A Study on the Design of Small Unit SCADA System for Electric Railroad (전기철도용 소규모SCADA 시스템 설계방안에 관한 연구)

  • Lee, Seung-Chul;Shin, Kwan-Woo;Lee, Youn-Seop
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.53 no.2
    • /
    • pp.89-93
    • /
    • 2004
  • Supervisory Control And Data Acquisition(SCADA) of electric power system refersto the system that displays, monitors and executes the control commands for remote electric power system. KNR's existing electric power control system is built on UNIX platform such that it costs more for system construction, and people with UNIX skills can only be an operator who controls and manages the system. Moreover, since the system is mainly operated in local offices, system operators must communicate with local operators to investigate the cause of the accident and react the accident every time the system fails. As a new integrated SCADA system is constructed, establishment of small-unit electric power control system, that alters local electric power control system in designated stations, is required. In this study, the electric power control system, which accommodates all functions of UNIX-based SCADA system and facilitates operation and even maintenance for local operators, is to be developed. In order to develop small-unit electric power control system, the industrial automation program, "Cimon", is used. The small-unit electric power control system that accommodatesRTU and newly installed electronic switchboard is being developed and tested at Chulam station of KNR.

Development of the Automative Correction System for the Digital Over-current Relay With Distribution System (배전계통에서의 디지털 과전류 계전기 자동 정정 시스템 개발)

  • Baek, Young-Sik;Lee, Ho-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.4
    • /
    • pp.677-682
    • /
    • 2007
  • In the distribution system, Change of system happens frequently. However, most of the relays are operated manually by a person or not changed when system changed. So, when fault happened, a case that relaydoes not act rapidly happens. Also, in current power system, digital relays are used because of digitization of relay. Digital relay has very many advantages than existing analog relay. One of these advantages is that communication is available and easily can make characteristic curve. If specific values are sent to a relay by communication, A relay can make suitable characteristic curve according to the value. In this paper, by using voltages and currents measured by relay, state of CB(Circuit Breaker) and these relays, SCADA(Supervisory Control And Data Acquisition) system that control and correct characteristic curve of overcurrent relay at system change by using HMI(Human Machine Interface) is proposed.

A design of supervisory control system for a multi-robot system (다중로봇을 휘한 관리제어 시스템의 설계)

  • 서일홍;여희주;김재현;류종석;오상록
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.1
    • /
    • pp.100-112
    • /
    • 1996
  • This paper presents a design experience of a control language for coordination of a multi-robot system. To effectively program job commands, a Petrinet-type Graphical Robot Language(PGRL) is proposed, where some functions, such as concurrency and synchronization, for coordination among tasks can be easily programmed.In our system, the proposed task commands of PGRL are implemented by employing formal model languages, which are composed of three modules, sensory, data handling, and action module. It is expected that by using our proposed PGRL and formal languages, one can easily describe a job or task, and hence can effectively operate a complex real-time and concurrent system. The control system is being implemented by using VME-based 32-bit microprocessor boards for supervisory, each module controller(arm, hand, leg, sensor data processing module) and a real time multi-tasking operating system(VxWorks). (author). 17 refs., 16 figs., 2 tabs.

  • PDF

A Design of MIB for Power System Using XML Web Service (XML 웹서비스를 이용한 전력시스템 MIB 설계)

  • Jung, Nam-Joon;Yang, Il-Gwon;Song, Jae-Ju;Ko, Jong-Min;Oho, Do-Eun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06b
    • /
    • pp.473-478
    • /
    • 2008
  • 산업계에서의 제어시스템(Control System)은 크게 SCADA(Supervisory Control And Data Acquisition) 시스템, 분산 제어시스템(Distributed Control System, DCS), PLC 시스템 (Programmable Logic Controller System)으로 분류할 수 있다. 특히 전력분야의 SCADA 시스템은 목적상 실시간의 대규모 측정 정보 취득을 목적으로 운영되며, 실시간 및 이력 데이터베이스, 원격 데이터 취득, 다양한 데이터 처리, Supervisory Control 등 복잡한 기능과 다양한 전력시스템과의 정보교환이 요구된다. 다양한 전력시스템과의 정보 교환을 위한 표준화 요구에 부응하여, 향후 전력시스템은 표준화되고 공개된 정보모델을 활용한 통합시스템 개발이 요구된다. 본 논문에서는 전력 공통정보모델(CIM)과 애플리케이션 통합 정보기술을 이용한 전력시스템의 메시지 통합버스 설계에 대하여 기술하고자 한다.

  • PDF

The Speed Control of a DC Servo Motor by the PID Self Tuning Control Method (PID-자기동조 제어방식에 의한 DC 서보 전동기의 속도제어)

  • Cho, Hyun-Seob;Ku, Gi-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.6
    • /
    • pp.1560-1564
    • /
    • 2008
  • Robust control for DC motor is needed according to the highest precision of industrial automation. However, when a motor control system with PID controller has an effect of load disturbance, it is very difficult to guarantee the robustness of control system. In this paper, PID-Self Tuning control method for motor control system as a compensation method solving this problem is presented. If the PID control system is stable in the sense that the error is inside the constraint set, the supervisory control is idle. If the error hits the boundary of the constraint, the supervisory controller begins operation to force the error back to the constraint set. We prove that the PID-Self Tuning control system is globally stable in the sense that the error is guaranteed to be within the tolerance limits specified by the system designer.

Key Distribution Process for Encryption of SCADA Communication using Game Theory applied Multiagent System

  • Kim, Hak-Man;Kang, Dong-Joo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.11
    • /
    • pp.34-43
    • /
    • 2009
  • SCADA (Supervisory Control and Data Acquisition) system has been used for remote measurement and control on the critical infrastructures as well as modem industrial facilities. As cyber attacks increase on communication networks, SCADA network has been also exposed to cyber security problems. Especially, SCADA systems of energy industry such as electric power, gas and oil are vulnerable to targeted cyber attack and terrorism Recently, many research efforts to solve the problems have made progress on SCADA network security. In this paper, flexible key distribution concept is proposed for improving the security of SCADA network using Multiagent System (MAS).

Design and Specification of a Low-Level Control Software for an FMC Using Supervisory Control Theory

  • Kim, Sang-Kyun;Park, Jong-Hun;Park, Namkyu;Park, Jin-Woo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.2
    • /
    • pp.159-178
    • /
    • 1995
  • Supervisory control is an approach based on formal language. it is used to model and control discrete event systems in which each discrete event process is represented as an automation. A supervisor is a generator that switches control patterns in such a way that a given discrete evenet process behaves in obedience to various constraints. A flexible manufacturing cell (FMC) is one of discrete evenet systems. Functions necessary for the operation of an FMC are characterized by operational components and informational compoments. The operational components can be modeled using the finite state machines and the informational components can be modeled using the abstract formalism which describes supporting operations of the cell controller. In this paper, we addressed function required for FMC control specification, software engineering aspects on FMC control based on supervisory control, a concept of event queue for resolving synchronization problem, and complexity reduction. Based on the mathematical model of an FMC. we synthesized the controller by integrating a supervisor for FMC with control specification that specifies event-driven operation of the cell controller. The proposed control scheme is stable mathematically so that the system always behaves on a controlled way even under the existence of uncontrollable events. Furthermore, using an event queue concept, we can solve a synchronization problem caused by the violation of instantaneity assumption of supervisory control theory in real life situation. And also, we can propotype a control software rapidly due to the modularity of the proposed control scheme.

  • PDF

Development of Unified SCADA System Based on IEC61850 in Wave-Offshore Wind Hybrid Power Generation System (파력-해상풍력 복합발전시스템의 IEC61850기반 통합 SCADA시스템 개발)

  • Lee, Jae-Kyu;Lee, Sang-Yub;Kim, Tae-Hyoung;Ham, Kyung-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.811-818
    • /
    • 2016
  • This paper suggests a structure of power control system in floating wave-offshore wind hybrid power generation system. We have developed an unified SCADA(Supervisory Control and Data Acquisition) system which can be used to monitor and control PCS(Power Conversion System) based on IEC61850. The SCADA system is essential to perform the algorithm like proportional distribution and data acquisition, monitoring, active power, reactive power control in hybrid power generation system. IEC61850 is an international standard for electrical substation automation systems. It was made to compensate the limitations of the legacy industrial protocols such as Modbus. In order to test the proposed SCADA system and algorithm, we have developed the wind-wave simulator based Modbus. We have designed a protocol conversion device based on real-time Linux for the communication between Modbus and IEC61850. In this study, SCADA system consists of four 3MW class wind turbines and twenty-four 100kW class wave force generator.

Development of automatic die bonder system for semiconductor parts assembly (반도체 소자용 자동 die bonding system의 개발)

  • 변증남;오상록;서일홍;유범재;안태영;김재옥
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.353-359
    • /
    • 1988
  • In this paper, the design and implementation of a multi-processor based die bonder machine for the semiconductor will be described. This is a final research results carried out for two years from June, 1986 to July, 1988. The mechanical system consists of three subsystems such as bonding head module, wafer feeding module, and lead frame feeding module. The overall control system consists of the following three subsystems each of which employs a 16 bit microprocessor MC 68000 : (i) supervisory control system, (ii) visual recognition / inspection system and (iii) the display system. Specifically, the supervisory control system supervises the whole sequence of die bonder machine, performs a self-diagnostics while it controls the bonding head module according to the prespecified bonding cycle. The vision system recognizes the die to inspect the die quality and deviation / orientation of a die with respect to a reference position, while it controls the wafer feeding module. Finally, the display system performs a character display, image display ans various error messages to communicate with operator. Lead frame feeding module is controlled by this subsystem. It is reported that the proposed control system were applied to an engineering sample and tested in real-time, and the results are sucessful as an engineering sample phase.

  • PDF

A SCADA Testbed Implementation Architecture for Security Assessment (SCADA 시스템의 보안성 평가를 위한 테스트베드 구성)

  • Lee, Jong-Joo;Kim, Seog-Joo;Kang, Dong-Joo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.4
    • /
    • pp.50-56
    • /
    • 2010
  • Supervisory Control and Data Acquisition Systems (SCADAs) is real-time monitor and control systems. SCADA systems are used to monitor or control chemical and transportation processes, in municipal water supply systems, electric power generation, transmission and distribution, gas and oil pipelines, and other distributed processes. SCADA refers to a large-scale distributed system. The supervisory control system is placed on top of a real time control system to control external processes. Emerging security technologies and security devices are decreasing the vulnerability of the power system against cyber threats. Dealing with these threats and analyzing vulnerabilities is an important task for equipment such as RTU, IED and FEP. To reduce such risks, we develop such a SCADA testbed. This paper presents the development of a testbed designed to assess the vulnerabilities SCADA networks(including serial communication).