• Title/Summary/Keyword: Subway maintenance monitoring

Search Result 26, Processing Time 0.046 seconds

Achievements and Tasks of the SMRT Tunnel Monitoring System(TMS) (서울도시철도공사 터널모니터링 시스템의 운영성과와 과제)

  • Park, Jong-Hun;Kim, Man-Hwa;Park, Ki-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.381-387
    • /
    • 2012
  • This paper is aimed to analyze the achievements of the Tunnel Monitoring System(TMS), implemented in Seoul subway L5~L8, and to find out improved methods. By introducing the TMS, it is possible to inspect tunnel facilities for 24 hours a day while trains are operated. The inspection capability could be expanded, the accuracy was improved, and the cycle was shortened. The efficiency of manpower was improved and the surplus manpower could be used for other tasks of facilities maintenance. As a result, by introduction of the TMS, the amount of tunnel maintenance was increased by 225% and the train service troubles caused by facility problems were decreased by 53%.

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

Damage detection of subway tunnel lining through statistical pattern recognition

  • Yu, Hong;Zhu, Hong P.;Weng, Shun;Gao, Fei;Luo, Hui;Ai, De M.
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.2
    • /
    • pp.231-242
    • /
    • 2018
  • Subway tunnel structure has been rapidly developed in many cities for its strong transport capacity. The model-based damage detection of subway tunnel structure is usually difficult due to the complex modeling of soil-structure interaction, the indetermination of boundary and so on. This paper proposes a new data-based method for the damage detection of subway tunnel structure. The root mean square acceleration and cross correlation function are used to derive a statistical pattern recognition algorithm for damage detection. A damage sensitive feature is proposed based on the root mean square deviations of the cross correlation functions. X-bar control charts are utilized to monitor the variation of the damage sensitive features before and after damage. The proposed algorithm is validated by the experiment of a full-scale two-rings subway tunnel lining, and damages are simulated by loosening the connection bolts of the rings. The results verify that root mean square deviation is sensitive to bolt loosening in the tunnel lining and X-bar control charts are feasible to be used in damage detection. The proposed data-based damage detection method is applicable to the online structural health monitoring system of subway tunnel lining.

Deformation Monitoring of Subway Track using by Automatic Measurement (자동화계측을 통한 지하철 궤도 변형 모니터링연구)

  • Jung-Youl Choi;Jae-Min Han
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.579-584
    • /
    • 2024
  • Currently, large-scale, deep construction is being carried out adjacent to subway tracks in korea. when excavating adjacent to each other, it is very important to ensure the safety of earth retaining structures and underground structures. therefore, we are managing the safety of the subway by introducing an automated measurement system. deformation of the subway track during adjacent excavation may affect train running stability. this is a factor that can be linked to train derailments. however, current subway track safety evaluation using automated measurement systems relies only on the maximum value of measured data. therefore, a method to improve the usability of automated measurement system results is needed. in this study, we utilized a technique that can quantitatively evaluate the measurement results of a large amount of subway track deformation. a safety evaluation was conducted on subway track deformation due to adjacent excavation using a vast amount of data using probabilistic statistical analysis techniques.

Establishment of Maintenance and Monitoring Standards for Shield and TBM Tunnels (Shield 및 TBM 터널의 유지관리계측 관리기준 설정에 관한 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • Purpose: The objective of this study was to improve the tunnel maintenance and monitoring technology by establishing the maintenance, management, and monitoring standards for shield and TBM tunnels, which had been applied more in recent years. Method: This study comprehensively analyzed and compared the data and model simulations of Seoul Subway Lines 7 and 9 and Bundang Line, shield and TBM tunnels in South Korea, tunnels in France and Japan, and Channel Tunnel in the UK. Result: This study set maintenance and monitoring standards when there was no design estimate based on numerical analyses such as section design and section analysis regarding the maintenance and monitoring section of shield and TBM tunnels. Conclusion: It is necessary to determine safety by comprehensively considering not only each monitoring item but also the changing trend and correlation of all items and compensation of the tunnel.

A Development on the software of Train Control and Monitoring System(TCMS) for Subway Train (전동차용 종합제어장치 소프트웨어 개발)

  • Choi, Byoung-Wook;Park, Jong-Hun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.12
    • /
    • pp.94-100
    • /
    • 2011
  • TCMS is the most important controller in the subway train for reliable train control and service oriented flexibility. TCMS software charges communications and control of train and maintains control devices so we use QNX for real-time control. This paper introduces overall software development of TCMS using various diagrams. Software implementation details in TC and CC are explained using deployment diagram through train configuration. Driving control process among many processes is focused to present implement details which controls train by driver or automatic train operation and handles commands to control deriving devices in cars. Reliable operation of train and easy maintenance process is achieved through the same hardware in train control computer and car control computer.

Air Quality Monitoring System Using NDIR-CO$_2$ Sensor for Underground Space based on Wireless Sensor Network (비분산적의선 CO$_2$센서를 이용한 무선 센서 네트워크 기반의 지하 공기질 모니터링 시스템)

  • Kwon, Jong-Won;Kim, Jo-Chun;Kim, Gyu-Sik;Kim, Hie-Sik
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.46 no.4
    • /
    • pp.28-38
    • /
    • 2009
  • In this study, a remote air quality monitoring system for underground spaces was developed by using NDIR-based CO$_2$ sensor. And the remote monitoring system based on wireless sensor networks was installed practically on the subway station platform. More than 6.5 million citizens commutate everyday by the Seoul subway transportation that is the most typical public transportation. They concern about air quality with increasing interest on public health or many workers in subway stations or underground shopping centers. Recently, the Korean Ministry of Environment has operated the air quality monitoring system in some subway stations for testing phase. However, it showed many defects which are large-scale, high-cost and maintenance of precision sensors imported from abroad. Therefore this research includes the reliability test and a theoretical study about the inexpensive commercialized CO$_2$ sensor for reliable measurement of air quality which changes rapidly by the surrounding environments. And then we develop the wireless sensor nodes and the gateway applied for remote air quality monitoring. In addition, web server program was realized to manage air quality in the subway platform. This result will be valuable for a basic research for air quality management in underground spaces for future study.

A Study for Application of Train Information Collection Device using RTD System (무선 전송 장치를 이용한 열차정보 수집 장치 개선 방안에 관한 연구)

  • Shin, Han-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.6
    • /
    • pp.541-545
    • /
    • 2010
  • Because contemporary rolling stock system is complex and highly advanced, and it builds mutual interface, it is necessary to manage maintenance of rolling stock systematically. This study present a case, which shows how to adopt and apply RTD(Remote Transmission Device) integrated to train information collection device. After the train service is complete and the train enters the main subway station, various kinds of information collected from TCMS(Train Control Monitoring System) is transmitted to train depot information collection device through RTD. This study suggests that RTD integrated to train information collection device helps build an effective rolling stock maintenance system by improving reliability of data transmission and cutting maintenance costs.

A Study for Applied In the Transfer of Train Information using RTD System (열차종합제어장치 정보전송시 RTD시스템을 적용한 사례 연구)

  • Shin, Han-Chul;Kim, Jung-Hyun;Kim, Sang-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2011.01a
    • /
    • pp.109-110
    • /
    • 2011
  • Because contemporary rolling stock system is complex and highly advanced, and it builds mutual interface, it is necessary to manage maintenance of rolling stock systematically. This study present a case, which shows how to adopt and apply RTD(Remote Transmission Device) integrated to train information collection device. After the train service is complete and the train enters the main subway station, various kinds of information collected from TCMS(Train Control Monitoring System) is transmitted to train depot information collection device through RTD. This study suggests that RTD integrated to train information collection device helps build an effective rolling stock maintenance system by improving reliability of data transmission and cutting maintenance costs.

  • PDF

Case Studies on Applications of Convergence Measurement Systems at the Stages of Tunnel Construction and Maintenance (터널 시공 및 유지관리 단계 내공변위 계측시스템 적용사례 연구)

  • Lee, Dae-Hyuck;Han, Il-Yeong;Kim, Ki-Sun;Jin, Suk-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.59-69
    • /
    • 2000
  • Three-dimensional total station system which integrated the instrument with Target Pin and TEMS 3D software developed by SKEC R&D center was applied to a tunnel excavation for monitoring of convergence and crown settlement. The efficiency of the system was proved as the result in the aspects of exact monitoring and prediction of rock conditions ahead of the face. To monitor the behavior of tunnel lining at the maintenance stage, DOCS system was applied to the subway tunnel section. Such many effects as the vibration of sensors, verification of the system efficiency, the effect of test trains operation, the variation of temperature and the effect of high voltage was checked. Thus the management scheme for tunnel maintenance was laid out as a proposal.

  • PDF