model), a data model from Hitachi, Japan is addressed and extended in this study. GPM has a similar architecture with ISO 15926 "life cycle data for process plant". The extension is oriented to nuclear power plants. This paper introduces some of implementation results: 1) 2D piping and instrument diagram (P&ID) and 3D CAD model exchanges and their visualization; 2) Interface between GPM-based data warehouse and KHNP ERP system.

Study on ISA's assessment to software process for EN50128 SIL4 (EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구)

  • Cho, Chi-Hwan;Kang, Chan-Yong;Hwang, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF

A study for production simulation model generation system based on data model at a shipyard

  • Back, Myung-Gi;Lee, Dong-Kun;Shin, Jong-Gye;Woo, Jong-Hoon
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.8 no.5
    • /
    • pp.496-510
    • /
    • 2016
  • Simulation technology is a type of shipbuilding product lifecycle management solution used to support production planning or decision-making. Normally, most shipbuilding processes are consisted of job shop production, and the modeling and simulation require professional skills and experience on shipbuilding. For these reasons, many shipbuilding companies have difficulties adapting simulation systems, regardless of the necessity for the technology. In this paper, the data model for shipyard production simulation model generation was defined by analyzing the iterative simulation modeling procedure. The shipyard production simulation data model defined in this study contains the information necessary for the conventional simulation modeling procedure and can serve as a basis for simulation model generation. The efficacy of the developed system was validated by applying it to the simulation model generation of the panel block production line. By implementing the initial simulation model generation process, which was performed in the past with a simulation modeler, the proposed system substantially reduced the modeling time. In addition, by reducing the difficulties posed by different modeler-dependent generation methods, the proposed system makes the standardization of the simulation model quality possible.

An Implementation Enterprise BOM for Marine Vessel of Pipe Equipment (선박 배관 설계를 위한 Enterprise BOM의 설계와 구현)

  • Kim, Seung-Hyun;Lee, Jang-Hyun;Kim, Kwang-Sik;Jeon, Jung-Ik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.1
    • /
    • pp.41-51
    • /
    • 2011
  • Both enterprise information systems and CAD utilizes the BOM (Bill of Material) as the means of collaborative integration during the product design and production since the BOM has been commonly used for design, production planning, procurement, and production works. Therefore, BOM can be the referential data when it expresses not only the part lists but also product information required by product development process. Outfitting design is one of major design works in marine vessel design since marine vessels have various outfitting systems and huge number of parts. Also, the outfitting BOM has the evolutional forms that change from the initial design to the production design. In order to express the product information and part list in the enterprise BOM and the evolutional BOMs in each lifecycle, enterprise BOM of outfitting that consists of structure BOM and display BOM is suggested. Thereafter, we have developed the prototype of enterprise BOM in which some features of the outfitting BOM are implemented.

Classification of Ontology Integration and Ontology-based Semantic Integration of PLM Object (온톨로지 통합 분류와 온톨로지 기반의 PLM Object 의미적 통합)

  • Kwak, Jung-Ae;Yong, Hwan-Seung;Choi, Sang-Su
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.3
    • /
    • pp.163-174
    • /
    • 2008
  • In this paper, for integrating of data on car parts we model information of parts that PDM system manages. Ontology of car parts applies existing ontology mapping research to integrate into car ontology. We propose a method for semantic integration of PLM object of MEMPHIS based on the integrated ontology. Through our method, we introduce C# ontology model to apply existing C# applications with ontology. We also classify ontology integration into three through examples and explain them. While semantically integrating PLM objects based on the integrated ontology, we explain the need for change of PLM object type and describe the process of change for PLM object type by examples.

Agile Software Development Framework in a Small Project Environment

  • Lee, Seiyoung;Yong, Hwan-Seung
    • Journal of Information Processing Systems
    • /
    • v.9 no.1
    • /
    • pp.69-88
    • /
    • 2013
  • Agile methods are highly attractive for small projects, but no agile method works well as a standalone system. Therefore, some adaption or customization is always required. In this paper, the Agile Framework for Small Projects (AFSP) was applied to four industry cases. The AFSP provides a structured way for software organizations to adopt agile practices and evaluate the results. The framework includes an extended Scrum process and agile practices, which are based on agility and critical success factors in agile software projects that are selected from Scrum, XP, FDD, DSDM and Crystal Clear. AFSP also helps software managers and developers effectively use agile engineering techniques throughout the software development lifecycle. The case study projects were evaluated on the basis of risk-based agility factors, the agility of the adopted practices, agile adoption levels, and the degree of the agile project success. The analysis of the results showed that the framework used in the aforementioned cases was effective.

Long-Term Demand Forecasting Using Agent-Based Model : Application on Automotive Spare Parts (Agent-Based Model을 활용한 자동차 예비부품 장기수요예측)

  • Lee, Sangwook;Ha, Chunghun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.1
    • /
    • pp.110-117
    • /
    • 2015
  • Spare part management is very important to products that have large number of parts and long lifecycle such as automobile and aircraft. Supply chain must support immediate procurement for repair. However, it is not easy to handle spare parts efficiently due to huge stock keeping units. Qualified forecasting is the basis for the supply chain to achieve the goal. In this paper, we propose an agent based modeling approach that can deal with various factors simultaneously without mathematical modeling. Simulation results show that the proposed method is reasonable to describe demand generation process, and consequently, to forecast demand of spare parts in long-term perspective.

A Method to Specify and Verify Requirements for Safety Critical System (안전 필수 시스템을 위한 요구사항 명세 및 검증 방법)

  • Lim, Hye Sun;Lee, Seok-Won
    • Journal of KIISE
    • /
    • v.44 no.9
    • /
    • pp.893-907
    • /
    • 2017
  • In safety-critical systems, software defects may have serious consequences. Therefore, defects should be considered during the requirements specification process, which is the first step of a software development lifecycle. Stakeholder requirements that are usually written in natural language are difficult to derived, and there may also be defects due to ambiguity and inaccuracy. To address these issues, we propose a requirement specification method using a standardized Boilerplate and a GSN Model. The Boilerplate is a semi-standard language that follows a predefined format. Due to its ability to provide a consistent representation of the requirements, boilerplate helps stakeholders avoid ambiguities about what they mean and to define the exact meaning of the requirement. Meanwhile, GSN is recognized notation to prepare a Safety Case to prove to authorities that a system is safe. It can be expressed as a functional goal, e.g., Safety Evidence, etc. The proposed study allows an analyst to easily identify a fault from the early stage of the software development lifecycle. The Boilerplate and GSN Model are designed to specify the requirements of safety critical systems and to prove safety conformity through a connection with Safety Evidence. In addition, the proposed approach is also useful to develop secure software by correcting deficiencies in the requirements found during this process.

A Study on Application Methodology of SPDL Based on IEC 62443 Applicable to SME Environment (중소기업환경에서 적용 가능한 IEC 62443 기반의 개발 보안 생애주기 프로세스 적용 방안 연구)

  • Jin, Jung Ha;Park, SangSeon;Kim, Jun Tae;Han, Keunhee
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.6
    • /
    • pp.193-204
    • /
    • 2022
  • In a smart factory environment in a small and medium-sized enterprise (SME) environment, sensors and actuators operating on actual manufacturing lines, programmable logic controllers (PLCs) to manage them, human-machine interface (HMI) to control and manage such PLCs, and consists of operational technology server to manage PLCs and HMI again. PLC and HMI, which are in charge of control automation, perform direct connection with OT servers, application systems for factory operation, robots for on-site automation, and production facilities, so the development of security technology in a smart factory environment is demanded. However, smart factories in the SME environment are often composed of systems that used to operate in closed environments in the past, so there exist a vulnerable part to security in the current environment where they operate in conjunction with the outside through the Internet. In order to achieve the internalization of smart factory security in this SME environment, it is necessary to establish a process according to the IEC 62443-4-1 Secure Product Development Life cycle at the stage of smart factory SW and HW development. In addition, it is necessary to introduce a suitable development methodology that considers IEC 62443-4-2 Component security requirements and IEC 62443-3 System security requirements. Therefore, this paper proposes an application plan for the IEC 62443 based development security process to provide security internalization to smart factories in an SME environment.

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.