New Technology on Routing and Surveying a 765kV Transmission Line (765kV 송전선로 경과지선정 및 설계측량에 신기술 도입 적용)

  • Lee, Seog-Kyu;Kim, Choon-Gu;Kang, Hee-Kwon;Kim, Jeong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.822-824
    • /
    • 1997
  • The routing and surveying a transmission line should be done in advance of its construction. It is getting more difficult to construct transmission line day by day, due to the rapid increase of people's demand resulting from the recent change of social environment and people's consciousness. In order to solve these complicated conditions actively and rationally, it is necessary to be more scientific, objective and computerizable for the routing and surveying of a transmission line. New technologies on routing and surveying a 765kV transmission line are remote sensing, Global Positioning System and Optimal PowerLine system. Thanks to these technologies, there will be a contribution to making sure of the best quality and developing technolo91r of transmission line.

  • PDF

The Accuracy Analysis of VRS GNSS for Applying Cadastral Surveying (VRS GNSS의 지적측량에 적용을 위한 정확도 분석)

  • Hong, Sung-Eon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.94-100
    • /
    • 2013
  • This study is to analyze the accuracy of position determination in cadastral surveying using VRS GNSS(GPS/GLONASS), and is to suggest a possibility to improvement of accuracy in decision making of cadastral surveying result based on this result. As a result of this study, the position accurate of this study, which decides position combining with GPS/GLONASS satellite data is about 3cm more accurate than using only GPS satellite data. Therefore, if GNSS integrated receiving method is to be applied on cadastration, it can be expected to improve to estimate the position accuracy.

Comparison of Track Recording with Surveying in Track irregularity Measurement (궤도틀림의 검측값과 측량결과 비교)

  • Lee, Jee-Ha;Choi, Ii-Yoon;Kim, Bak-Jin
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1090-1095
    • /
    • 2008
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies use moving chord method, which determine versine values via a chord. The versine is the vertical distance to curve measured in the middle of the chord. This type of method measures only versine of track irregularity curve by transfer function from the characteristics of measuring device. In this report, review the characteristics of two types of measuring tools by comparing the measurements. The one is GRP-1000 system, optical surveying system with Total station and lazar prism trolley. This calculates track geometry by surveying absolute coordinates of two points each on both rail heads. The other is EM-120, measures versine with 10m of symmetrical chord length.

  • PDF

Applicability Evaluation of Mobile Mapping System for Road Construction Surveying (도로 시공측량을 위한 모바일맵핑시스템의 적용성 평가)

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.169-175
    • /
    • 2022
  • Korea's construction industry has a shortage and aging of construction manpower, low productivity compared to other industries, and a high rate of industrial accidents. The Ministry of Land, Infrastructure and Transport is preparing for the 4th industrial revolution and is expanding investment in construction automation and innovative growth engines to improve productivity in the construction industry. In order for new technologies to be utilized in the road construction field, the accuracy of the technologies and the applicability of each type of work must be evaluated. In this study, the accuracy of the mobile mapping system was tried to verify based on the relevant work regulations, and to suggest the applicability of the mobile mapping system to high-speed driving tracks through data acquisition and analysis on road construction sites. The accuracy of the equipment used in the study was verified in accordance with the relevant work regulations, and the possibility of applying the mobile mapping system used for the study to road construction surveying was presented with a maximum error of less than 10cm in the horizontal and vertical directions. In addition, the possibility of utilizing the road construction survey using the mobile mapping system was presented through comparison with the existing method for data acquisition time for construction surveying, production of construction status survey results, and calculation of heatmap and earthworks. In the future, the use of construction status surveying of the mobile mapping system will greatly improve the efficiency of construction work.