• Title/Summary/Keyword: Subsystem Interface

Search Result 86, Processing Time 0.026 seconds

Computerized Decision Support System for Real-time Flood Forecasting and Reservoir Control (홍수시(洪水時) 저수지(貯水池) 실시간(實時間) 운영(運營) 의사결정(意思決定) 지원(支援) 시스템)

  • Ko, Seok Ku;Lee, Han Goo;Lee, Hee Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.1
    • /
    • pp.131-140
    • /
    • 1992
  • For a real-time flood forecasting and reservoir control problem of a multipurpose dam, the online acquisition of hydro-meteorological data and computerized analysis of the acquired data are absolutely necessary for the prompt decision of reservoir discharges which can minimize the possible damages and simultaneously maximize the utilization of the runoff. By introducing a man-machine interface such as condensed color graphics of the analyzed results, it is much easier and faster to transform the information to the decision maker who can decide the reservoir discharge. The newly developed PC-REFCON, which represents the PC based real-time flood forecasting and reservoir control, can easily handle the above problems by adopting a innovative decision support system. The system has three principal components of, a data base subsystem which acquires and manages real-time data, a model subsystem which forecasts the flood runoff and simulates the reservoir operation, and a dialogue subsystem which helps decision maker and system engineers using various graphics and tables with renovative methodologies. The developed PC-REFCON will be utilized from the coming Summer of 1992 for the flood control of all the nine multipurpose reservoirs in Korea.

  • PDF

Development of KOMPSAT-2 Vehicle Dynamic Simulator for Attitude Control Subsystem Functional Verification

  • Suk, Byong-Suk;Lyou, Joon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1465-1469
    • /
    • 2003
  • In general satellite verification process, the AOCS (Attitude & Orbit Control Subsystem) should be verified through several kinds of verification test which can be divided into two major category like FBT (Fixed Bed Test) and polarity test. And each test performed in different levels such as ETB (Electrical Test Bed) and satellite level. The test method of FBT is to simulate satellite dynamics with sensors and actuators supported by necessary environmental models in ETB level. The VDS (Vehicle Dynamic Simulator) try to make the real situation as possible as the on-board processor will undergo after launch. The purpose of FBT test is to verify that attitude control logic function and hardware interface is designed as expected with closed loop simulation. The VDS is one of major equipments for performing FBT and consists of software and hardware parts. The VDS operates in VME environments with target board, several commercial boards and custom boards based on the VxWorks real time operating system. In order to make time synchronization between VDS and satellite on-board processor, high reliable semaphore was implemented to make synchronization with the interrupt signal from on-board processor. In this paper, the real-time operating environment used on VDS equipment is introduced, and the hardware and software configurations of VDS summarized in the systematic point of view. Also, we try to figure out the operational concept of VDS and AOCS verification test method with close-loop simulation.

  • PDF

Design of Deterministic Task Scheduling Software for MSC

  • Heo, Haeng-Pal;Yong, Sang-Soon;Kong, Jong-Pil;Kim, Young-Sun;Youn, Heong-Sik
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.241-241
    • /
    • 2002
  • MSC(Multi-Spectral Camera) is a main payload of KOMPSAT(Korea Multi-Purpose Satellite)-II which will be launched in 2004. MSC will perform his mission with the GSD(Ground Sample Distance) of 1m, swath width of 15km and spectral range of 450nm~900nm at the altitude of 685km. MSC consists of three main subsystems. One is EOS(Electro-Optics Subsystem), another is PMU(Payload Management Unit) and the other is PDTS(Payload Data Transmission Subsystem). There is an SBC(Single Board Computer) in the PW to control all the other units and SBC software performs the interface with spacecraft and control all MSC sub-units. SBC software consists of a lot of tasks and manages them with the time criticalness. All tasks are designed to be scheduled and executed at the predetermined time in order to make sure that the mission of MSC system is achieved successfully. In this paper, the real-time task scheduling of the SBC software will be described and analyzed.

  • PDF

RESEARCH OF COMMUNICATION SCHEDULING BETWEEN COMPUTER I/O AND S/W FOR ACQUISITION OF SATELLITE SENSORED DATA

  • Koo, Cheol-Hea;Park, Su-Hyun;Kang, Soo-Yeon;Yang, Koon-Ho;Choi, Sung-Bong
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.196-199
    • /
    • 2006
  • Various communication mechanisms have been developed to acquire a meaningful data from sensors. The key requirement during the sensor data acquisition is determinism and reduction of time dependency. It is a fundermental level of satellite data management for controlling satellite operation software data acquisition from sensors or subsystem. Satellite operation software has various software modules to be operated in addition to data acquisition. Therefore, unnecessary time delay shall be minimized to perform the data acquisition. As the result, interrupt method might be prefered than polling method because the former can decrease the restriction of design during implementation of data acquisition logic. The possible problems while using interrupt method like as interrupt latency caused by delaying of interrupt processing time are analyzed. In this paper, communication mechanism which can be used to interface with satellite computer and subsidary subsystem by using interrupt is presented. As well, time dependency between software scheduling and data acquisition is analyzed.

  • PDF

Launch and Early Orbit Phase Simulations by using the KOMPSAT Simulator

  • Lee, Sanguk;Park, Wan-Sik;Lee, Byoung-sun;Lee, Ho-Jin;Park, Hanjun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.33-36
    • /
    • 1999
  • The KOMPSAT, which is scheduled to be launched by Taurus launch vehicle in late November of 1999, will be in a sun-synchronous orbit with an altitude of 685km, eccentricity of 0.001, inclination of 98deg and local time of ascending node of 10:50 a.m. Electronics and Telecommunications Research Institute and Daewoo Heavy Industry had jointly developed a KOMPSAT Simulator as a component of the KOMPSAT Mission Control Element. The MCE had been delivered to Korea Aerospace Research Institute for the KOMPSAT ground operation. It is being used for training of KOMPSAT ground station personnel. Each of satellite subsystems and space environment were mathematically modeled in the simulator. To verify the overall function of KOMPSAT simulator, a Launch and Early Orbit Phase(LEOP) operation simulations have been performed. The simulator had been verified through various tests such as functional level test, subsystem test, interface test, system test, and acceptance test. In this paper, simulation results for LEOP operations to verify flight software adapted into simulator, satellite subsystem models and environment models are presented.

  • PDF

Development of Software Correlator for KJJVC (한일공동VLBI상관기를 위한 소프트웨어 상관기의 개발)

  • Yeom, J.H.;Oh, S.J.;Roh, D.G.;Kang, Y.W.;Park, S.Y.;Lee, C.H.;Chung, H.S.
    • Journal of Astronomy and Space Sciences
    • /
    • v.26 no.4
    • /
    • pp.567-588
    • /
    • 2009
  • Korea-Japan Joint VLBI Correlator (KJJVC) is being developed by collaborating KASI (Korea Astronomy and Space Science Institute), Korea, and NAOJ(National Observatory of Japan), Japan. In early 2010, KJJVC will work in normal operation. In this study, we developed the software correlator which is based on VCS (VLBI Correlation Subsystem) hardware specification as the core component of KJJVC. The main specification of software correlator is 8 Gbps, 8192 output channels, and 262,144-points FFT (Fast Fourier Transform) function same as VCS. And the functional algorithm which is same as specification of VCS and arithmetic register are adopted in this software correlator. To verify the performance of developed software correlator, the correlation experiments were carried out using the spectral line and continuum sources which were observed by VERA (VLBI Exploration of Radio Astrometry), NAOJ. And the experimental results were compared to the output of Mitaka FX correlator by referring spectrum shape, phase rate, and fringe detection and so on. Through the experimental results, we confirmed that the correlation results of software correlator are the same as Mitaka FX correlator and verified the effectiveness of it. In future, we expect that the developed software correlator will be the possible software correlator of KVN (Korean VLBI Network) with KJJVC by introducing the correlation post-processing and modifying the user interface as like GUI (Graphic User Interface).

Modeling and Verification of A data registry-based Management System for Network Object (데이타 레지스트리에 기반한 네트워크 객체 관리 시스템의 모델링 및 검증)

  • 최오훈;백두권
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.05a
    • /
    • pp.61-65
    • /
    • 2002
  • These days, in order to satisfy the complex and various demands of the customers, the telecommunication networks must provide rapid and flexible services, with the support of efficient service and network management systems. To satisfy these requirements, many objects for management have been released to manage network services and elements. But there are no efficient ways to manage these newly managed objects in object-oriented software. Therefore, we study several problems, when a subsystem using object-oriented technique is implemented. The first problem is that interface works between realized application programs using its technique. The second problem is that reusability of internal managed objects is difficult. In this paper, we will point out some problems and to solve these problems, we have proposed the Object Management System (OMS) architecture, which supports a transparent interface between object-oriented applications and the distributed data repositories. Also in order to manage efficient business objects stored in the different repositories, we suggest a method for integrating dynamic information resources in heterogeneous and distributed network environments. Finally, we applied OMS to TINA(Telecommunication Information Network Architecture) domain, implemented OMS, and verified it with SMV(Symbolic Model Verifier) which is model checking technology.

  • PDF

A study on the Technological Criteria for the Development of an Low Earth Orbit Meteorological Satellite (저궤도 기상위성 개발 기술 기준에 관한 연구)

  • Eun, Jong-Won
    • Journal of Satellite, Information and Communications
    • /
    • v.7 no.1
    • /
    • pp.116-121
    • /
    • 2012
  • For the purpose of drawing out the technological criteria for the development of an Low Earth Orbit Meteorological Satellite some characteristics of infrared and microwave sensors on the payload were analysed by approaching theoretically. In addition, the channel requirements and interface requirements of the microwave sensors equipped on the payloads of the existing foreign Low Earth Orbit Meteorological Satellites were analysed with respect to the development of an Earth Orbit Meteorological Satellite payload. In this paper, the multipurpose satellite bus and the CAS 500 platform as the interface requirements of an Low Earth Orbit Meteorological Satellite, and core subsystem and principle functional requirements of a satellite control system were systematically described.

Implementation of Low-Speed Subscriber Interface in BSC(Base Station Controller) based on ATM (ATM 기반 기지국 제어기에서 저속 가입자 인터페이스 구현)

  • 박재영;최억우허용민홍진표
    • Proceedings of the IEEK Conference
    • /
    • 1998.10a
    • /
    • pp.115-118
    • /
    • 1998
  • ATM(Asynchronous Transfer Mode)을 기반으로한 BSC(Base Station Controller)를 이용한 무선 이동통신망에서는 크게 MSC, BSC, BTS로 구성 되어진다. BSC는 MSC(Mobile Switch Center)와의 STM-1급 (155.52Mbps) 정합이 이루어지며, 여러 BTS(Base Transceiver Subsystem)와 T1(1.544Mbps)/E1(2.048Mbps)급 정합이 이루어져 호연결, 관리, 제어 및 MT(Mobile Terminal)의 soft-handoff를 담당한다. BSC내의 저속 가입자 I/F에서는 BTS와 BSC내의 ATM switch와의 정합을 수행하면서 VPI/VCI변환, BSC 내부 cell format으로 변환, 그리고 UPC(Usage Parameter Control)등이 이루어진다. 본 논문에서는 ATM switch를 이용한 BSC 내부의 저속 가입자 I/F의 구현에 관해서 살펴본다.

  • PDF

On the Design of Optimal Response Time in Computer Terminal Networks

  • An Young-Ki
    • Journal of the military operations research society of Korea
    • /
    • v.2 no.1
    • /
    • pp.185-194
    • /
    • 1976
  • A terminal response time analysis for a general class of terminals-to-computer subsystem is presented in this paper. On the point of the front view, it should be considered for R.O.K. Military Defense to set up the communication network in order to facilitate for the currency of the information and the data communication system. The model used to study is based on the advanced data communications system in which terminals are connected to Terminal Control Units(TCU) that are in turn connected to local Front-End Processor(FEP). The line control procedures used to interface a TCU and an FEP may be half-duplex Binary Synchronous Communication(BSC), half-duplex Synchronous Data Link Control(SDLC), or full-duplex SLDC. This paper will contribute to facilitate the initial phase of system design and configuration for the Military Defense Communication Network System in future.

  • PDF