지열발전 시추공 구축 프로젝트관리시스템 개발 (Development of Project Management System for Geothermal Well Construction)

  • 김광염;이승수
    • 신재생에너지
    • /
    • 제8권3호
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로 (Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects)

  • 정설림;김대철
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

Issues and development plan for Korea Water Cluster

  • Choi, Sung-woo;Bae, Hun-Kyun
    • Environmental Engineering Research
    • /
    • 제22권1호
    • /
    • pp.125-130
    • /
    • 2017
  • The Korean Ministry of Environment and Daegu Metropolitan City are establishing the Korea Water Cluster, which will focus on promoting and escalating Korean water industries. The water industry, a future-oriented and promising business sector, is continuously growing each year worldwide, so the project is very timely. In reality, however, challenges still need to be addressed, such as accessibility, logistics systems, social infrastructures, and attracting good companies. For the Korea Water Cluster to be successful, those issues should be solved, but it is difficult to untangle the matters only with efforts of the Korean Ministry of Environment and Daegu Metropolitan City since some issues will require a great deal of both money and time. Therefore, it is important for the Korean federal government to administer support and finances for certain parts of the project, and for the Korean Ministry of Environment and Daegu Metropolitan City to take on other issues to ensure the Korea Water Cluster is successful long-term. The success of the Korea Water Cluster project will result in the Korea Water Cluster becoming a global hub for the future water industries.

과학기술혁신을 위한 National Project의 성공적 정책집행의 요인 (Factors of Successful Policy Implementation in National Projects for Technology Innovation)

  • 조국현
    • 기술혁신연구
    • /
    • 제12권3호
    • /
    • pp.73-96
    • /
    • 2004
  • This research began by recognizing the development of telecommunication skill in a short period of time as one achievement of launching the national research and development (R&D) project for the diversification of telephone service and for the solution of telephone holdup rate. Under this concern, this research is focusing on searching the influential elements on successful outcome by analyzing the case of Time Division Exchange R&D Project carried out by Korea. Those variables for analyzing the case is limited to 7 definite variables, which are "willingness of policy making organization", "participation of manufacturers and buyers", "support from research and development group", "economy of operating methods and selection of machinery", "rate of technology transfer", "support from Fixer", and "quality management". Summarizing the result of analysis, in order to bring about technological innovation, knowledge creation activity leading to upward efficiency through competition and cooperation making a harmony should be done in one mechanism. I.e., launching an innovative policy should be done in an arena of competition and cooperation, where stability of implementing system is achieved, the entity of "Fixer" is an adequate operator, and competition and cooperation is efficiently managed, among where agreement on purpose and professional opinions are reflected.

  • PDF

무기체계 시험업무에 대한 리스크 관리 표준 프로세스 연구 (A Study on Standard Process of Risk Management for Defense Systems Test Works)

  • 나태흠;허동은;김영민;이주연
    • 한국군사과학기술학회지
    • /
    • 제27권3호
    • /
    • pp.364-374
    • /
    • 2024
  • Today, risks created by uncertainty must be managed for successful project execution. From this perspective, applying a risk management process is very important for successful defense systems test works. This paper describes 'the implentation of risk management process for test work' carried out by DTERI's process improvement activities. In this study, the concept of risk management process, and details of the risk management process are examined through PMBOK and ISO/IEC/IEEE 15288, CMMI. After that, we defined 'Standard Process for Risk Management' of defence systems test works. And, we describe 'Risk Management Function' of DTERI's Project Management System(PMS) and the risk management process of DTERI. Finally, the effectiveness of the risk management standard process is verified through quantitative analysis.

데이터 웨어하우징의 구현성공과 시스템성공 결정요인 (Factors Affecting the Implementation Success of Data Warehousing Systems)

  • 김병곤;박순창;김종옥
    • 한국정보기술응용학회:학술대회논문집
    • /
    • 한국정보기술응용학회 2007년도 춘계학술대회
    • /
    • pp.234-245
    • /
    • 2007
  • The empirical studies on the implementation of data warehousing systems (DWS) are lacking while there exist a number of studies on the implementation of IS. This study intends to examine the factors affecting the implementation success of DWS. The study adopts the empirical analysis of the sample of 112 responses from DWS practitioners. The study results suggest several implications for researchers and practitioners. First, when the support from top management becomes great, the implementation success of DWS in organizational aspects is more likely. When the support from top management exists, users are more likely to be encouraged to use DWS, and organizational resistance to use DWS is well coped with increasing the possibility of implementation success of DWS. The support of resource increases the implementation success of DWS in project aspects while it is not significantly related to the implementation success of DWS in organizational aspects. The support of funds, human resources, and other efforts enhances the possibility of successful implementation of project; the project does not exceed the time and resource budgets and meet the functional requirements. The effect of resource support, however, is not significantly related to the organizational success. The user involvement in systems implementation affects the implementation success of DWS in organizational and project aspects. The success of DWS implementation is significantly related to the users' commitment to the project and the proactive involvement in the implementation tasks. users' task. The observation of the behaviors of competitors which possibly increases data quality does not affect the implementation success of DWS. This indicates that the quality of data such as data consistency and accuracy is not ensured through the understanding of the behaviors of competitors, and this does not affect the data integration and the successful implementation of DWS projects. The prototyping for the DWS implementation positively affects the implementation success of DWS. This indicates that the extent of understanding requirements and the communication among project members increases the implementation success of DWS. Developing the prototypes for DWS ensures the acquirement of accurate or integrated data, the flexible processing of data, and the adaptation into new organizational conditions. The extent of consulting activities in DWS projects increases the implementation success of DWS in project aspects. The continuous support for consulting activities and technology transfer enhances the adherence to the project schedule preventing the exceeding use of project budget and ensuring the implementation of intended system functions; this ultimately leads to the successful implementation of DWS projects. The research hypothesis that the capability of project teams affects the implementation success of DWS is rejected. The technical ability of team members and human relationship skills themselves do not affect the successful implementation of DWS projects. The quality of the system which provided data to DWS affects the implementation success of DWS in technical aspects. The standardization of data definition and the commitment to the technical standard increase the possibility of overcoming the technical problems of DWS. Further, the development technology of DWS affects the implementation success of DWS. The hardware, software, implementation methodology, and implementation tools contribute to effective integration and classification of data in various forms. In addition, the implementation success of DWS in organizational and project aspects increases the data quality and system quality of DWS while the implementation success of DWS in technical aspects does not affect the data quality and system quality of DWS. The data and systems quality increases the effective processing of individual tasks, and reduces the decision making times and efforts enhancing the perceived benefits of DWS.

  • PDF

Study on the Influence of Stakeholders in Construction Projects

  • Rajeev, S.;Kothai, P.S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권2호
    • /
    • pp.8-11
    • /
    • 2014
  • The interactions and interrelationships between stakeholders largely determine the overall performance of a construction project, and have the crucial responsibility for delivering a project to successful completion. An important component of stakeholder management is stakeholder analysis. Two case studies are conducted within Kerala (India). The main objective was to carry out stakeholder analysis using stakeholder organiser deluxe software, considering the data's collected from the project execution team using questionnaire. During data collection the key stakeholders were identified, to know how to manage them, their interest, power, attitude level etc, for quality improvement. Analyze the results using the software Stakeholder organizer deluxe and modeling of stakeholders is to be done. Finally validate the models of the projects. These findings may mainly reflect the stakeholder management environment in the respective regions of project implementation.

협동프로젝트 교과과정을 위한 다차원 수행평가지원 시스템 (Multidimensional Performance Assessment Support System for Collaborative Project Course)

  • 김지혜;조정원
    • 한국산학기술학회논문지
    • /
    • 제10권12호
    • /
    • pp.3645-3652
    • /
    • 2009
  • 프로젝트식 교과과정인 협동프로젝트가 성공적으로 운영되기 위한 가장 중요한 요소는 체제적이고 합리적인 평가라 할 수 있다. 본 논문에서는 단순한 결과 지향적인 평가를 벗어나 학습자에게 스스로 문제점에 대해 진단하고 개선할 수 있는 다차원 수행평가지원 시스템을 설계 및 구현한다. 이 시스템은 협동프로젝트를 이수하는 모든 과정을 평가함으로써 평가자와 피평가자 모두 평가 결과에 대해 만족할 수 있도록 구성하였다.

다수 자원제약 하에서의 프로젝트 일정계획에 관한 연구 (A Study on Project Scheduling under Multiple Resource Constraints)

  • 이정훈;김판술;문일경
    • 대한산업공학회지
    • /
    • 제36권4호
    • /
    • pp.219-229
    • /
    • 2010
  • The PERT/CPM are considered as the base procedures for the most successful project scheduling programs. Unfortunately, it is not easy to apply these procedures to real-life projects. This is due to the fact that PERT/CPM assume an infinite number of resources for each activity in project networks. Obviously, the completion time under no constraints is less than when constraints are imposed. One way of approaching this problem is to use heuristic solution techniques. In this paper, we present three heuristics; MRU (Maximum Resource Use) rule, STU (Shortest Time Use) rule, MRUP (Max Resource Use and Period) rule for allocating resources to activities of projects under multiple resource constraints. Comparisons of the project durations show that these heuristic rules are superior to AG3 rule that has been widely used in practice (Elsayed and Boucher, 1994).