• Title/Summary/Keyword: Subway tunnel

Search Result 382, Processing Time 0.024 seconds

Preliminary Design of Retrofitted System of Domestic Subway Tunnel (도시철도 개착식 터널의 내진성능보강시스템 기본설계)

  • Shin, Hong-Young;Kim, Doo-Kie;Kwon, Min-Ho;Chang, Chun-Ho;Kim, Ki-Hong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.6-9
    • /
    • 2009
  • The occurrence rate of the earthquake more than magnitude 5 has been increased since 1990 and the damage of the Odaesan earthquake, 2007 was serious. Due to that, one may say that Korea is not any more safe for the earthquake. Therefore, it is necessary to prepare strategies for possible damage due to strong earthquakes in future. This study is to focus to develop the retrofitting system for the cut and cuver tunnels built without earthquake type load scenario, so that it can provide the safety of existing urban subway system against earthquakes.

  • PDF

Evaluation of Vibration and Noise character on the Floating Slab Track (부유궤도의 진동$\cdot$소음 특성 평가)

  • Hun Young;Lee sang jin;Kim gi hun;Lee in se
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.343-348
    • /
    • 2003
  • As one of countermeasures for vibration and noise source which come from train operation in subway system, the heavy-weighted tunnel structure and the low-vibration track design have been adopted. In recent the low-vibration concrete track have been constructed to enhance the maintenance effectiveness as well as the reduction of vibration. This paper is explaining and evaluating of the characteristics of vibration and its effects comparing to tile ballast track, concrete track, and full surface supported floating slab track installed on Express bus terminal in Seoul subway No. 7 line.

  • PDF

A study of PM-10 and Heavy Metal characteristics in the air at the each site of a subway station. (지하철역사내 측정위치별 PM-10 및 중금속 농도특성에 관한 연구)

  • Chang Jung-Wook;Cho Jang-Je;Choi Woo-Gun;Park Duk-Sin;Jung Woo-Sung;Kim Tae-Oh
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.389-394
    • /
    • 2003
  • Subway has been used one of major public transportations because of overpopulation and heavy traffic problems in the metropolitan areas. So, the air pollution has been serious. In this study, continuous date of PM-10 (particles with aerodynamic diameter < $10{\mu}m$) and heavy metal concentration measurements for winter, spring and summer. These measurements have been carried out in the outdoor, concourse, platform, tunnel. The study results showed that the average seasonally concentration of PM-10 particles were $141.57{\mu}g/m^3$ in winter. $129.34{\mu}g/m^3$ in spring and $122.73{\mu}g/m^3$. The average concentration of PM-l0 particles at indoor higher than outdoor. The concentration of Fe, Cu, showed the largest peak concentrations during the respective season.

  • PDF

A Study on the Indoor Air Quality in Subway - PM-10 and Heavy Metals - (지하철역에서의 공기질 평가에 관한 연구 - PM-10 및 중금속 -)

  • 배상호;최우건;박덕신;정우성;김태오
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.555-560
    • /
    • 2002
  • Subway has been used one of major public transportations because of overpopulation and heavy traffic problems in the metropolitan areas. In this study, continuous date of PM-10(particles with aerodynamic diameter < 10$\mu\textrm{m}$) and heavy metal concentration measurements for autumn and winter period were analysed. These measurements have been carried out at the outdoor, concourse, platform, tunnel. The study results showed that the average seasonal concentration of PM-10 particles were 181.01$\mu\textrm{g}$/㎥ in autumn and 129.03$\mu\textrm{g}$/㎥ in winter, respectively. The concentration of Fe, Cu showed the largest peak concentrations during the respective season.

  • PDF

A Study on the Facility Installation for Safety Operation of Urban Transit (도시철도의 안전운행을 위한 시설물 설치에 관한 연구)

  • Lee, Woo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1323-1325
    • /
    • 2003
  • In field of Urban transit safely, It must be not only secured vehicle but also every areas like power, signal, communication, track, tunnel, operating facilities. Likewise it is very important not only hardware system like vehicles, facilities but also software system like action of engine driver, duty officer. In other to secure safety of hardware, soft ware, it is very important systemic process. In Korea, Many operating companies neglect to invest in safely and ignore technical development about safety because of management. Safely was considered in subway system and many studies were accomplished about safety in subway system in advanced county like U.K, USA. Hence, in this paper, Conditions and improvement of minimum considerable hardware and software are proposed for safe operation in Urban transit.

  • PDF

A Study On a Method of Improvement From Domestic NATM Case (NATM 시공 사고 사례에 의한 개선방안 연구)

  • 이상웅
    • Explosives and Blasting
    • /
    • v.13 no.3
    • /
    • pp.19-30
    • /
    • 1995
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly, we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data. Poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for setting technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites having occured accidents is badly geological survey, nonconfirmationi of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are Summarised as follows : 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre0boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel . 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring management, should be posted at field.

  • PDF

A Study on Ground Behavior during Tunnel Excavation (터널 굴착시 지반거동에 관한 연구)

  • 신종호;유태성
    • Geotechnical Engineering
    • /
    • v.1 no.1
    • /
    • pp.31-46
    • /
    • 1985
  • An extensive program of tunnel instrumentation has been Implemented in the construction of the Seoul Subway Line 3 and 4, in which the NATM was adopted as the main tunnelling technique. Among more than ten instrumented sections in the downtown area, five representative test sections were selected for analysis in this study, with an emphasis on the surface settlement and crown settlement. Variations of the surface and crown settlement. Variations of the governing factors, such as ground conditions, tunnel geometry, and construction conditions are described in this paper. Possible mechanisms for ground deformations occurring at different stages of tunnel construction are formulated, based on overall interpretation of the field observations and data obtained.

  • PDF

A Study on a Method of Improvement from Domestic NATM Case (국내 NATM시공 사고사례에 의한 개선방안 연구)

  • 김무일;이상웅
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.4
    • /
    • pp.92-102
    • /
    • 1994
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data, poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for settling technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites haying occured accidents is badly geological survey, nonconfirmation of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are summarised as follows ; 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre-boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel. 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring managements, should be posted at field.

  • PDF

Preventing disaster system of the subaqueous tunnel under the Han river in the Bundang railway (분당선 한강 하저터널의 방재시스템)

  • Kim Yong-Il;Hwang Nak-Yeon;Yoon Young-Hoon;Jie Hong-Keun;Jang Sung-Wook;Kim Dong-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.308-327
    • /
    • 2004
  • As use of tunnels and subways increase there also are accidents proportionate to it. Daegu Subway Station fire, Hongjimoon tunnel fire led people to be conscious of disaster protection and as a result, there is a trend to adopt standards for fire protection. Accordingly, this thesis is focused on investigating various fire and water protection related issues for subaqueous tunnel under Ran river. The thesis developed evacuation and disaster prevention plan as fire level increases and have identified the suitability of disaster prevention through evacuation and fire simulation, countermeasure of a water leakage during construction and operation considering the subaqueous tunnel. And we selected EPB shield TBM equipment considering the ground condition and effect of boring hole, and accomplished reasonable water protection design through setting goals using event-tree method, as well as examining model test of boring hole and flooding in heavy rain. Also included structured total system consist of water leakage sensing system, water protection gate, pumping system and fire protection system to respond systematically in emergency.

  • PDF

Determination of effective parameters on surface settlement during shield TBM

  • Kim, Dongku;Pham, Khanh;Park, Sangyeong;Oh, Ju-Young;Choi, Hangseok
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.153-164
    • /
    • 2020
  • Tunnel excavation in shallow soft ground conditions of urban areas experiences inevitable surface settlements that threaten the stability of nearby infrastructures. Surface settlements during shield TBM tunneling are related to a number of factors including geotechnical conditions, tunnel geometry and excavation methods. In this paper, a database collected from a construction section of Hong Kong subway was used to analyze the correlation of settlement-inducing factors and surface settlements monitored at different locations of a transverse trough. The Pearson correlation analysis result revealed a correlation between the factors in consideration. Factors such as the face pressure, advance speed, thrust force, cutter torque, twin tunnel distance and ground water level presented a modest correlation with the surface settlement, while no significant trends between the other factors and the surface settlements were observed. It can be concluded that an integrated effect of the settlement-inducing factors should be related to the magnitude of surface settlements.