• Title/Summary/Keyword: Subsystem test

Search Result 139, Processing Time 0.026 seconds

Development and Design Verification of Thermal Control Subsystem for EOS-C Ver.3.0 Flight Model (EOS-C Ver.3.0 비행모델의 열제어계 개발 및 설계 검증)

  • Chang, Jin-Soo;Yang, Seung-Uk;Kim, Ee-Eul
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.10
    • /
    • pp.872-881
    • /
    • 2012
  • The Flight Model (FM) of a high-resolution electro-optical camera (EOS-C Ver.3.0), the mission payload of an Earth observation satellite, was successfully developed by Satrec Initiative. We designed it to give improved thermal representatives compared with the Structural-Thermal Model (STM) by optimizing the thermal characteristics based on the STM thermal vacuum test results. We developed the FM and verified the workmanship by performing the acceptance level thermal vacuum test. We also conducted the verification of its Thermal Mathematical Model (TMM) by the thermal balance test. As the result, it was confirmed that TMM faithfully represents the thermal characteristics of the EOS-C Ver.3.0 FM.

Integeation Test of Coms Image Data Acquisition and Control System (통신해양기상위성 송수신자료전처리시스템 통합 시험)

  • Lim, Hyun-Su;Ahn, Sang-Il;Park, Durk-Jong
    • Journal of Astronomy and Space Sciences
    • /
    • v.25 no.4
    • /
    • pp.471-480
    • /
    • 2008
  • COMS Image Data Acquisition and Control System (IDACS) plays a key role in real time ground processing of Meteorological and Ocean observation data. Beyond processing, it serves processed image data and additional data to end users through the spacecraft in the internationally recommended format. The IDACS will be installed at three location (MSC, KOSC, and SOC) and automatically operated 24h/365days. After the IDACS subsystem tests and inter -subsystem interface tests had been completed in the first half of 2008, the acceptance test which was a comprehensive test performed as an integrated form to verify function performance and operational requirements. This paper introduces test objective, preparation, and major result of the COMS IDACS acceptance test.

Design Verification of Thermal Control Subsystem for EOS-C Ver.3.0 using STM Thermal Vacuum Test Result (STM 열진공 시험 결과를 이용한 EOS-C Ver.3.0 열제어계 설계 검증)

  • Chang, Jin-Soo;Yang, Seung-Uk;Jeong, Yun-Hwang
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.12
    • /
    • pp.1232-1239
    • /
    • 2010
  • A high-resolution electro-optical camera (EOS-C Ver.3.0), the mission payload of an Earth observation satellite, is under development in Satrec Initiative. We designed this system to give improved thermal performance compared with the EOS-C Ver.2.0 which is the main payload of DubaiSat-1 by optimizing the active and passive thermal control design. We developed the Structural-Thermal Model (STM) and verified the design margin by performing the qualification level thermal vacuum test. We also conducted the verification of its Thermal Mathematical Model (TMM) through the thermal balance test. As a result, it was confirmed that TMM faithfully represents the thermal characteristics of the EOS-C Ver.3.0.

소형위성 기능시험 및 열주기 시험

  • Park, Jong-Oh;Choi, Jong-Yeon;Kwon, Jae-Wook;Youn, Young-Su;Cho, Seung-Won;Kim, Young-Youn;An, Jae-Chel;Choi, Seok-Won
    • Aerospace Engineering and Technology
    • /
    • v.2 no.2
    • /
    • pp.58-65
    • /
    • 2003
  • KARI Electrical Test Team performed the SOH (State Of Health) test and Thermal Cycling test for small satellite of KOMPSAT-1 PFM at KARI SITC Highbay as per Storage plan every year, and verified that the system/subsystem units function installed on PFM were good without significant degradation causing from long-term storage. This paper describes the test items, test method, test procedure and selected test result data.

  • PDF

A Study on Test Working of Signalling System (신호시스템 시운전 시험 연구)

  • 정의진;황종규;이종우
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.157-163
    • /
    • 2000
  • Testing evaluation is a part of process for design, production, evaluation, operation and abolition, and is the process of certifying system performance. The main purpose of testing evaluation is to reduce the risk factor under the determining process. Testing process has the three step such as design qualification, integration and validation test in factory, system integration and commissioning test. Design Qualification is to verify errors on the design process. Integration and validation test in factory is for the H/W and S/W of an equipment and is to verify interface of subsystem, communication protocol and main functions. System integration and commissioning test is a functional test to adjust successful installation of equipment. According to the testing process, briefly consideration for test item, test method and test contents about signalling system is carried out.

  • PDF

DESIGN OF COMMON TEST HARNESS SYSTEM FOR SATELLITE GROUND SEGMENT DEVELOPMENT

  • Seo, Seok-Bae;Kim, Su-Jin;Koo, In-Hoi;Ahn, Sang-Il
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.544-547
    • /
    • 2007
  • Because data processing systems in recent years are more complicated, main function of the data processing is divided as several sub-functions which are implemented and verified in each subsystem of the data processing system. For the verification of data processing system, many interface tests among subsystems are required and also a lot of simulation systems are demanded. This paper proposes CTHS (Common Test Harness System) for satellite ground segment development which has all of functions for interface test of the data processing system in one PC. Main functions of the CTHS software are data interface, system log generation, and system information display. For the interface test of the data processing system, all of actions of the CTHS are executed by a pre-defined operation scenario which is written by purpose of the data processing system test.

  • PDF

Observer Theory Applied to the Optimal Control of Xenon Concentration in a Nuclear Reactor (옵저버 이론의 원자로 지논 농도 최적제어에의 응용)

  • Woo, Hae-Seuk;Cho, Nam-Zin
    • Nuclear Engineering and Technology
    • /
    • v.21 no.2
    • /
    • pp.99-110
    • /
    • 1989
  • The optimal control of xenon concentration in a nuclear reactor is posed as a linear quadratic regulator problem with state feedback control. Since it is not possible to measure the state variables such as xenon and iodine concentrations directly, implementation of the optimal state feedback control law requires estimation of the unmeasurable state variables. The estimation method used is based on the Luenberger observer. The set of the reactor kinetics equations is a stiff system. This singularly perturbed system arises from the interaction of slow dynamic modes (iodine and xenon concentrations) and fast dynamic modes (neutron flux, fuel and coolant temperatures). The singular perturbation technique is used to overcome this stiffness problem. The observer-based controller of the original system is effected by separate design of the observer and controller of the reduced subsystem and the fast subsystem. In particular, since in the reactor kinetics control problem analyzed in the study the fast mode dies out quickly, we need only design the observer for the reduced slow subsystem. The results of the test problems demonstrated that the state feedback control of the xenon oscillation can be accomplished efficiently and without sacrificing accuracy by using the observer combined with the singular perturbation method.

  • PDF

A review of ATKP LEU System's Test procedure (자동열차보호장치(ATP) 지상설비 시험절차에 대한 고찰)

  • Chang, Seok-Gahk;Kim, Jin-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1480-1483
    • /
    • 2009
  • The KNR wayside and onboard subsystem has completed commissioning tests applicable to the Pilot Line section by BOMBARDIER. Andreas Hardt/Assessor and Rod Muttram/VP, Quality & safety approved the Automatic Train Protection(ATP) System. However additional evidences are necessary to come to a Specific Application, which is mandatory to approve the Generic Applications included for commercial running on the overall main line railway with ATP. According to Factory Acceptance Test plan, CBC, CBF, LEU(Line Electronic Unit) made by domestic factory is tested by official recognition test Standards-Setting Agency. It is important to verify quality which form checklist during Factory Acceptance Test. In this paper, review the process, test item, norm and checklist for the CBC, CBF, LEU.

  • PDF

Performance Evaluation of Data Archive System for High-Speed Saving of Correlated Result of Daejeon Correlator (대전상관기의 상관결과 고속저장을 위한 데이터아카이브 시스템의 성능시험)

  • Roh, Duk-Gyoo;Oh, Se-Jin;Yeom, Jae-Hwan;Oh, Chung-Sik;Yun, Young-Joo;Jung, Jin-Seung;Jung, Dong-Kyu
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.15 no.2
    • /
    • pp.55-63
    • /
    • 2014
  • In this paper, we introduce the performance evaluation of data archive system for saving correlation result of Daejeon correlator with high-data rate. Daejeon correlator supports various correlation modes, but the speed of correlation result is affected by correlator according to the integration time in each mode. Maximum data rate of Daejeon correlator is 1.4GB/s in case of C1 mode with 25.6ms integration time. In this research, the performance evaluation of the proposed data archive system is conducted for saving correlation results connected with 4 10GbE optical cable with VCS (VLBI Correlation Subsystem), which is the core system of Daejeon correlator. For the experiments, the data archive system for 2 benders was selected and benchmark test was performed. In this paper, the developed data generation program of VCS correlation result file for benchmark test and evaluation results are described.

Hot Firing Test of a Quadrature NEA SSD9103S1 Configuration

  • Ja-Chun, Koo;Hee-Sung, Park;Max, Guba
    • International Journal of Aerospace System Engineering
    • /
    • v.9 no.2
    • /
    • pp.1-9
    • /
    • 2022
  • The NEA release mechanism is used to provide restraint and release functions with low shock for critical deployment operations on solar arrays after launch. The GK3 solar array consists of 2 wings and 6 hold down points per panel. The NEA SSD9103S1 is a part of the GK3 solar array hold-down and release mechanism. Each NEA unit is equipped with two Z-diodes which provide power to a NEA unit connected in series after actuation of the fuse wire. This paper presents the hot firing test results of a quadrature NEA SSD9103S1 configuration. One output powers a maximum of 4 NEA SSD9103S1 units simultaneously. The necessary actuation pulse duration has been determined to meet margin requirement for thermal energy of minimum 4. Actuation thermal energy difference is about 6.6% between each half of two fired serial NEAs. Thermal energy margin at worst case is minimum 5.9 in case of an actuation pulse duration of 500 ms. Two series Zener impedance depend on current applied has been characterized by an additional actuation after all fuse wires are open circuit. Total number of actuation commands to the GK3 NEA unit reduce drastically from 24 in case of single NEA configuration down to 8 in case of parallel and quadrature NEA configurations. It can be accommodated by the existing HP2U Pyro design without any impact.