1 |
Alfeld, L.E., Pilliod, C.S., Wilkins, J.R., 1998. The virtual shipyard: a simulation model of the shipbuilding process. J. Ship Prod. 14 (1), 33-40.
|
2 |
Back, M.G., Kim, Y.G., Hwang, I.H., Lee, K.K., Ryu, C.H., Shin, J.G., 2013. Design and development of scenario-based simulation system to improve shipbuilding execution scheduling assessment : a case study on panel line. Trans. Soc. CAD/CAM Eng. 18 (3), 211-223.
|
3 |
Harward, G., Harrell, C., 2006. Assessment of the NIST shop data model as a neutral file format. In: Proceedings of the 2006 Winter Simulation Conference, Monterey, USA, pp. 941-946.
|
4 |
Hwang, I.H., Song, J.K., Back, M.G., Ryu, C.H., Lee, K.K., Shin, J.G., 2013. Development of shipbuilding execution scheduling support system using mobile device : a case study for a panel block assembly shop. J. Soc. Nav. Archit. Korea 50 (4), 262-271.
DOI
|
5 |
Johansson, M., Johansson, B., Sjoogh, A., Leong, S., Riddick, F., Lee, Y.T., Shao, G., Klingstam, P., 2007. A test implementation of the core manufacturing simulation data specification. In: Proceedings of the 2007 Winter Simulation Conference, Washington, USA, pp. 1673-1681.
|
6 |
Kang, H.S., 2007. A Study on the Automated Generation of Simulation Model Based on PPR Information. Dissertation. Sungkyunkwan University.
|
7 |
Lee, C.J., Lee, J.H., Woo, J.H., Shin, J.G., Ryu, C.,H., 2007. A study on discrete event simulation of shipyard outdoor block movement. J. Soc. Nav. Archit. Korea 44 (6), 647-656.
DOI
|
8 |
Lee, D.K., Back, M.G., Lee, K.K., Park, J.S., Shin, J.G., 2013. Study on simulation model generation of a shipyard panel block shop using a neutral data format for production information. J. Soc. Nav. Archit. Korea 50 (5), 314-323.
DOI
|
9 |
Lee, D.K., Kim, Y.M., Hwang, I.H., Oh, D.K., Shin, J.G., 2014. Study on a process-centricmodelingmethodology for virtual manufacturing of ships and offshore structures in shipyards. Int. J. Adv. Manuf. Technol. 71, 621-633.
DOI
|
10 |
Lee, J.H., Kim, S.H., Lee, K.H., 2011a. Integration of evolutional BOMs for design of ship outfitting equipment. Comput. Aided Des. 44 (3), 253-273.
DOI
|
11 |
Lee, J.Y., Kang, H.S., Noh, S.D., Woo, J.H., Lee, P.L., 2011b. NESIS: a neutral schema for a web-based simulation model exchange service across heterogeneous simulation software. Int. J.Comput. Integr.Manuf. 24 (10), 948-969.
DOI
|
12 |
Lu, R.F., Qiao, G., McLean, C., 2003. Nist XML simulation interface specification at boeing : a case study. In: Proceedings of the 2003 Winter Simulation Conference, LA, USA, pp. 1230-1237.
|
13 |
Oh, D.K., Shin, J.G., Choi, Y.R., Yao, Y.H., 2009. Development of a naval ship product model and management system. J. Soc. Nav. Archit. Korea 46 (1), 43-56.
DOI
|
14 |
Song, Y.J., Lee, D.G., Choe, S.W., Shin, J.G., 2009. A simulation-based capacity analysis of a block-assembly process in ship production planning. J. Soc. Nav. Archit. Korea 46 (1), 78-86.
DOI
|
15 |
Whitehead, K., 2002. Component-based Development: Principles and Planning for Business Systems. Pearson Education, London.
|
16 |
Song, Y.J., Woo, J.H., Shin, J.G., 2011. Research on systematization and advancement of shipbuilding production management for flexible and agile response for high value offshore platform. Int. J. Nav. Archit. Ocean Eng. 3 (3), 181-192.
DOI
|
17 |
Sly, D., Moorthy, S., 2001. Simulation data exchange (SDX) implementation and use. In: Proceedings of the 2001 Winter Simulation Conference, Arlington, USA, pp. 1473-1477.
|
18 |
Wang, P., Mohamed, Y., Abourizk, S.M., Rawa, A.T., 2009. Flow production of pipe spool fabrication: simulation to support implementation of lean technique. J. Constr. Eng. Manag. 135 (10), 1027-1038.
DOI
|
19 |
Woo, J.H., Lee, K.K., Jung, H.R., Kwon, Y.D., Shin, J.G., 2005. A framework of plant simulation for a construction of a digital shipyard. J. Soc. Nav. Archit. Korea 42 (2), 165-174.
DOI
|
20 |
Woo, J.H., Song, Y.J., Shin, J.G., 2009. Research on a simulation-based ship production support system for middle-sized shipbuilding companies. Int. J. Nav. Archit. Ocean Eng. 1, 70-77.
DOI
|
21 |
Woo, J.H., 2005. Modeling and Simulation of Indoor Shop System of Shipbuilding by Integration of the Product, Process, Resource and Schedule Information. Dissertation. Seoul National University.
|
22 |
Watson, E.F., Medeiros, D.J., Sadowski, R.P., 1997. A simulation-based backward planning approach for order-release. In: Proceedings of the 1997 Winter Simulation Conference, Atlanta, USA, pp. 765-772.
|