• Title/Summary/Keyword: Supply Method

Search Result 3,894, Processing Time 0.029 seconds

인공신경망을 이용한 공급 사슬 상에서의 재고관리

  • 정성원;서용원;박찬권;박진우
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.11a
    • /
    • pp.101-105
    • /
    • 2002
  • In a traditional hierarchical inventory system, direct orders are the only information for inventory management that is exchanged between the firms involved. But due to the rapid development of modern information technology, it becomes possible for the firms to share more information in real time, e.g. demand and inventory status data. And so the term Supply Chain has emerged because it is seen as an important source of competitive advantage. Now it is possible to challenge traditional approaches to inventory management. In the past, one of the de-facto assumptions for inventory management was that the demand pattern follows a specific distribution function. However, it is undesirable to apply this assumption in real situations because the demand information in the supply chain tends to be distorted due to the bullwhip effect in a supply chain. To overcome this weakness, we propose a new solution method using NN (Neural Network). Our method proceeds in three steps. First, we find the patterns of optimal reorder points by analyzing past data. Second. train the NN using these pattern data and finally decide the reorder point. Using simulation experiment, we show that the proposed solution method gives better result than that of traditional research.

  • PDF

Supply Chain Collaboration Degree of Manufacturing Enterprises Using Matter-Element Method

  • Xiao, Qiang;Yao, Shuangshuang;Qiang, Mengjun
    • Journal of Information Processing Systems
    • /
    • v.17 no.5
    • /
    • pp.918-932
    • /
    • 2021
  • Evaluation of the collaboration of the upstream and downstream enterprises in the manufacturing supply chain is important to improve their synergistic effect. From the supply chain perspective, this study establishes the evaluation model of the manufacturing enterprise collaboration on the basis of fuzzy entropy according to synergistic theory. Downstream enterprises carry out coordinated capital, business, and information flows as subsystems and research enterprises as composite systems. From the three subsystems, the collaboration evaluation index is selected as the order parameter. The compound fuzzy matter-element matrix is established by using its improved algorithm. Subordinate membership and standard deviation fuzzy matter-element matrixes are constructed. Index weight is determined using the entropy weight method. The closeness of each matter element is then calculated. Through a representative of the home appliance industry, namely, Gree Electric Appliances Inc. of Zhuhai, empirical analysis of data in 2011-2017 from the company and its upstream and downstream enterprise collaboration shows a good trend, but the coordinated development has not reached stability. Gree Electric Appliances Inc. of Zhuhai need to strengthen the synergy with upstream and downstream enterprises in terms of cash, business, and information flows to enhance competitiveness. Experimental results show that this method can provide precise suggestions for enterprises, improve the degree of collaboration, and accelerate the development and upgrading of the manufacturing industry.

Isolation and Identification of Pseudomonas aeruginosa in Natural Environments by International Organization for Standardization ISO/NP 16266 (국제표준화기구 ISO/NP 16266 방법을 이용한 환경 중 Pseudomonas aeruginosa의 분리 및 동정)

  • Lee, Siwon;Kim, Ji Hye;Lee, Bo-Ram;Joo, Youn-Lee;Choe, Byeol;Park, Su Jeong;Chung, Hyen-Mi;Jheong, Weon Hwa
    • Korean Journal of Microbiology
    • /
    • v.50 no.4
    • /
    • pp.384-386
    • /
    • 2014
  • Pseudomonas aeruginosa is an opportunistic pathogen that inhabits various natural and artificial environments, such as pathogenesis, water, soil and air. They can cause serious problems, such as pathogenic infection. In this study, 220 colonies were isolated from water and soil environment that assumed to be P. aeruginosa using a membrane filter method based on International Organization for Standardization (ISO/NP 16266). Identification of the isolates was determined by physiobiochemical characteristics using newly modified ISO method which includes the resistance to 1,10 phenanthroline test. Only one of 220 presumed P. aeruginosa strains isolated from effluence water using a drain swab was determined as P. aeruginosa-positive by the ISO/NP 16266 method. Subsequently, the resistance to 1,10 phenanthroline test, which was newly proposed by ISO in 2014 and applied in this study, was considered as more precise and improvable method for identification of P. aeruginosa.

The optimization of output coupler reflectivity of high repetitive pulsed Nd:YAG laser system adopted 3-mesh parallel sequential charge and discharge method (3단 병렬 충.방전 방식을 적용한 고반복 펄스형 Nd:YAG 레이저 출력거울 반사율의 최적화)

  • 김휘영;홍수열;김동수
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.3
    • /
    • pp.369-376
    • /
    • 2001
  • The optimization of resonator and laser power supply has been considered to be significant for improving the efficiency of a pulsed Nd:YAG laser system. We have proposed a new method of 3-mesh parallel sequential charge and discharge circuit as a laser power supply; more compact than conventional power supply, competitive in price, easy to control the laser power density according to various material processing, and equipped with the optimum reflectivity of output coupler. In this study, we could find that the maximum laser output was obtained by using 85% of reflectivity in the case of 50[W]-class. In addition using the power supply of new method, it's possible to charge each capacitor bank with a higher energy within the given charging time adopted a new method mentioned above; namely, we can allow each capacitor to have much more charging time and storage energy. So, higher laser output was obtained than conventional power supply.

  • PDF

A Study on the Use of Parking Lots and Improvement Methods of Land Supply in Public Development Zones (공공개발지구 내 주차장용지의 이용실태와 토지공급방법 개선방안 연구)

  • Park, Chang Yul;Kim, Si Jin
    • Land and Housing Review
    • /
    • v.10 no.4
    • /
    • pp.13-30
    • /
    • 2019
  • Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.

The Analysis of Effect in Order to Consider Combined Heat and Power Capacity in the Basic Plan of Long Term Electricity Supply & Demand (전력수급기본계획에 열병합발전 설비 반영시의 효과분석에 관한 연구)

  • Kim, Yong-Ba;Moon, Jung-Ho;Yeon, Jun-Hee;Jung, Hyun-Sung;Woo, Sung-Min;Kim, Mi-Ye
    • Journal of Energy Engineering
    • /
    • v.16 no.1 s.49
    • /
    • pp.22-31
    • /
    • 2007
  • This paper addresses methodology in order to consider CHP (Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand and presents effects on it. The method performs state in extent that do not change maximum in the Basic Plan of Long Term Electricity Supply & Demand. For analysis that occurs some advantage this method compares with Basic Plan of Long Term Electricity Supply & Demand. It includes EES (Expected Energy Served), Fuel consumption, amount of $CO_{2}$ emission reduction.

A Study on Expected Dispute Arbitration in Supply Chain ESG Management: Focusing on the cases of POSCO and NAVER (공급망 ESG 관리에서 예상되는 분쟁 중재에 관한 연구 - 포스코와 네이버 사례를 중심으로 -)

  • Lee, Geonwoo;Lee, Jungeun;Lee, Hunjong
    • Journal of Arbitration Studies
    • /
    • v.34 no.1
    • /
    • pp.75-101
    • /
    • 2024
  • "ESG management" guides companies to prioritize corporate social responsibility and sustainable development as key management objectives, going beyond mere financial performance pursuits. This approach involves creating a sustainable and robust supply chain by urging companies, acting as 'supply chain managers', to implement ESG management practices alongside their 'supply chain partners'. The domestic business community has been quick to respond to this trend, recognizing that failure to adhere to ESG standards set by organizations such as the EU and SEC could lead to severe repercussions, including exclusion from international trade and reputational damage. POSCO and NAVER, two leading Korean companies, are at the forefront of practicing ESG management effectively. They have both produced and publicly disclosed ESG management reports, showcasing their success in enhancing supply chain ESG management. However, as supply chain managers enforce ESG-related obligations on their suppliers, the likelihood of disputes between the parties may increase. In scenarios where supply chain ESG management leads to conflicts between supply chain managers and suppliers, commercial arbitration emerges as a viable solution for dispute resolution. This method offers several advantages, including the arbitrators' expertise, time and cost efficiency, the binding nature of decisions akin to a court's final judgment, international recognition under the New York Convention, confidentiality, and ample opportunity for parties to be heard. Our analysis focuses on the emerging disputes between supply chain managers and suppliers within the context of supply chain ESG management, particularly examining the cases of POSCO and NAVER. By categorizing the expected types of disputes and assessing the appropriateness of commercial arbitration for their resolution, we highlight the effectiveness of this approach. Furthermore, we propose leveraging the Korean Commercial Arbitration Board's role to enhance the use of arbitration in resolving supply chain ESG disputes, underscoring its potential as a strategic tool for maintaining sustainable and harmonious supply chain relationships.

A Solution for Sourcing Decisions under Supply Capacity Risk (공급능력 리스크를 고려한 최적 구매계획 해법)

  • Jang, Won-Jun;Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.42 no.1
    • /
    • pp.38-49
    • /
    • 2016
  • This paper proposes a mathematical model-based solution for sourcing decisions with an objective of minimizing the manufacturer's total cost in the two-echelon supply chain with supply capacity risk. The risk impact is represented by uniform, beta, and triangular distributions. For the mathematical model, the probability vector of normal, risk, and recovery statuses are developed by using the status transition probability matrix and the equations for estimating the supply capacity under risk and recovery statuses are derived for each of the three probability distributions. Those formulas derived are validated using the sampling method. The results of the simulation study on the test problem show that the sourcing decisions using the proposed solution reduce the total cost by 1.6~3.7%, compared with the ones without a consideration of supply capacity risk. The total cost reduction increases approximately in a linear fashion as the probability of risk occurrence or reduction rate of supply capacity due to risk events is increased.

Evaluation on Utilizing Systems of Incineration Heat as Resource cycling Type (자원순환형 소각열 이용시스템에 관한 평가)

  • 정용현
    • Journal of Environmental Science International
    • /
    • v.12 no.4
    • /
    • pp.503-510
    • /
    • 2003
  • How to plan the energy system is one of the keys f3r constructing the Environment -Friendly City. for this reason, a great number of surveys for utilizing unused energy have conducted by a planner. In regard to unused energy, the heat from incineration plants classify as a unused energy having high-exergy-energy. From this point of view, It is studied about the plant systems providing heat to district heating & cooling(D.H.C) and producing electric power. It is divided four system models as system I (10K [kgf/cm$^2$) vapor as outlet of boiler, supply far 10K vapor and return to 60$^{\circ}C$ as supply condition of district heating), system II (30 K vapor as outlet of boiler, supply for 5t vapor and return to 60f as supply condition of district heating), system 111 (30 K vapor as outlet of boiler, supply for 85$^{\circ}C$ hot water and return to 60$^{\circ}C$ as supply condition of district heating), system IV (30 K vapor as outlet of boiler, supply for 47$^{\circ}C$ hot water and return to 40t as supply condition of district heating). The results from the upper condition of four system, System II got a proper on economical benefits and system IV calculated as benefiting on energy saving effects, and suggest indifference curve as the total evaluation method of both economical benefits and energy saving.

An Exploratory Treatise on Consciousness and Espousal of Halal Supply-Chain: An Indian Perspective

  • Potluri, Rajasekhara Mouly;Lee, Jung Wan;Potluri, Lohith Sekhar
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.4 no.2
    • /
    • pp.69-74
    • /
    • 2017
  • The purpose of this research is to be acquainted with the awareness and approval of halal supply chain among Indian manufacturers and distribution network members for haulage and warehousing activities from the perception of respective service suppliers. A total of 20 respondents, which consist of 10 transportation companies and 10 warehousing companies from the State of Andhra Pradesh in India were selected for the study by using purposive sampling method. The principal focal points of the discussions are on awareness and adoption of halal transportation and warehousing services chosen for the study in the comprehensive halal supply chain. A total of 90 percent and 70 percent of respondents from the transportation and warehousing companies respectively agreed that they know only about the concept of halal but do not have any exposure and ken on the halal supply chain. However, findings of this research won't have extensive validity in the market, gaining an enough familiarity with the halal supply chain in the Indian social context is of immense importance. This is a pioneering attempt aimed to investigate the awareness and adoption levels of halal supply chain among Indian businessmen which are precious for supply chain companies to customize their services in the country as well to the world of academia.