Journal of the Korean Institute of Telematics and Electronics B
/
v.33B
no.12
/
pp.106-112
/
1996
A ZVT (zero voltage transition) converter for SRM (switched reluctance motor) drives is proposed in this study. By adding a ZVT-chopping switch in the front-end, all switches in the machine side converter can be operated without any chopping to regulate phase current. This allows the use of low-cost and slow-switching devices for the machine side converter. The ZVT circuitry allows high frequency operation of th echopping switch, which enhnaces the system dynamcis and phase-current ripples. High efficiency of th eintegrated converter is obtained due to low switching losses.
A novel soft-switching two-switch flyback converter is proposed in this paper. This converter is composed of two active power switches, a flyback transformer, and two passive regenerative clamping circuits.The proposed converter has the advantages of a low cost circuit configuration, a simple control scheme, a high efficiency, and a wide operating range. The circuit topology and experimental results of the new flyback converter are presented.
A main distributing frame(MDF) is an interface unit that is used to connect office equipment cables in a telephone company to subscriber cables. Until now, there is no automated switching system for MDFs in Korea. Manual handling of an MDF has some drawbacks; It is time-consuming, very cumbersome, and expensive. It also makes maintenance hard. An automated main distributing frame system is proposed and commercialized in Japan. In that system, a robot gripper inserts connecting pins into the cross point holes of a matrix board, which reveals several disadvantages in the aspects of space, maintenance, fault tolerance, and economical efficiency. This paper describes a newly developed robotic switch board system for MDFs. In the developed system, switches are placed at the cross point of a matrix board. There is one robot in between two switch units, so one robot deals with two switch units. In the system, positioning the robot, opening and closing switches can be done by using only a pair of motors and a pair of solenoids. The newly developed system is compact in size, reduces cost, and shows high reliability.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.19
no.11
/
pp.1287-1293
/
2008
Antenna switch module(ASM) for quad-band was developed. This module was integrated by RFIPD(RF integrated passive device) and transistor switch instead of LTCC-type device using low pass filters, diodes and passive elements in RF front end module for cellular phone. This module leads to low cost and miniaturization(The area is $5{\times}5\;mm$ and the thickness is 0.8 mm). The insertion loss and the return loss of each band were averagely measured as 1.0 dB(insertion loss), 15.1 dB(GSM/EGSM return loss) and 19 dB(DCS/PCS return loss), respectively.
Kim Yuen-Chung;Yoon Yong-Ho;Lee Won Cheol;Lee Byoung-Kuk;Won Chung-Yuen
The Transactions of the Korean Institute of Power Electronics
/
v.10
no.6
/
pp.569-577
/
2005
In this paper, a new control scheme to use 6-switch IGBI module for 3-phase switched reluctance motors(SRM) is proposed. Compared with the conventional asymmetric bridge converter topology, it can minimize the entire system size and cost. Therefore, it may have a new topology lot SRM to compare the other ac motors, such as induction motors, brushless dc motors, and so on. The validity of the proposed method is verified by simulation, and experimental results.
Proceedings of the Korean Institute of Building Construction Conference
/
2020.06a
/
pp.165-166
/
2020
The standard for the cost calculation in the field of domestic construction engineering can be largely divided into the construction cost ratio method and the actual cost addition method. However, the standard for calculating the cost of the construction cost ratio method is a trend to switch to the actual cost addition method due to limitations such as not reflecting the characteristics of the construction. Therefore, this study aims to derive implications by investigating and analyzing examples of cost standards in the field of overseas construction engineering, such as the United States, and deriving directions for improvement in domestic cost standards in the future.
A novel two-switch active clamp forward converter suitable for high input voltage applications is proposed. The main advantage of the proposed converter, compared to the conventional active forward converters, is that circuit complexity is reduced and the voltage stress of the main switches is effectively clamped to either the input voltage or the clamping capacitor voltage by two clamping diodes without limiting the maximum duty ratio. Also, the clamping circuit does not include additional active switches, so a low cost can be achieved without degrading the efficiency. Therefore, the proposed converter can feature high efficiency and low cost for high input voltage applications. The operational principles, features, and design considerations of the proposed converter are presented in this paper. The validity of this study is confirmed by the experimental results from a prototype with 200W, 375V input, and 12V output.
Recently, plasma display panels (PDP) have become the most promising candidate in the market for large screen size flat panel displays. PDPs have many merits such as a fast display response time and wide viewing angle. However, there are still concerns about high cost because they require complex driving circuits composed of high power switching devices to generate various voltage waveforms for three operational modes of reset, scan, and sustain. Conventional PDP driving circuits use path switches for voltage separation and a scan switch to offer a scan voltage for reset and scan operations, respectively. In addition, there exist reset switches to initialize PDPs by regulating the wall charge conditions with ramp shaped pulses, which means the necessity of specific power devices for the reset operation. Because power for the plasma discharge accompanied by a large current is transferred to a panel via path switches, high power rating switches are used for path switches. Therefore, this paper proposes a novel low-cost PDP driving scheme achieved by not only eliminating path switches but also merging the function of reset switches into other switches used for sustain or scan operations. The simulated voltage waveforms of the proposed topology and experimental results implemented in a 42-inch panel to demonstrate the validity of using a new gate driver that merges the functions of power switches are presented.
Kim, Young-il;Kim, Hong-jung;Jun, Bum-su;Park, Gwi-chul;Choi, Jaeho
Proceedings of the KIPE Conference
/
2016.07a
/
pp.73-74
/
2016
This paper proposes a wide output range AC/DC converter for a rechargeable battery of electric vehicle. In the proposed wide output range AC/DC converter for rechargeable battery of electric vehicle, the main transformer in the DC/DC stage is divided by two. Therefore, if the switch is connected to the middle tap, then half of the maximum voltage is applied. Otherwise, it can be applied the full range of the high voltage by connecting the switch to the whole tab. And also, it is designed to have a wide output voltage range by applying Vin/2 made by changing the full-bridge to half-bridge by using the bridge change switch of the input stage. As it can be supplied the wide range output voltage with a single module, it has the advantage of space utilization and cost reduction effect.
Proceedings of the Korean Operations and Management Science Society Conference
/
2008.10a
/
pp.131-135
/
2008
In this paper, we deal with a hierarchical location-allocation problem in designing the broadband convergence networks (BcN). The objective is to minimize the total cost of switch and cable while satisfying the quality of service (QoS). We formulate the problem as an integer programming model and develop the Tabu Search (TS) heuristic algorithm to find a good feasible solution within a reasonable time limit. Initial solution is obtained by using the tree structure. Three neighborhood generation mechanisms are used by local search heuristic: insertion, switch up, and switch down. In order to demonstrate the effectiveness of the proposed algorithm, we generate lower bounds from nonlinear QoS relaxation problem. We present promising computational results of the proposed solution procedures.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.